Vinod2070
BANNED
- Joined
- Dec 24, 2007
- Messages
- 10,552
- Reaction score
- -2
- Country
- Location
u think s
really??
because isro's budget is only 1 billion dollars and its far too small to keep on doing everything.
and by the way gslv is india's future..................without it we are dependant on others,,,,so all the teams should have been working on that only,we can always plan these missions in the future but gslv is needed for heavier satellites as soon as possible.
besides payload on mom is only like 20 kg or something so in reality it would have been better had we done this mission with gslv in 2016 window as it would have used way bigger and useful payload.
anyone is free to disagree but the fact remains that this mission has little importance except for the pride
All the teams can't work on any single program. There are separate teams that would be working on the rocket programs, the satellites programs and others. These are specialized skills.
I do hope the teams are working in parallel and this mission has not taken away resources from the GSLV program. I agree that is critical for the future.
I don't think this project was a huge part of ISRO's budget to put on hold everything else.