What's new

IAF hikes combat jet purchase figure to 200

Contrarian

ELITE MEMBER
Joined
Oct 23, 2006
Messages
11,571
Reaction score
4
IAF hikes combat jet purchase figure to 200


New Delhi: The Indian Air Force (IAF) could purchase upwards of 200 aircraft to ramp up its ageing and depleting fleet of fighters, adding around 80 more to the figure of 126 it had planned earlier.

"The number could go up by 70-80 if necessary," Minister of State for Defence M.M. Pallam Raju told reporters on the sidelines of a seminar here.

Hitherto, a figure of 126 multi-role combat aircraft (MRCA) had been mentioned for the IAF order but this number was widely expected to rise due to the prolonged delay in acquiring the new planes.

To add to the IAF's woes, there have been huge time and cost overruns in developing the indigenous Tejas light combat aircraft (LCA), prototypes of which have been flying since 2000 but which is expected to be inducted into service only by 2012.

The cost of 126 aircraft had been estimated at $10 billion, making it India's biggest ever defence deal. The additional aircraft would cost $6 billion, raising the size of the deal to $16 billion.

Asked when the global tender for the MRCAs would be issued, Raju cryptically replied, "Soon".

India's Defence Acquisition Council (DAC) had cleared the tender June 29, and this was expected to have gone out within a month to the manufacturers of the six aircraft that are in the fray. Officials are tight-lipped on the reasons for the delay but indicate this could be because of some top-level changes in the defence ministry.

Vijay Singh is the new defence secretary in place of Shekhar Dutt, who has retired. N.K. Narang has come in as secretary (Defence Accounts) replacing V.K. Mishra, who has retired. No replacement has been named for Sheelbhadra Banerjee, the director general (Acquisitions) who has moved to another assignment.

All three officials are members of the DAC and would need time to study the voluminous IAF tender to understand its complexities.

While the DAC has cleared a tender for 126 aircraft, the additional jets are likely to be purchased as a "follow-on" order as the IAF has done in the case of 80 Mi-17 medium lift helicopters it is purchasing from Russia.

The IAF desperately needs new aircraft to replace its ageing fleet of Soviet-era MiG-21 fighters that make up 21 squadrons of its 30-squadron fleet of combat aircraft. The IAF has a sanctioned strength of 45 fighter squadrons but the highest it has ever been able to achieve is 39-and-a-half squadrons.

The tender, or Request For Proposal (RFP) would now be sent out to the manufacturers of six aircraft: the US F-16 and F-18 Super Hornet, the Swedish Gripen, the French Rafale, the Russian MiG-35 and the European consortium's Eurofighter.

Once the RFP is issued, the manufacturers will have six months to respond, following which a professional team would conduct a technical evaluation of the proposals received to check for compliance with the IAF's operational requirements and other RFP conditions.

Extensive field trials would then be carried out to evaluate the performance of the different aircraft. Finally, the commercial proposal of the vendors short-listed after technical and field evaluations would be examined and compared.

The defence ministry's Contract Negotiation Committee (CNC) would then hold discussions with the vendors before identifying the manufacturer who would be awarded the IAF order.

The CNC would submit its report to the defence minister, who would forward it to the finance minister. After the file returns to the defence ministry, it would go for final approval to the cabinet committee on security (CCS). This process would take some two-and-a-half years.

After the contract is signed with the chosen manufacturer, it would take another two-and-a-half year before the first aircraft start arriving.

http://economictimes.indiatimes.com...urchase_figure_to_200/articleshow/2307791.cms
 
.
Sill waiting for the first 126 to be ordered or be dcided ?:azn:
 
.
cheetah, We know this from literally ages, news are being recycled, There will be 'provision' of buying 200 aircrafts but 126 will be bought, the extra numbers incase needed is being kept in the document early so as to avoid pricing issues (see 40 extra MKI deal issue) which might arise later due to the same. This MRCA saga is literally worthless thing to wait for.
 
.
I think the follow-on to the 126 is quite logical. Usually the option to purchase more is always included in the contract to deal with attrition and raising of additional sqns eventually.
 
. .
Doing this also makes the contendors to offer more and decrease the price, which IAF is really desperate for!

Rafale's off-the-shelf price is around $90 million per plane. but MMRCA includes full ToT with source codes so we'll
build the jet here in India. that would also further reduce the price as we'll limit imports to just specfic tech, 100% of
all raw materials, airframe, engines (license-built M88-2) and some more will be manufactured locally.

So the indian-built rafales would cost just around $70-75 million per plane, further reductions could be seen in future
which means the number of planes to be built might increase to 250 or more according to future requirements.
 
. .
Sill waiting for the first 126 to be ordered or be dcided ?:azn:

Exactly you can jump the figure from 200 to 2000 but unless we dont see eve a few of those jets on the ground no one is going to be impressed.
 
. .
I think He is starting to follow from the very first.

gessler: no offence taken
 
.
I think He is starting to follow from the very first.

gessler: no offence taken

Gessler: no offence taken...really!:agree:

i like following things from first, ya got a problem with that?? :smokin:
 
.
Rafale's off-the-shelf price is around $90 million per plane. but MMRCA includes full ToT with source codes so we'll
build the jet here in India. that would also further reduce the price as we'll limit imports to just specfic tech, 100% of
all raw materials, airframe, engines (license-built M88-2) and some more will be manufactured locally.

So the indian-built rafales would cost just around $70-75 million per plane, further reductions could be seen in future
which means the number of planes to be built might increase to 250 or more according to future requirements.

apart from cost reduction ,Direct and indirect jobs that get created for hundreds if not for thousands here in India
 
.
As per above comment by Minister of State for Defence M.M. Pallam Raju I think First Rafale may be induct in IAF not before 2017
 
.
New accounts which are bumping old thread have wreaked havoc in indian-def section :(
 
.
As per above comment by Minister of State for Defence M.M. Pallam Raju I think First Rafale may be induct in IAF not before 2017

I don't think that's true. The first 18 Rafales will arrive directly from France within 36 months since signing of contract.
According to reliable sources, contract could be signed this month itself (March), so we'll get first squadron
of rafales within 2015, however the first Indian-built rafales will come only by 2016 or so. :enjoy:
 
.

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom