i hear that GIFT is progressing, well with some hiccups but nonetheless. also developments in Noida-Gr. Noida. i bet someone can put up pictures.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
It seems to be a smaller airport compared to other metros.
Isn't this a Domestic TerminalIt seems to be a smaller airport compared to other metros.
The five-level domestic terminal spans 72,614 sq m. It has seven gates, 52 check-in counters and eight e-ticketing counters. Terminal-2 is equipped to handle 3,300 passengers an hour. The existing terminal handles 2,200 passengers.
Samundra Institute of Maritime Studies , Lonavla
Mumbai, May 11: Suzlon Group said the installed wind capacity at Jaisalmer Wind Park in Rajasthan had crossed 1,000 MW.
The park comprises a cluster of wind farm sites within the Jaisalmer district, including Amarsagar, Badabaug, Baramsar, Tejuva and Soda Mada. It houses projects of some of Suzlons key customers such as Mytrah Energy, Hindustan Zinc, Hindustan Petroleum Corporation, Rajasthan State Mines & Minerals and Rajasthan Renewable Energy Corporation, the company said.
Suzlon said the first turbine was commissioned at Tejuva in Baramsar in July 2011. On April 1, 2012, the installed capacity reached 1,064 MW.
Suzlon is proud to be playing such a vital role in powering the state of Rajasthan. Completing one GW of installed capacity is a great achievement for us and for wind energy in India, said Mr Tulsi Tanti, Chairman, Suzlon Group.
South Asia's first supertall, 338m, almost topped out