nalandapride
FULL MEMBER
- Joined
- Nov 10, 2011
- Messages
- 1,581
- Reaction score
- 0
2016 is too late, at that time, j20 is already in service.
J-20 is not coming anyway before 2019 and induction of T-50 will start in 2017.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
2016 is too late, at that time, j20 is already in service.
You are totally misled by the information, j20 will be inducted no later than 2014. At the time we disclosed j10,j20 had begun it's flight test, which means many years past since then. China is progressing at incredible pace than anyone could image, we handle thing in different logic compared to indian.J-20 is not coming anyway before 2019 and induction of T-50 will start in 2017.
what 2016 ???:blink
Sir,
France not developing any fifth Gen.Rafale aircraft or not developing any technology.. for your kind information
You are totally misled by the information, j20 will be inducted no later than 2014. At the time we disclosed j10,j20 had begun it's flight test, which means many years past since then. China is progressing at incredible pace than anyone could image, we handle thing in different logic compared to indian.
20 billion $ for 126 that's more than 158 million $ seems there's something fishy something been arranged between the Indian and the French.
20 billion $ for 126 that's more than 158 million $ seems there's something fishy something been arranged between the Indian and the French.
Nuclear technology... Areva is the key word not Dassault.
You mean they getting nuke technology in that package if so, then the 20 billion sounds fair.Nuclear technology... Areva is the key word not Dassault.
Areva is already India.. in fact in Gujarat