What's new

Indian Army Gets Another Go At The Javelin

SpArK

ELITE MEMBER
Joined
May 5, 2010
Messages
22,519
Reaction score
18
Country
India
Location
India
PHOTOS: Indian Army Gets Another Go At The Javelin


jav3.jpg


jav2.jpg


javelin.jpg




DONNELLY TRAINING AREA, Alaska – A soldier from the Indian army fires the Javelin anti-tank missile on November 8 during Yudh Abhyas 2010, an annual bilateral training exercise. A final contract for the Javelin will be signed soon.


http://livefist.blogspot.com/2010/11/photos-indian-army-gets-another-go-at.html
 
.
Specifications
Weight Missile: 11.8 kg (26 lb)[1]

CLU: 6.4 kg (14.1 lb)

Length Missile: 1.1 m (43 in)

Launch tube: 1.2 m (47 in)

Diameter Missile: 127 mm (5.0 in)

Launch tube: 142 mm (5.6 in)

Crew 2

Effective range 75 to 2500 m

Warhead Tandem shaped charge HEAT

Warhead weight 8.4 kg (18.5 lb)[2]

Detonation
mechanism Impact force

Engine Solid fuel rocket
Guidance
system Imaging infrared (IIR)


Army-fgm148.jpg
 
. .
We are getting with full ToT and production will be here.. The requirement runs into thousands...

A single Javelin unit costs about $125,000, and a missile costs about $40,000
 
. . .
then what about nag???

Currently DRDO working for man portable version

"""Missile scientists will also start working on the third generation, `Man Portable' Nag very soon. It would weigh less than 14 kg."""
 
.
been in US , they should also try M134.....

anyway , i like the dress code of US armymen , their dress getting them resembles with the surounding ground color....indian army need to look at these fine aspect as well...
 
.
then what about nag???

It will take 5-7yr more Javelin is gap filler. because currently we using 2nd generation Milan & AT-5. army also have old stock of Milan & AT-4 which is near to end of their life they need urgent replacement army has around 800-1000 AT-4 stock which retire any time that is why they need new ATGM.
 
. .

Latest posts

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom