What's new

Infrastructure Development in Pakistan

19042012480_zpsb15e1bb0.jpg


19042012495_zps476db464.jpg


19042012496_zps5186e8d1.jpg


19042012497_zps51b66a82.jpg


19042012504_zpsf0a40a67.jpg


19042012505_zps6c9b08a3.jpg


Bahria Icon Hotel Tower 45 Fl Pilling work

399933_541986265840623_338067223_n.jpg


BtitowersDiagram_zpsed5f26f0.png
 
.
Karachi: Malir Cantt

The Malir Cantonment is a cantonment town of the city of Karachi, in Sindh, Pakistan. It serves as a military base and residential establishment. Roughly, the population of Malir Cantt is around 300,000 and includes all the ethnic and linguistic groups of Pakistan.

Majority of its population consists of serving and retired armed services personnel along with civilians, bureaucrats etc. Malir Cantt is considered as a posh, serene and peaceful not to mention the safest locality of Greater Karachi.

Askari-V is located within the limits of Malir Cantt. Askari-V Housing Scheme is a very posh housing scheme consist of bungalows for retired Brigadiers and Colonels, and apartments for junior officers. It has its own perimeter security, so is considered one of the most secure residential locations in Karachi. All the apartments in Askari 5 consists of 3 bedrooms with attached bath, Drawing, Dinning, Lounge, Kitchen, Store and Servant Quarter.

Ground+5-Apartments-at-Askari-V-Malir-Cantt-Karachi-3.jpg

Ground+3-Type-I-Apartments-at-Askari-V-Malir-Cantt-Karachi-2.jpg

Ground+3-Type-II-Apartments-at-Askari-V-Malir-Cantt-Karachi-5.jpg

Ground+3-Type-II-Apartments-at-Askari-V-Malir-Cantt-Karachi-12.jpg

Ground+3-Type-II-Apartments-at-Askari-V-Malir-Cantt-Karachi-13.jpg

Ground+3-Type-II-Apartments-at-Askari-V-Malir-Cantt-Karachi-14.jpg

Ground+3-Type-II-Apartments-at-Askari-V-Malir-Cantt-Karachi-16.jpg
 
. . .
Lahore

Gulberg Galleria

8688142251_faac2a49d8_b.jpg

8688140663_53d16db671_b.jpg


Pak Tea House

44402_10151443384298214_424027514_n.jpg

923542_10151443384198214_1752459328_n.jpg



EOBI Hotel & Mixed Use Development

8695242125_b9d406a4b9_b.jpg

8696364144_fb67dbd85c_b.jpg


Gujranwala

GT Road Flyover

942847_577948175558599_641987812_n_zps78ccbed7.jpg
 
. .
Gujranwala GT Road Flyover

4.JPG

4.JPG

6.JPG

8.JPG


Peshawar: Shaukat Khanum Hospital

943497_10151434505617029_1789434833_n.jpg

945173_10151434505547029_1698482377_n.jpg

601924_10151434505447029_1794148099_n.jpg

11816_10151434505232029_1786378821_n.jpg
 
.
Karachi

Unknown Project

tower-img1-lighbox.jpg

tower-img2-lighbox.jpg

tower-img3-lighbox.jpg

tower-img4-lighbox.jpg


Unknown Residencial Highrise Projects of 2008
On Rashid Minhas Road:

03.jpg

April%20Final.jpg

1.jpg

4.jpg
 
.
Karachi:

BROADWAY CENTER, MAIN CLIFTON ROAD, Project of 2008

01.jpg

02.jpg

03.jpg


The Centre

IMAG1182_zps1673e054.jpg

IMAG1183_zpsa4ee2f4e.jpg

IMAG1184_zps1f12d274.jpg


Centre Point

afdfdfds_zpsccaaa708.png


Un-Official Renders

2s_zps3cdf1a61.jpg
 
. . .
Hyatt hotel is alao under conatruction in Islamabad, any latest pics?
 
.
Hyatt hotel is alao under conatruction in Islamabad, any latest pics?

d399a9389eb511e2a9ce22000a9e02ef_7.jpg

88359314.jpg

DSCN5508_zps1059fd19.jpg


Columns for 21st floor.
8462452160_2f312320a3_c.jpg


Covering negligence: CDA allows hotel complex to add fourth tower

541798-CDA-1367194735-316-640x480.jpg


ISLAMABAD: The Capital Development Authority (CDA) has allowed the construction of an additional tower at an under construction five-star hotel complex just to hide its negligence.

Earlier, the CDA allowed the administration of the Grand Hyatt to build three 730-foot towers near Jinnah Convention Centre, neglecting the Civil Aviation Authority (CAA) rules, which only permit buildings up to 300 feet high within a 15-kilometre radius of the airport.

“The Grand Hyatt administration has been allowed to build a fourth tower in addition to the existing three towers to compensate the lessee against the height restriction,” a senior CDA official told The Express Tribune.

The amended agreement between the consortium of three firms — Bismillah, Niagra and Paragon (BNP) — and the CDA was reached after the CAA and the Pakistan Air Force raised objections over the height of the building.

In 2005, BNP offered the highest bid of Rs4.89 billion for a 13.5 acre plot. Consequently, the city managers approved 47-storey buildings on the site.

Under the agreement, BNP group was supposed to pay 15 per cent (Rs732.352 million) of the total amount of the plot in advance and the remaining 85 per cent was to be paid over a period of 15 years in equal annual instalments of Rs270.7 million.

However, BNP paid no instalment for two years, and an amended lease was executed in 2007. Under the amended lease, BNP was asked to pay Rs120 million in advance, with the remained coming in instalments of Rs335 million per year. The BNP group paid the advance amount of Rs120 million, but the remaining instalments are still to be paid.

So far, BNP group has paid off Rs 852.352 million of the Rs4.89 billion due.

According to CDA sources, the BNP group has justified delaying payments by referring to the height restriction issue .

A recent judicial commission report said that, “Due to non-assessment of eventual bottlenecks, the payment was sufficiently prolonged for a period of eight years, which has brought about a considerable monetary loss to the CDA.”

The commission’s report said the CDA did not take prior permission to relax the CAA’s height restriction, and due to the eventual objection of the authorities, the CDA was forced to rework the payment schedule and the lease.

The report says that even after rescheduling the lease, BNP group did not pay the instalments. “The lease amount, outstanding till date, shall be recovered from the lessee by all means including coercive measures,” the report recommended.

The commission has also recommended strict action against the delinquent officers who struck the agreement with the group without taking CAA rules and other issues into consideration.

Covering negligence: CDA allows hotel complex to add fourth tower – The Express Tribune
 
. .
Lahore:

MCB IT Centre

Cladding started
8713705634_55a2ac3048_b.jpg

8712583643_2a12c19ce3_b.jpg

8713705308_6ffbb039b7_b.jpg

8712583199_1894f5bcaa_b.jpg

8713704982_2888e22560_b.jpg


Parking Plaza, Moon market Allama Iqbal town

Working on 4th and 5th floor
070520133273_zps26067441.jpg

070520133275_zps80dd6c0e.jpg


Gawalmandi Food Street

p2_34.jpg
 
.
Back
Top Bottom