What's new

Indian Army set to place order for 248 more arjun main battle tanks

i believe army is waiting for MK2s user trials.... i think thats willl be the real challenge
 
.
You will take your words back... believe me :tup:

friend seeing army's behavior i doubt that more than 400 arjuns will be inducted. but if 700 or 1000 arjuns will be inducted, do you think i won't be happy?
i love Arjun.
 
.
Here I would like to say something.Now I don't have a inside info about the numbers of Arjuns to be inducted.But the numbers can be estimated.
Actualy IA has ordered 248 mk1s ,not 124.If you remember the additional 124 tanks were ordered right after the comparative trials when mk2 was not finalised and even Dr.VK Saraswat had told that these tanks will not come with missile firing capability.Later IA ordered 124 mk2.
Now coming to numbers.IA still has some 800 T55s and Vijayantas in service and last year A.K.Antony had told in parliament that IA would replace these tanks with Arjuns.So 800 Arjuns are almost sure.
Now coming to FMBT.The induction date of FMBT is set to 2025 and Arjun mk2 will be inducted from 2013 onwards.So there will be a time gap of more tham a decade and in this time more Arjuns have to be produced in order to keep the HVF Avadi facility running,otherways it will have to be shut down.So by current rate of 60 Aruns/year there should be atleast 700 Arjun mk2s by 2025.
What do you say????
 
.
if the MK2 are successful in trials the IA will order more than 248 i hope IA orders at least 1,000 MK2
 
.
What I love in the upcoming Arjun mk2 is its new armor.It will be fitted with a tungsten carbide face hardening plate and impenetrable to even 120 mm DU rounds from close range.
Besides the new FSAPDS T rounds will be much better that the formidable mk1 rounds.
REGARDS....
 
.
What I love in the upcoming Arjun mk2 is its new armor.It will be fitted with a tungsten carbide face hardening plate and impenetrable to even 120 mm DU rounds from close range.
Besides the new FSAPDS T rounds will be much better that the formidable mk1 rounds.
REGARDS....

any official link for your claims
 
.
so total arjun numbers = 124 + 124 + 248 =496, correct???
thats great, another order like this one and we'll have enough to replace all the t 55s
 
.
any official link for your claims

My source is my dad who is working in the PXE Balasose as a mechanical engineer for over 2 and 1/2 decades now,where the kanchan armor and the 120 mm rounds has been tested for long.
Regarding the new rounds,it is from DRDO journal.There was a thread by ganimi kawa where he posted the article.There V.K.Saraswat told that 20 new generation mk2 FSAPDS T rounds developed by ARDE had been sent to PXE for testing.
REGARDS....
 
.
so total arjun numbers = 124 + 124 + 248 =496, correct???
thats great, another order like this one and we'll have enough to replace all the t 55s

There are currently ~800 T55s and Vijayantas in IA.So over these 500 Arjuns(mk1+mk2) there should be another order for 300-400 Arjun mk2 to replace all of them.You can take a look at the post 18 and express your views.
REGARDS....
 
.
My source is my dad who is working in the PXE Balasose as a mechanical engineer for over 2 and 1/2 decades now,where the kanchan armor and the 120 mm rounds has been tested for long.
Regarding the new rounds,it is from DRDO journal.There was a thread by ganimi kawa where he posted the article.There V.K.Saraswat told that 20 new generation mk2 FSAPDS T rounds developed by ARDE had been sent to PXE for testing.
REGARDS....

give me link of that thread. thank you
 
.
give me link of that thread. thank you

SORRY friend,I can't post the link as I am using a mobile device.My parents did not allow me to bring my laptop here in hostel as I am a game addict.But I remember the name of the thread very well.

It was,'Dr.Saraswat annual address to DRDO:some pleasant surprises'.Just type it in google and you will find the thread.Hope this will help.
REGARDS....
 
.
My source is my dad who is working in the PXE Balasose as a mechanical engineer for over 2 and 1/2 decades now,where the kanchan armor and the 120 mm rounds has been tested for long.
Regarding the new rounds,it is from DRDO journal.There was a thread by ganimi kawa where he posted the article.There V.K.Saraswat told that 20 new generation mk2 FSAPDS T rounds developed by ARDE had been sent to PXE for testing.
REGARDS....

Please don't post non-public information in a public forum. Your dad should not have told you.
 
. .
What is the total order now? :cheers:

The total order as of now is for 248 mk1(124 already delivered) and according to some 124 mk2 have also been ordered.So if this 248 mk2s are ordered the total number will be 248 Arjun mk1 and 372 Arjun mk2.The orders for mk2 are not from official sources,so not sure about the credibility.
REGARDS....
 
. .
Back
Top Bottom