DARKY
SENIOR MEMBER
- Joined
- Apr 24, 2011
- Messages
- 2,007
- Reaction score
- 0
Link ?
Discussions with Russia are on to sign the first R&D phase, and the first prototype is likely to be delivered to India in 2014 followed by two more in 2017 and 2019. The series production then “will only be ordered based on the final configuration and performance of the third ptorotype.”
http://www.defence.pk/forums/indian-defence/211756-iaf-transformation-maturing-new-aircraft-more-squadrons.html