The first tunnel to be constructed at Dasu Dam Naya KKH has been completed. This tunnel is built at Shawl village, one kilometer ahead of Dasu city towards Gilgit. More such tunnels will be built on this road from this tunnel to Dasu Dam. Including the beauty of Kohistan will increase further.
InshaAllah Dasu Dam will be completed soon and the fate of Upper Kohistan will change.
Dasu Dam will prove very useful for Pakistan.



1598281529143.png
 

Hydel Generation on the Rise:



WAPDA hydel generation surpasses 8500 MW for first time 8757 MW delivered to National Grid during peak hours......


August 27, 2020 :........... Electricity generation of hydel power stations owned and operated by Pakistan Water and Power Development Authority (WAPDA) surpassed 8500 megawatt (MW) mark for the first time in Pakistan, as WAPDA provided 8757 MW of electricity to the National Grid during peak hours the other day.

Previously, the record of hydel power generation was 8474 MW delivered to the system on September 11, last year.

This record generation of hydel electricity by WAPDA is the result of higher reservoir level at Tarbela and Mangla dams, increased water outflows as per indent by Indus River System Authority (IRSA) and effective operation of WAPDA hydel power stations.

The statistics of the record hydel generation during the peak hours show that Tarbela Hydel Power Station generated 3331 MW, Tarbela 4th Extension 1410 MW, Ghazi Barotha 1450 MW¬, Mangla Hydel Power Station 915 MW and Neelum Jhelum 870 MW while other hydel power stations cumulatively shared 781 MW to the National Grid.

The installed capacity of WAPDA hydel power stations has risen to 9389 MW with phased completion of its three mega hydropower projects namely the 969 MW-Neelum Jhelum, the 1410 MW-Tarbela 4th Extension, and the 108 MW-Golen Gol.

At present, WAPDA owns and operates 22 hydel power stations, including Neelum Jhelum. WAPDA is well on its way and work on three mega projects including Diamer Basha Dam, Dasu Hydropower Project and Mohmand Dam is under way, adding 9500 MW on their commissioning.



1598537292261.png
 
Mohmand Dam Project - After recent flood in Swat River.
The Diversion Tunnel outlets are flooded. Last night, the construction area was evacuated after heavy rain and sudden rise in river swat.

1599164400023.png
 
Under Construction #Karot Hydropower Project
- 720MW on #Jhelum river under #CPEC
- Asphalt Core Rock fill dam
- Surface Powerhouse equipped with 4 x 180 MW Francis-type units
- Expected completion date: 2021-22

#Hydropower #Dam #Pakistan #China 🇵🇰🇨🇳

FB_IMG_1599472318567.jpg
FB_IMG_1599472308511.jpg
FB_IMG_1599472312454.jpg
FB_IMG_1599472300105.jpg
FB_IMG_1599472304741.jpg
FB_IMG_1599472291602.jpg
FB_IMG_1599472295823.jpg
FB_IMG_1599472283248.jpg
FB_IMG_1599472287670.jpg
FB_IMG_1599472323212.jpg
 
Under Construction #Karot Hydropower Project
- 720MW on #Jhelum river under #CPEC
- Asphalt Core Rock fill dam
- Surface Powerhouse equipped with 4 x 180 MW Francis-type units
- Expected completion date: 2021-22

#Hydropower #Dam #Pakistan #China 🇵🇰🇨🇳

FB_IMG_1599480210833.jpg
FB_IMG_1599480217020.jpg
FB_IMG_1599480222058.jpg
 
Under Construction #KarotHydropowerProject
- 720MW on #Jhelum river under #CPEC
- Asphalt Core Rock fill dam
- Surface Powerhouse equipped with 4 x 180 MW Francis-type units
- Expected completion date: 2021-22
Civil works 90% completed


#Hydropower #Dam #Pakistan #China 🇵🇰🇨🇳

20200908_155138.jpg
20200908_155142.jpg
20200908_155145.jpg
20200908_155147.jpg
20200908_155107.jpg
20200908_155105.jpg
 

Pakistan Defence Latest Posts

Back
Top Bottom