What's new

India Developing, but still a long way to go

Trivandrum city,

fb_img_1621920839457-jpg.1566737


picsart_05-24-08-19-58-jpg.1566740


whatsaroundthiruvananthapuram-1620996367915-jpg.1566757


picsart_04-30-08-54-30-jpg.1567141


img_20210424_144015_834-jpg.1567142


fb_img_1619966344771-jpg.1567143


picsart_05-16-08-07-07-jpg.1567145


picsart_03-18-12-51-42-jpg.1567146




whatsaroundthiruvananthapuram-1622399376905-jpg.1584228


picsart_05-30-08-25-57-jpg.1584230


YkJfBEU.jpg


wqk7I7X.jpg

picsart_04-30-08-54-30-jpg.1567141


Xrn7QyV.jpg


bER1QIb.jpg

Thrissur,

img_20201118_175933-jpg.1630903


156005403_262626672139665_1561798520124627275_n-1-jpg.1629904


178410372_4667436856605874_8845625167012259407_n-jpg.1456329
 
Last edited:
. . . .
. .
Minister of State for Railways & Textiles, Darshana Jardosh shared a video clip of the railway station at night.

With an aim of giving priority to passenger satisfaction, Gandhinagar Capital station has been developed jeweled with amenities at par with modern airports for a pleasurable experience. There is segregated Entry and Exit surrounded by landscaped area. Parking facilities have been provided for more than 300 vehicles. There is an inter-faith prayer hall, art gallery with LED wall display lounge, baby feeding room, centralized AC waiting hall, Double height entrance lobby with spacious ticketing facility etc. Special Care has been taken to make it a Divyang friendly station by providing it with a special ticket booking counter, ramps, lifts, dedicated parking space etc.

 
.
"Third Successful Vikas Engine Long Duration Hot Test for Gaganyaan Program

On July 14, 2021, ISRO has successfully conducted the third long duration hot test of the liquid propellant Vikas Engine for the core L110 liquid stage of the human rated GSLV MkIII vehicle, as part of the engine qualification requirements for the Gaganyaan Programme.
The engine was fired for a duration of 240 seconds at the engine test facility of ISRO Propulsion Complex (IPRC), Mahendragiri in Tamil Nadu. The performance of the engine met the test objectives and the engine parameters were closely matching with the predictions during the entire duration of the test."

Necessary Steps to launching a rocket or plane ...
 
. . . . .
Mahindra XUV700 makes global debut

1628943294003.png


Power for the new XUV700 comes from either a petrol or diesel powertrain. The 2.0-litre, four-cylinder, turbo-petrol Mahindra mStallion unit is tuned to produce 200hp and 380Nm. On the other hand, the diesel is a 2.2-litre, four-cylinder mHawk turbocharged unit that will come in two states of tune. The lower state unit (reserved for the entry level version) will produce 155hp and 360Nm, while the unit in higher variants will churns out 185hp and 420Nm (450Nm with the automatic gearbox). The diesel engine also comes with four drive modes – Zip, Zap, Zoom and Custom – that are claimed to alter performance and steering response.
 
. . .
Back
Top Bottom