Under NDA, railways laid tracks 11.5% faster in first three years than UPA
Indian Railways did track laying work, which includes laying new tracks, doubling the existing lines, and converting narrow gauge to broad gauge, 11.5% faster during the NDA’s initial three-year rule than the Congress-led UPA-II’s.
The Railways has laid 7,666km of tracks during 2014-17 (NDA’s rule), which is 794km more than the UPA-II’s between 2009 and 2012, an RTI response revealed.
Addressing the nation from Red Fort on Independence Day this year, Prime Minster Narendra Modi had said railway tracks are being laid at double the speed. But data from the ministry of railways do not substantiate that claim.The railways’ achievement under the UPA-II’s first year was 27% more than the target. It encouraged the government to set target at 2,301km in 2010-11, 31% more than the last year.
“It outdid the target and laid 2315km length of tracks. But after that there is a constant decrease in the target leading to considerable decline in achievements as well,” says a former member of the Railway Board, requesting anonymity. The change of government at the Centre in May 2014 changed the growth trajectory and the railways, in the next three years, laid down tracks 13% more than its target.
Year Target(Distance in KM) Achievement
2009-10 1745 2222
2010-11 2301 2315
2011-12 2275 2335
2012-13 2200 1811
2013-14 1525 1562
2014-15 1450 1983
2015-16 2500 2828
2016-17 2800 2855
2017-18 3100 716.75 (till Aug 17, 2017)
However, the data defies Modi’s claim that “the railway tracks are being laid at double the speed”. A senior railway official, however, justified his statement, saying, “In 2013-14, railways laid down only 1,562km of track while in 2016-17, it is 2,855. So it’s almost double.”
As far as 2017 is concerned, the initial four and a half months shows only 23% achievement of the ambitious target of 3,100km.
Railway officials say that they are confident of outdoing it as they did in the past.
http://www.hindustantimes.com/india...rs-than-upa/story-ElR4vwQCNW9P91e9vKknjP.html
The Delhi Metro To Dombivali?
With a total network length of 218 km, the Delhi Metro carried an astounding 1,001 million passengers in 2016-17; that is, 2.76 million passengers a day. An eight-coach train running on its various colour-coded lines carries 2,400 passengers during peak hours, or as many as 300 passengers per coach. But the most impressive feature of Delhi Metro lies perhaps somewhere else: it sees no passenger deaths, except for the rare suicides that can be counted on one’s fingers. There is no instance of a Metro passenger dying by falling off from trains—the automated doors ensure that—or, more importantly, due to any accident so far.
Let us compare Delhi Metro’s safety and security performance with that of the Mumbai Suburban Rail system. At 465 km, the latter covers over double the length—and carries 7.5 million passengers a day. The peak capacity is roughly the same: 290 passengers per coach. Each 9-coach EMU train set that we call a ‘Mumbai local’ can carry up to 2,600 passengers, and usually does. So far, so good.
No one falls off a Delhi metro. No one has had any fatal accidents. Who better to crack Mumbai’s puzzle?
But this is where the problem starts. The 2016 CAG report on suburban railways says as many as 3,527 passengers died every year on these Mumbai locals between 2010 and 2014. This is unacceptable by any standards of public transport operation. More shocking are the modes of death: most occurred at line-crossings, or when passengers fell into the platform gap, or fell from running trains, or crashed against poles. Passengers resort to crossing open lines due to inadequate transfer systems; and overcrowding mostly accounts for the rest. But despite similar peak load ratios, Delhi Metro has no such public safety inadequacies. The reason for this near-impeccable safety and security record is simple: the Metro Rail was designed, planned and built by harnessing advanced rail technologies in track guideway infrastructure, station space design for passenger flows and rolling stock design.
Advertisement opens in new window
The glaring glitches in the Mumbai system are presently under the nation’s spotlight. It’s a shame this megacity has to live with a technologically obsolescent “at-grade” (i.e. at the same level as the ground) suburban rail network that’s, by definition, prone to mishaps. The coaches are shabbily designed and furnished. Cleanliness is difficult. The open doors and windows bring in dust and pollution. Then there’s the heat—the coaches are not air-conditioned. Passengers also endure very high decibel levels, above 90, which is injurious to health Incremental, low-budget ‘jugaad’ improvisations have brought no relief to commuters. Because of the Railways’ stubborn refusal to provide better comforts, commuters also resist any fare increase. But with rising incomes, people have the right to seek a drastic change in the way they commute daily.
It’s time, therefore, to look for some disruptive innovation in planning the future of the Mumbai Suburban Rail system. Indian Railways thinks of it as an albatross around its neck; its officials are probably at their wit’s end trying to manage this massive, 2.7 billion passenger business, stretching their low-technology assets and track network capacities to extreme degrees. The more Indian Railways continues with this misadventure, the more they expose rail users to avoidable risks.
Advertisement opens in new window
The first solution that comes to mind is this: why not lease the entire Mumbai Suburban Rail system, including the existing track network, to the Delhi Metro Rail Corporation? The DMRC has the best technology to build a new network along working railway lines, with least disruption to operations. Its planning and implementation capabilities are far superior to that of the Railways. The 1-billion passenger Metro functions with almost zero mishaps—even when they fill a coach with 300 people, users evidently like DMRC’s operations. There’s no better candidate to crack the Mumbai puzzle.
This author’s only worry is that DMRC may not be willing to take up this challenge because its hands are full, with several running projects. Possibly, given the urgent need to reform Mumbai Suburban Rail, a presidential directive initiated jointly by the railway and urban development ministries can compel DMRC to take up the job. Only, DMRC must be endowed with total freedom to modernise the existing system, using the Delhi Metro brand of BG train sets. DMRC need not invest money in those train sets; they can be leased from a new company owned and backed by a consortium of banks.
Advertisement opens in new window
The real purpose is to convert the “at-grade” track system into an elegant, efficient elevated system, on existing railway land, while giving space for right of way in a modular manner. One problem to be addressed is the partial disruption likely when existing lines are dismantled one by one in the Western Railway corridor, and using that space for building an elevated track. This is a huge challenge really, but creative solutions can be found for this.
The bullet train can provide support by sharing a line until the new suburban system is ready.
Another radical thought: the proposed Mumbai-Ahmedabad High Speed Rail (HSR) can come to the rescue here by being temporarily integrated with the suburban network. That would mean accelerating the needed sanctions to kickstart the HSR work, with the mandate to start construction from south Mumbai and complete it in five years. In this scenario, the HSR line can provide support to suburban passengers in the interim. The new HSR stations can share facilities with the suburban system till their own elevated stations are ready.
The only impediment here is ingrained inertia. The railway ministry, with its unwieldy organisational structure both at the central and zonal level, displays an unhealthy zeal for preserving and protecting existing technologies. The ‘nested mutualism’ breeds a conservative spirit—within that comfort zone, they tend to block new technologies from entering and changing existing systems.
Advertisement opens in new window
This conservatism is what we notice in the concerted opposition towards the High Speed Rail project. It is incremental upgrades that suit the existing rail industry players, rather than leapfrogging into advanced HSR technologies as China did. India is several decades behind in high-speed technology research. In fact, neighbourhood nations are developing ultra-high speed trains or vacuum pods at speeds higher than fighter jets with a view to using them for military logistics and missile launches!
The best thing in such a scenario is to go for drastic reforms with a long-term, macro perspective. Now that the government has moved to separate freight business from passenger business by speeding up dedicated freight corridors, the next set of radical and effective reforms will be to take away some of the passenger business segments (like suburban rail and HSR) from conventional railways.
Envisage a DMRC-controlled body looking after the suburban system and an independent regulator, say a National High Speed Rail Commission, reporting directly to the railway minister. Not through the Railway Board, which will tend to behave like a competitor to HSR and any professional suburban system. Many might raise the false alarm of coordination here. But salutary things can be achieved through mutually beneficial contracts.
Advertisement opens in new window
The advantages of creating an entirely new, modern network in place of the decrepit one that exists in Mumbai will be many. Aligning it with HSR means new world-class train sets can bring in a pleasant culture shock among Mumbai suburban rail users even before the elevated track system is built. It may be another culture shock, of course, to encounter one fare for all metros. Adopting Delhi Metro’s Re 1 per km tariff can by itself turn things around, helping pay back the lease charges and also contributing to building the tracks. The per km cost of elevated tracks with a capacity to carry 3.5 million passengers per day need not be more than the cost of building a 16-lane world-class expressway.
When a giant transport network becomes too old and unwieldy, let us not hesitate to dismantle it and shift to better business models. The old ‘Mumbai local’ has done its job for years. Now retire it, free the Mumbaikar from its geriatric pains, keep the railway bureaucracy out, bring in DMRC, and elevate Mumbai’s daily commute to a higher track.
(The author is a former financial commissioner, Indian Railways)
https://www.outlookindia.com/magazine/story/the-delhi-metro-to-dombivali/299411
Wow! Indian Railways Rolls Out First 100% ‘Make In India’ LHB Coaches That Enhance Passengers Safety
Prime Minister Narendra Modi’s dream ‘Make in India’ project just got a boost from Indian Railways! For the first time, Indian Railways has rolled out 100% ‘Make in India’ LHB (Linke-Hofmann-Busch) coaches, with each and every component made in the country. Manufactured at ICF (Integral Coach Factory) at Chennai, the ‘Make in India’ the coaches have been allotted to Western Railways. The technology for making modern coaches was acquired by Indian Railways from Linke-Hofmann-Busch, Germany back in 1995. However, till now even though the coaches were made and assembled here, some components were imported.
“Coach No. LACCN 111 and LSDD 166 with 100% indigenous content was flagged off after inspection from Member Rolling Stock of the Railway Board,” an ICF official told FE Online. Out of the two ‘Make in India’ coaches that have been rolled out by ICF, the non-AC one has 100% indigenous components. The AC coach has one imported component. “The non-AC coaches are fitted with wheel disc manufactured at Rail Wheel Factory at Bangalore. The AC coach has an imported wheel that has been assembled at ICF with some value added component,” the ICF official said.
Asked about how soon the AC coaches will also have 100% indigenous components, the official said, “Member Rolling Stock has said that talks are on with local manufacturers. We should be able to zero in on someone soon. Once that happens, the AC coaches too will have all indigenous components.”
Given the spate of rail accidents over the last year, Indian Railways has decided to stop production of traditional ICF coaches in 2017. Now, ICF Chennai will make only LHB coaches. LHB coaches boast of stainless steel bodies and have anti-climbing features. This ensures that in case of a derailment, the coaches do not pile onto each other, hence making them safer. The LHB coaches also have a graduated release modular braking system the axle mounted disc brakes.
READ Vedanta to invest $10 bn on expanding business across verticals
But, will all of them be 100% ‘Make in India’? Not yet, that’s a gradual process, says the ICF official. “We have been asked to almost double our production of LHB coaches, so 100% ‘Make in India’ will take some time to be absorbed completely,” he says, adding that focus is on meeting the twin goals of safety and ‘Make in India’.
Meanwhile, ICF is also working on project ‘Train-2018’ – a technological leap for the coach factory under which ‘Make in India’ self-propelled train sets will be manufactured. The ‘first of its kind’ semi-high speed self-propelled train set has been proposed for inter-city superfast travel.
http://energyinfrapost.com/wow-indi...-india-lhb-coaches-enhance-passengers-safety/