What's new

India will spend $187 mn to double production of the LCA Tejas

Brother I don't get one point. What is the use of having 270 Tejas by 2030. Is it even enough? That's is after 14 long years. Very sad state of defence plan. Hope second single engine fighter will go for production ...
Exactly due to concerns of shortcomings shown by IAF on Tejas performance they are not going for extra production , instead other fighter jet to be made in India is being explored which will be used to fill IAF numbers hope they select F18 SH and make it at least 120 of these to replace mig 27. Also i dont think IAF will ever go for more than 40 squad strength before 2030.

1. On Jaguars, not all will be upgraded , only 61.

Good luck.

Any authentic links to support your claim , or you are still high on weed.
 
. .
Any authentic links to support your claim , or you are still high on weed.

Mr " NOT SO SMART" go to SIPRI Arms Transfer Database , and put Israel and India as supplier and recipient respectively . And download it.

There you will get it , 61 EL/M 2052 radar for " 61 DARIN 3 Jaguar upgrade ".

And as for being high on weed, let me tell you if without it you can't get your " FACTs" correct then do start taking it. Lol
 
.

Pakistan Affairs Latest Posts

Back
Top Bottom