What's new

India Developing, but still a long way to go

.
Delhi.
psb

psb
psb

psb
psb

psb
 
. .
Kochi
The station of Kochi Metro Rail at Kaloor is getting ready soon. The works have been progressing in a systematic manner as expected and this new form of development is surely going to serve the needs of all the people in the area.


13227179_1139257982762381_7537084221372054193_n.jpg

13217011_1139257996095713_4559338104897963823_o.jpg

13227368_1139257752762404_750875364007643249_o.jpg

13173545_1139258486095664_5631699917841624038_o.jpg

13220505_1139258709428975_2090133528497840631_o.jpg

13217009_1139258549428991_2207621916126513212_o.jpg

12440778_1139258959428950_3209820767064528883_o.jpg

Source: Facebook Page https://www.facebook.com/KochiMetroRail/

Kolkata
This NG-Airport Metro, I think a station construction is happening here

12798960_1143277079024520_723003638580217666_n.jpg


cc: Sandip Ahirrao
 
.

CgxYhb5UgAAr-YJ.jpg


Train set coaches arriving at Izzatnagar for initial phase of trials at upto 150 kph
13062068_1026791584055751_5090504454588929282_n.jpg
13238973_1026791580722418_8157986902001775776_n.jpg
13239889_1026791647389078_4170981246044186799_n.jpg
13266102_1026791607389082_908599228283813241_n.jpg


200 kph trials are slated for next month (June 2016)

"It is a nine-coach set. One coach will have oscillograph and another speed trial equipment, and the train will be pulled by a WDP4 or WAP 5 locomotive capable of pulling at speeds of 180kmph. The trials will test the stability of the train, its top speed in Indian track conditions and the emergency braking distance. It could herald a new era if the trials are successful,"
http://www.dnaindia.com/mumbai/report-spanish-train-talgo-leaves-mumbai-for-up-2210826

Working


@Ankit Kumar 002 @Rain Man @Abingdonboy @Spectre @Roybot @ayesha.a @Ryuzaki
 
Last edited:
.

For optimum performance we should have had stuck with full Talgo system, means its locomotive too. Also I am not sure how good EMDs will be. However WAP5 is all good.

But I was going through an IRFCA thread , there a person explained that the coaches of Talgo, will not be able to accommodate Side berths , thus requiring additional coaches , but then the problem will be with WAP5, an extra will be needed ...
 
.
For optimum performance we should have had stuck with full Talgo system, means its locomotive too. Also I am not sure how good EMDs will be. However WAP5 is all good.
Ankit, owing to some changes required in signalling, coaches are being tested behind an established loco as of now. IR wishes to see stability & oscillation tests in first part of trials. Later if IR choose yo run these trains commercially, these will be with original configuration power cars.
 
.

Awesome!!! Suresh Prabhu is probably the best rail minister we got till date. :)

Ankit, owing to some changes required in signalling, coaches are being tested behind an established loco as of now. IR wishes to see stability & oscillation tests in first part of trials. Later if IR choose yo run these trains commercially, these will be with original configuration power cars.

A low cost and faster way of upgrading our ail service to semi-HSR standard.
 
.
Ankit, owing to some changes required in signalling, coaches are being tested behind an established loco as of now. IR wishes to see stability & oscillation tests in first part of trials. Later if IR choose yo run these trains commercially, these will be with original configuration power cars.

That cures my anxiety .

And one more question , there was a news that IR is planning an exclusive 20 km railway track only for such kinds of trials , any movement on that ?
 
. .
Where it all begins (Diesel Locomotive works).
This is the birthplace of new generation 4500 and 5500 HP Diesel electric locomotives for Indian Railways.
(notice WDG 5 at 1:13)
DLW manufacturers close to 300 locomotives an year, which after rigorous testing are sent to different zones for commissioning and regular service.


Presently DLW manufactures 4500 HP WDP 4D (Passenger loco) and WDG 4D (Freight locomotive) and 5500 HP WDG 5 (Freight locomotive)
sameer7678-1375777214483.jpg
16078489985_22a6c38aaa_b.jpg
12153578143_1a6c5f2f82_b.jpg


@Abingdonboy @AndrewJin @Ankit Kumar 002 @Spectre @TaiShang @Levina
 
. .
These Talgo coaches should be made in India, instead of importing. Guess, it will be done, once they are tested and certified for Indian conditions.
 
. .
These Talgo coaches should be made in India, instead of importing.
Talgo has provided these coaches free of cost and borne the testing cost for these trials. If successful, India has proposed to manufacture these trainsets (RENFE TALGO 250) in India and eventually these will be used on Class A routes to provide upto 225 kph fast service where HST service is not possible.
 
.
Back
Top Bottom