GuardianRED
FULL MEMBER
- Joined
- Jun 17, 2016
- Messages
- 1,313
- Reaction score
- 0
- Country
- Location
IN plan is 5 CV (prospective plan 2030?) ...3 CV of 45000 Ton class INS Vikramaditya, Vikrant, Viraat. 2 CV of 65-70K Ton class Vishal...old Vikrant was decommed when new Viki started build.. old Vir decommed recently when replacement keel laid
Modi doctrine ..less talk more action...do look at other yards ...check dimensions of new build and compare..check builders data..plus discussion with chai biskoot / nariyalpaaniwalas...chk with BRwalas
Obviously the Navy Chiefs know ...build up of capabilities /assets is required considering PLAN plan / build for 4 CBG ..check Dalian...
Bro, sorry you are simply mistaken and only Relying On Bharat-rakshak forums , shown u need to do some research yourself
First, we do know its confirmed that the IN want 3 CGB , this is to be INS Vikramaditiya CGB, INS Vikrant (Commissioning 2018) CBG and INS Vishal (FUTURE) CBG. We do know that INS Viraat is decommissioned.
Second, INS Vikrant (as of current Report and information) will be the first and only one of her Class (40,000 Tons) Note : INS Vikramaditiya (45,000 Tons)
NOW, INS Vishal will be 65,000 Tons (Hence a class of her own) and there are a dozens of reports of it been nuclear powered , on board EMALS Etc!!... last i read that construction was suppose to start on 2011!!.... so far absolute NO reports that this has started!!!!.....u have any proof? or Current reports? or photos - if you have followed the construction of INS Vikramaditiya - we have seen numerous media reports + photos both of construction and floating out and fitment etc.... so where is for INS Vishal? ... She doesn't even had her plans frozen
Final - There is no reports for 2 more aircraft carriers! u r mistaken
Having said that YES , there is IN Plan for LPH/LPD (2-3 Nos.) Tender i think is floated - which u r mistaken for aircraft carriers, where they are technically not the same!
Just do some simple research and not only rely on BR and wiki