trishna_amṛta
FULL MEMBER
- Joined
- Jun 4, 2018
- Messages
- 612
- Reaction score
- 0
- Country
- Location
http://thorconpower.com/project/
View attachment 578000
View attachment 578001
if i remember correctly according to my lecturer , the plant would be ship based , and PAL would do Cooperation with Daewoo again to build the platform for the reactor
Aaach so it ThorCon that will build the fission module and other critical modules, a perfect choice indeed . Which mean we will have power ship (or barge) to provide power at the eastern part of Indonesia. But seeing that Daewoo & PT PAL also involve it mean it will be power ship instead power barge which is what ThorCon was envision in their original design.