What's new

Hydropower project Updates

Rehabilitation and Upgradation Trimmu Barrage on River Chenab in the Jhang Punjab
UpStream Flared Out Wall of Trimmu Barrage Work In Progress



23316807_1131763200293374_6409861288650808253_n.jpg


22730556_1123711927765168_3262150080257063603_n.jpg


22789040_1123711807765180_22112974833687515_n.jpg


16427507_1260808717308090_3607634997910673752_n.jpg


21105656_1086809981455363_6511820373755314415_n.jpg




23754817_428871210879590_2412106712802328612_n.jpg




22549919_413817679051610_261056610557606967_n.jpg




22552512_413817582384953_6577018792271095717_n.jpg
 
.
Neelum–Jhelum Hydropower Plant ... 969 MW

Subsequent (stage 2) reservoir filling from El. 990~1002. 1st Tunnel filling to follow soon InshaAllah.


27972435_1419471288180565_7488829065348798341_n.jpg




28059107_1419471391513888_773391184647096574_n.jpg
 
.
Hydel project’s feasibility conducted

SKARDU: The Water and Power Development Authority (Wapda) has completed the feasibility report of the 34.5-megawatt Harpo-Skardu Hydropower Project. Iltaf Qadir, the project director, updated reporters on the progress achieved. The project will be completed at an estimated cost of over Rs 9.5 billion in three years, he said, adding that the German Department KFOW and AFD of France will donate 80% while 20% would be sourced from the Public Sector Development Programme. “The project will help in overcoming energy shortage in Baltistan division,” he said. Qadir said the mega project will also help in promoting infant industrial units.
 
.
409 MW Torcamp Godubar Hydropower Project of KPK


National Engineering Services Pakistan (NESPAK) private limited attained another milestone in the hydropower sector by winning a project titled "409 MW Torcamp Godubar Hydropower Project" through competitive bidding. Pakhtunkhwa Energy Development Organization (PEDO) entrusted the Project to a joint venture of NESPAK (Lead Firm), FICHTNER GmbH & Co. KG, Germany (Foreign JV partner) in association with TRS (Pvt.) Limited, Lahore. Dr Tahir M. Hayat, Managing Director NESPAK along with Zafar Aman (Project Manager), Chief Engineer, GT&GE Division represented NESPAK at the contract signing ceremony held at PEDO House in Peshawar.

According to the spokesperson of the NESPAK the Project is located in Chitral District of Khyber Pakhtunkhwa. The scope of work includes feasibility study, detailed engineering design, preparation of tender documents and PC-I. The duration of the project is 24 months.

It is also an honor for NESPAK that the Company has been rendering engineering consultancy services for various projects of national importance like Orange Line Metro Train Project in Lahore, Neelum Jhelum Hydroelectric Power Project and RLNG-based Combined Cycle Power Projects in Punjab.

On the overseas front, NESPAK has won the Raising Wala Dam Project in Jordan, Rural Access and Mobility Project II in Nigeria and High Voltage Projects in Saudi Arabia.
 
.
Tarbela 4th extension project starts power production

LAHORE: The Water and Power Development Authority (Wapda) achieved another landmark for energy security as the Tarbela 4th extension project started electricity generation on Monday.

The first generating unit has started providing electricity to the national grid. Wapda Chairman Muzammil Hussain visited the site to mark the development.

Highlighting significance of the project in economic and social development of the country, Hussain announced that the prime minister would formally inaugurate the Tarbela 4th extension project in the second week of March.
 
.
969 MW Neelum Jhelum Hydropower Project under construction in Azad Kashmir .

Neelum Jhelum Hydropower Project in AJK, has been 98% completed.
The first unit of the project is scheduled to go into operation by the end of March 2018 followed by the second unit in mid-April and third and fourth units in May 2018.
On its completion, the project will contribute about five billion units of electricity to the national grid annually. Annual revenue of the project is estimated to be Rs 50 billion.


28280121_1431059947021699_8613678986822542733_n.jpg


28468402_1431060000355027_2561702129308383651_n.jpg




28577100_1431060027021691_6034869769728304043_n.jpg




28576354_1431060060355021_8580611293803371985_n.jpg




28378038_1431060270355000_6879677388801495747_n.jpg
 
.
Neelum Jhelum Hydroelectric Power Company – a subsidiary of WAPDA Chairman Lt Gen Muzammil Hussain (Retd) was the chief guest of the ceremony attended by the project authorities and representative of the consultants and the contractors.


28379500_1431959690265058_5562495890401027716_n.jpg



28467647_1431959926931701_6785837419466455780_n.jpg


28576201_1431959806931713_7712040060198003861_n.jpg
 
. .
Tarbela Dam 1973

26731115_1592418997505214_6352556152870573008_n.jpg


President Ayub Khan addressing a ceremony held to mark the inauguration of the Mangla Dam project along the banks of the Jhelum River in 1967.


21369209_1481691551911293_1324373912253652010_n.jpg
 
.
Tarbela Dam 1973

26731115_1592418997505214_6352556152870573008_n.jpg


President Ayub Khan addressing a ceremony held to mark the inauguration of the Mangla Dam project along the banks of the Jhelum River in 1967.


21369209_1481691551911293_1324373912253652010_n.jpg
such a shame a country with 60,000+ potential hasnt build a single project since 1970s(last 50 years). we were far poor than..poorer countries today float bonds and easily build them..look at Ethiopia expensive dam on nile for example just by bonds even though they dont have that much demand!! but poor policies lack of any interest from govts of PML N and PPPP in last 3 decades have resulted this
 
.
such a shame a country with 60,000+ potential hasnt build a single project since 1970s(last 50 years). we were far poor than..poorer countries today float bonds and easily build them..look at Ethiopia expensive dam on nile for example just by bonds even though they dont have that much demand!! but poor policies lack of any interest from govts of PML N and PPPP in last 3 decades have resulted this
We tried kalabagh but everybody knows how that went down...
 
.
Nespak wins 409 MW Torcamp Godubar hydropower project

LAHORE - The NESPAK has attained another milestone in the hydropower sector by winning a project titled “409 MW Torcamp Godubar Hydropower Project” through competitive bidding.

Pakhtunkhwa Energy Development Organization (PEDO) entrusted the project to a joint venture of NESPAK (lead firm), FICHTNER GmbH & Co. KG, Germany (foreign JV partner) in association with TRS (Pvt.) Limited, Lahore. Dr Tahir M Hayat, Managing Director NESPAK , along with Zafar Aman (project manager), chief engineer, GT&GE Division represented NESPAK at the contract signing ceremony held at PEDO House in Peshawar.

The project is located in Chitral district of Khyber Pakhtunkhwa. The scope of work includes feasibility study, detailed engineering design, preparation of tender documents and PC-I. The duration of the project is 24 months.
 
.
We tried kalabagh but everybody knows how that went down...
its just an excuse..(kalabagh is like a fictional women which is used as an excuse for a gay person not to marry another women)
in 1983-1988..a study was done which identifed 13 sites..with a total of 30 MAF..2 have been finalized akhori and bhasha and akhori is easier to build than kalabagh

AAEAAQAAAAAAAAJRAAAAJGVjZDIxZjkzLTU1MWQtNGNhOS04NzliLTNmMTE3NmI2NDUwYg.jpg


all of the above were part of WAPADA study for low cost quick dams..this list doesnt include projects in GB and upper nothern areas
 
.
there more than half a dozen sites in nothern areas

For storage, the WAPDA has identified water reservoir sites of about 65 MAF capacities, and other locations with a power potential of 35,000 MW
 
. .

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom