Ruhnama
FULL MEMBER
- Joined
- Jul 19, 2019
- Messages
- 631
- Reaction score
- 0
- Country
- Location
https://www.defenceconnect.com.au/l...rate-commence-initial-mgcs-architecture-study
Prabowo should look into this compared to the Altay.
If we REALLY want to have a different MBT without shooting ourselves in the foot again with non-standardized vehicles then it's a no-brainer that we take something that uses the same hull as the Leopard 2.
Oh seriously altay? They still have problem for engine. Dont know are germany willing to sell engine if maybe we get "indoneisnized only altay" so turks didnt get engine we get (konyol sih enmang) dont forget BMC company...
In Mgcs program polish and italian interest on it. But are this mgcs maybe will beeuropean project ?