asterisktaker
FULL MEMBER
New Recruit
- Joined
- Sep 29, 2017
- Messages
- 29
- Reaction score
- 0
- Country
- Location
I do understand that the nominal value of DSCA tend to be exeggrated to appease the congress, but the value was based upon requested items and/or services not what is offered. $300 million is the value of contract awarded by U.S DoD to Boeing on behalf of Indonesian government to built and integrate the airframe in Mesa, Arizona, like what mandala posted below, this is not including other contract(s) awarded to another contractor involve in the project, such as; M-TADS/PNVS by Lockheed Martin Corporation in Orlando, Florida; T-700-GE-701D by General Electric Company in Cincinnati, Ohio; Longbow FCR by Lockheed Martin Millimeter Technology in Owego, New York and Longbow Limited Liability Corporation in Orlando, Florida.that value was the value proposed and estimated by the DSCA at 2012 to us congress. the deal itself was formulated in 2013 and it filled with different procurement with the one proposed in that article.
basically that article you attached means that assuming indonesia bought everything and ask for all support, then the cooperation could worth a total of around $ 1.4 billion
the contract itself worth somewhere around 300 to 600 million (i forgot...) google search indonesian apache deal and restrict the search in the year of 2013. you should see that number.
indonesian army was planning to build and develop 8 air squadron (2007 or 2008). requiring somewhere around 130 helis, a buttload of armaments, and spareparts, periodical maintenances. so i guess eventually this cooperation(s) worth around $1.4 billion....
Yes it was $300 million. I think this was for the helicopter frame only. Weapons and other systems are purchased separately.
But the whole acquiistion cost that includes ILS, spare parts, training, engineering and technical support from government and contractor personnel, like what you describe below, will definitely cost more than $300mil, if not closer to the DSCA mark.
thr first 8 apache + armaments + trainings + spare parts and logistical supports = $300ish million or was it 600ish...