ghazi52
PDF THINK TANK: ANALYST
- Joined
- Mar 21, 2007
- Messages
- 102,780
- Reaction score
- 106
- Country
- Location
,.,.,.
Jagran-II Hydropower Project (JHPP-II)
Under Construction civil works including weir, 5 km long tunnels, Surge Tank, Vertical Shafts and a Power house. The project is expected to be completed by 2022..
,.,.
Jagran-II Hydropower Project (JHPP-II)
Under Construction civil works including weir, 5 km long tunnels, Surge Tank, Vertical Shafts and a Power house. The project is expected to be completed by 2022..
,.,.