What's new

Infrastructure Development in Pakistan

'Pedestrian Underpass' Muslim Town: Lahore:

420966_108060922686115_1060051145_n.jpg

3758_104307856394755_1403731048_n.jpg

541330_104307966394744_447915811_n.jpg

317512_104308469728027_191003371_n.jpg
 
.
Model Town Underpass
552219_104306923061515_1747845087_n.jpg

552752_104307546394786_822313900_n.jpg

311182_105903292901878_1302467900_n.jpg

374170_105903622901845_1694051667_n.jpg

576418_106951282797079_331736996_n.jpg

30753_108060736019467_405315780_n.jpg

254526_108060816019459_1830100551_n.jpg

Work is going on faster in lahore underpases and BRTs

In karachi there are also four flyovers underconstruction on same road at same time and 8 flyovers in all city!
 
.
Lahore is witnessing one of the highest development rate in the history of pakistan and india combined. New flyovers, BRTs, roads carpeting, underground tunnels, pedestrian bridges, renevation, etc. There is just too much going on in lahore. Many people are also protesting but those narrow minded only look at their today. They have forgotten how all these developments are going to help them and above all THEIR CHILDREN in future. People in pakistan have forgotten to give sacrifices, they want everything today, and leave nothing for tomorrow. These projects will help lahore in the future. InshaAllah

In Punjab, its not just Lahore but also Multan, Faislabad, and Rawalpindi. They too are getting Flyovers, Solar Street Lights, Roads, Waste Management organizations, A/C Buses, Medical Colleges, and etc...
 
.
In Punjab, its not just Lahore but also Multan, Faislabad, and Rawalpindi. They too are getting Flyovers, Solar Street Lights, Roads, Waste Management organizations, A/C Buses, Medical Colleges, and etc...

karachi too is developing, Thanks to MQM or those ganjas Shahs are of no use, Puppets of zardari only there for looting!!
 
.
Metro bus service to give modern era to transport system: Shahbaz
metro-bus-service-to-give-modern-era-to-transport-system-shahbaz-1350228492-8390.jpg

Punjab Chief Minister Shahbaz Sharif has said that the metro bus service would give a new modern era to the transport system of Lahore with affordable and rapid transport facilities.
Visiting the Metro Bus Service Project site on Sunday, he said that the metro bus service project will soon be opened for the general public, with a very affordable fare which will be within the reach of every common man, he added.
Shahbaz stated that that the metro bus service will be completely free of cost for the people in the first four month, as the service resumes its service.
He observed that the modern service of metro bus service will revolutionize the transport system in Lahore with giving it a new identity.
The Chief Minister directed the DG LDA to consider the project of making Qurtaba Chowk interchange signal-free from every aspect, and sought a report within 24 hours.
 
.
451176-BusRapidTransit-1350160875-401-640x480.jpg

Planning and development: Rs3.1 billion funding approved for rapid bus

LAHORE:
The Provincial Development Working Party has approved funding for six development schemes for the Punjab, including Rs3,156.632 million for the Metro Bus Service. The money will be spent on building escalators and platform screen doors at bus stops, according to the title of the project.
The PDWP also approved funding of Rs4,459.021 million for the other five projects at its 15th meeting of the fiscal year, presided over by Planning and Development Board Chairman Javaid Aslam.
These schemes include a project for the rehabilitation of the 41.8km Gujranwala-Hafizabad road at a cost of Rs1,772.092 million; the widening and improvement of the 33.07km Qaziabad MM Road to Nawan Kot in Layyah district at a cost of Rs403.399 million; the widening and improvement of the Khushab-Muzaffargarh road (the 83.82km section from the Jhang district boundary to Muzaffargarh) at a cost of Rs2,263.785 million; a feasibility study and design review (PC-II) for the Leh Expressway in Rawalpindi at a cost of Rs14.745 million; and a feasibility study and planning and design review (PC-II) for a waste water treatment plant at Awan Chowk in Gujranwala at a cost of Rs5 million.
Planning and Development Secretary Arif Anwar Baloch also attended the meeting.

Planning and development: Rs3.1 billion funding approved for rapid bus – The Express Tribune
 
.
Metro bus service to give modern era to transport system: Shahbaz
metro-bus-service-to-give-modern-era-to-transport-system-shahbaz-1350228492-8390.jpg

Punjab Chief Minister Shahbaz Sharif has said that the metro bus service would give a new modern era to the transport system of Lahore with affordable and rapid transport facilities.
Visiting the Metro Bus Service Project site on Sunday, he said that the metro bus service project will soon be opened for the general public, with a very affordable fare which will be within the reach of every common man, he added.
Shahbaz stated that that the metro bus service will be completely free of cost for the people in the first four month, as the service resumes its service.
He observed that the modern service of metro bus service will revolutionize the transport system in Lahore with giving it a new identity.
The Chief Minister directed the DG LDA to consider the project of making Qurtaba Chowk interchange signal-free from every aspect, and sought a report within 24 hours.

451176-BusRapidTransit-1350160875-401-640x480.jpg

LAHORE:
The Provincial Development Working Party has approved funding for six development schemes for the Punjab, including Rs3,156.632 million for the Metro Bus Service. The money will be spent on building escalators and platform screen doors at bus stops, according to the title of the project.
The PDWP also approved funding of Rs4,459.021 million for the other five projects at its 15th meeting of the fiscal year, presided over by Planning and Development Board Chairman Javaid Aslam.
These schemes include a project for the rehabilitation of the 41.8km Gujranwala-Hafizabad road at a cost of Rs1,772.092 million; the widening and improvement of the 33.07km Qaziabad MM Road to Nawan Kot in Layyah district at a cost of Rs403.399 million; the widening and improvement of the Khushab-Muzaffargarh road (the 83.82km section from the Jhang district boundary to Muzaffargarh) at a cost of Rs2,263.785 million; a feasibility study and design review (PC-II) for the Leh Expressway in Rawalpindi at a cost of Rs14.745 million; and a feasibility study and planning and design review (PC-II) for a waste water treatment plant at Awan Chowk in Gujranwala at a cost of Rs5 million.
Planning and Development Secretary Arif Anwar Baloch also attended the meeting.

Planning and development: Rs3.1 billion funding approved for rapid bus – The Express Tribune

When will this be completed? And what buses are to be used?
 
.
I wanna hear more news of Industrial developments.

Pakistan need industries/companies/enterprenours that are 100% Pakistani owned having their branches/plants in US/Europe etc which would import Raw material from these Pakistani plants & finish the product in US/Europe as well as Pakistan, this will increase exports from Pakistan & on the same time give great opportunity to other Pakistani Companies for their name & origin to be trusted. What say?:azn:
 
. . .
Under-construction flyover to be completed by December


Karachi

The Karachi Metropolitan Corporation (KMC) has said that the under-construction flyover being built near the Jinnah Terminal would be completed in December and would then be opened for vehicular traffic.

This was stated by KMC Administrator Muhammad Hussain Syed on Saturday while chairing a meeting to review the development works related to various under-construction flyovers in the city.

The KMC chief said that the work orders had been issued for constructing the Mehran Hotel Underpass to make Sharea Faisal signal-free for vehicular traffic and development works in this connection would soon be launched.

He said that developments works related to four flyovers being built on various traffic intersections of Shahrah-e-Pakistan related to corridor-V, had been started. He said that the ground-breaking of the flyover to be built on Nazimabad Chowrangi, would be performed in the current month.

The KMC administrator said that the construction material being used in development works related to under-construction flyovers, should be of international standard.

Briefing on the occasion, KMC’s Director-General Technical Services Altaf G Memon said that the flyover being built on the Water Pump traffic intersection would be 460 metres long, having eight spans, 64 girders, 12 piles.

This flyover, costing around Rs493.95 million, would facilitate the traffic coming from Sohrab Goth, Gulberg, Azizabad, North Nazimabad, North Karachi, areas of the city.

The flyover being built on Ayesha Manzil traffic intersection would cost around Rs377 million and it would also be 460 metres long. The flyovers would have three lanes on both sides, having eight spans, 64 girds, and 112 piles. The flyover would facilitate the traffic coming from Sohrab Goth, Nazimabad, and Yaseenabad.

The flyover being built on the Dakhana Chowrangi intersection would have three lanes on both sides and it would facilitate the traffic coming from Teen Hatti to Liaquatabad. The flyover would be 460 metres long and it would cost around Rs369.978 million.

The flyover being built on the busy traffic intersection of Teen Hatti would cost around Rs266.65 million and it would facilitate the traffic emerging from Lasbela, Liaquatabad, Martin Road, Pir Colony, Sharea Faisal, Gulshan-e-Iqbal.

Source PDF
 
. . .
Its 100 m (328 ft) Also known as orbit center, officially there are 24 floors i think,

THE BUILDING HAV ALREADY RISES TO ABT 105 M & 25 FLOORS ARE ALREADY BUILT & THE COLUMNS ARE UP FOR 26 FLOORS IT SEEMS TO HAVE ARROUND 27 OR 28 FLOORS IN TOTAL BUT DONT KNOW ABT THE HEIGHT.....
P.S: I SEE THIS BUILDING EVERY DAY WHEN I GO FROM SHARA-E-FAISAL
 
. .
Back
Top Bottom