ORR (Outer Ring Road), Hydrabad (Named as “Hyderabad Growth Corridor Limited”
•162 Km of 8 lanes Express Way
•To be completed in 2 phase. Phase – I to be of 22km length at a cost of Rs. 500 Crore. Phase – II will be of length 140 Km at a cost of Rs. 2500 Crore.
•Phase – I is complete. Phase – II is expected to be complete by 2010
The importance of the proposed corridor being
•Relieves congestion on metropolitan area and inner ring road and meets the future demand.
•Provides orbital linkage to radial arterial roads
•Creates options for development of the further satellite townships
•Provides linkage to the proposed MRTS and Bus system
•Provides quick access to the International Airport from Strategic parts of the city
•Connects various new urban nodes outside the city like Hi- Tech city , Games village, IIIT, ISB, Hardware Park, Singapore Township Financial district etc.,