The orders are-
1. 50 SU-30MK and MKIs ordered directly from Russia in 1996..
2. Another 40 SU-30MKIs, ordered direct in 2007.
3. A license-build deal with India’s HAL -140 more SU-30MKI Phase 3 planes (MoU 2000)..
4.A final deal of 42 HAL-built in December 2012.
ie. TOTAL=50+40+140+42= 272.. (4 crashed)
Completion...
1. 50 SU 30 (8MK+10K+32MKI)... all upgraded to MKI's...
2. I think deal (2007) is the confusion....
This deal is neither an off the shelf buy nor an indegenous production... It's an assemby for speeding up the induction .... Proof for this is after the Dec 2012 HAL Chairman R. K. Tyagi
"HAL's total responsibility for this supersonic multirole aircraft has now gone up to 222," said HAL Chairman R. K. Tyagi. "
Hindustan Aeronautics Ltd. building Su-30 MKI fighters - UPI.com
More proof in 2009 before DEC 2012 deal of 42...
In addition to licensed manufacture of 140 SU-30 aircraft by M/s Hindustan Aeronautics Limited (HAL), a contact for procurement of additional 40 SU-30 MKI was signed with M/s HAL in 2007. Out of these three aircraft have been delivered to the Indian Air Force and delivery of the remaining aircraft is expected to be completed by 2011-12.
The manufacturing of the aircraft will be under Transfer of Technology agreement between M/s HAL and M/s Resoboronexport, Russia. M/s HAL would be procuring the technical kits from Russia and assembling the aircraft.
This information was given by Defence Minister Shri AK Antony in a written reply (2009) to Shri L Raja Gopal in Lok Sabha.....
Also in 2011 before Dec 2012 deal of additional 42MKI....
Subsequent to CCS Sanctions, contracts were concluded with IAF for supply of 140 8U-30 MIG aircraft by 2014-15. Further contract for supply of additional 40 SU-30 MKI aircraft was concluded with IAF for completion within 2014-15, along with earlier order of 140 aircraft. Out of the total 180 aircraft, 99 aircraft have been delivered till 2010-11.This information was given by Minister of State for Defence Shri MM PallamRaju in written reply to Shri Nand Kumar Sai in Rajya Sabha.
3.Licence build deal- Not know the exact number... but HAL production=total 134( out of 222)... The HAL production increases to 28/ annum (may be because of indeginous+ assembly production) ..
4. Latest deal final deal signed in 2012.. HAL will produce or assembled...
India, Russia seal new defence deals - Livemint
So total SU 30s in IAF=50+134=184...
NB:Also as Eighth squandron raised in DEC2012.. That is 18*8=144 in DEC2012.. Total produced will be close to above in 2014.
So your estimate is 184 total with IAF.
What is the timeline for the remaining 88 jets?
What about the 42 Super SU 30's that was to be signed by Putin in 2012? was it signed and if done then what's the delivery schedule?.