What's new

HAL Tejas - A Tragedy

Faqir M. Abdullah

FULL MEMBER

New Recruit

Joined
Jul 24, 2014
Messages
35
Reaction score
1
Country
Pakistan
Location
Pakistan
hal_tejas_l3.jpg
Despite enormous political pressure in India to get the locally made LCA (Light Combat Aircraft or "Tejas") jet fighter into production, the government has quietly delayed that for at least two more years. Production was supposed to begin at the end of 2012, but the number of technical problems with the LCA was too great to clear up in time for production to start then. Many essential electronic items are not functioning properly or reliably. The prototypes that are flying are maintenance nightmares, and after each test flight it takes several days to get the aircraft in shape to fly again. The managers of this government financed project tried to keep the problems quiet while they were quickly and quietly fixed but failed at both these tasks.

This was not the first major failure for the LCA. Earlier this year India admitted defeat and dropped plans to use the locally developed Kaveri engine in the LCA. After 24 years and over $600 million the Kaveri was unable to achieve the necessary performance or reliability goals required. The government plans to see if the Kaveri can be used in a combat UAV that is being developed locally but that aircraft is not expected to fly for another five years or more.

The LCA developers saw this coming and several years ago ordered 99 American F414 jet engines for $8.1 million each. These were to be used for the first LCAs being mass produced. At that point it was still believed that eventually most of the LCAs were to be powered by the Kaveri engine, which has been in development hell for over two decades. The F414s were to substitute only until the Kaveri was ready.

The failure of the Kaveri project is just one of many examples of how the Indian defense procurement bureaucracy misfires. Efforts to fix the mess even led to calling in foreign experts (from the U.S., Israel, and other Western nations). For example, three years ago India made arrangements with French engine manufacturer Snecma to provide technical assistance for the Kaveri design and manufacturing problems. Critics in the Indian air force asserted that help from Snecma would not save the ill-fated Kaveri program. But the government apparently believed that it was necessary for India to acquire the ability to design and build world class jet engines, whatever the cost. Only a few nations can do this and India wants to be one of them, soon, no matter what obstacles are encountered. Despite decades of effort, the Kaveri never quite made it to mass production. Now the government will continue funding development of jet engine design and manufacturing capability, but with some unspecified changes.

There is much to be learned from the Kaveri debacle. When work began on the Kaveri, in the mid-1980s, it was believed that the LCA would be ready for flight testing by 1990. A long list of technical delays put off that first flight until 2001. Corners had to be cut to make this happen, for the LCA was originally designed to use the Indian built Kaveri engine and the engine was never ready.

For all this, India only plans to buy 200-300 LCAs, mainly to replace its aging MiG-21s, plus more if the navy finds the LCA works on carriers. Export prospects are dim, given all the competition out there (especially for cheap, second-hand F-16s). The delays have led the air force to look around for a hundred or so new aircraft (or even used F-16s) to fill the gap between elderly MiG-21s falling apart and the arrival of the new LCAs. However, two decades down the road the replacement for the LCA will probably be a more competitive and timely aircraft.
(The Kaveri Engine)
Engine_GTX-35VS_Kaveri-300x219.jpg
 
Last edited:
Yeah! The sailing hasn't been smooth. I just hope this proves to be quite a learning experience for HAL, ADA, DRDO and everyone else involved for upcoming projects
 
Yeah! The sailing hasn't been smooth. I just hope this proves to be quite a learning experience for HAL, ADA, DRDO and everyone else involved for upcoming projects
You are right, I agree, being capable of producing a 4th Gen Fighter aircraft all by your own is not an easy task, hope they learn from all these years.
 
It is a good learning curve for India and in the process it developed many state of the art R&D and production facilities and skilled man power. It will be very beneficial for future projects. Tejas is quite delayed but it will sure inducted in few years and since it is meant to replace Mig-21s, its no brainer that it will bring new firepower to IAF.
 
It is a good learning curve for India and in the process it developed many state of the art R&D and production facilities and skilled man power. It will be very beneficial for future projects. Tejas is quite delayed but it will sure inducted in few years and since it is meant to replace Mig-21s, its no brainer that it will bring new firepower to IAF.
what about used f16s,,,,,that part true?
 
It is a good learning curve for India and in the process it developed many state of the art R&D and production facilities and skilled man power. It will be very beneficial for future projects. Tejas is quite delayed but it will sure inducted in few years and since it is meant to replace Mig-21s, its no brainer that it will bring new firepower to IAF.
Hmm , and even If the Tejas fails by all means and the Air force just refuses it's production , yet It doesn't mean that LCA programm is doomed because till then they will have enough experience to start on a newer and even better LCA project that would actually be ready and in IAF soon , who knows?
 
It is not for IAF. It was for exports of Tejas which will have competition from used F-16s.
The delays have led the air force to look around for a hundred or so new aircraft (or even used F-16s) to fill the gap between elderly MiG-21s falling apart and the arrival of the new LCAs
----
my query was regarding this part of the article..
@Abingdonboy @sancho
 
Hmm , and even If the Tejas fails by all means and the Air force just refuses it's production , yet It doesn't mean that LCA programm is doomed because till then they will have enough experience to start on a newer and even better LCA project that would actually be ready and in IAF soon , who knows?

It is too late for Tejas to be failed. They are already flying in numbers and doing various weapons and other tests. Only thing now we are waiting for is FoC and induction with IAF so that they rough up these babies and give feedback to NAL/DRDO for fine tuning and begin replacing Mig-21s.

The delays have led the air force to look around for a hundred or so new aircraft (or even used F-16s) to fill the gap between elderly MiG-21s falling apart and the arrival of the new LCAs
----
my query was regarding this part of the article..

I don't think India ever wanted to buy old F-16s they even rejected spanking new F-16 blk 60s.
 
I do think so IAF/IN in total would ever go for more than 8 squadrons/160...250 figure is far fetched but I believe from 126 Rafales it could go up to 160 eventually.
 
It is too late for Tejas to be failed. They are already flying in numbers and doing various weapons and other tests. Only thing now we are waiting for is FoC and induction with IAF so that they rough up these babies and give feedback to NAL/DRDO for fine tuning and begin replacing Mig-21s.



I don't think India ever wanted to buy old F-16s they even rejected spanking new F-16 blk 60s.
Correct, I was supposing.
 
mpetitive and timely aircraft.
(The Kaveri Engine)
View attachment 40402 Despite enormous political pressure in India to get the locally made LCA (Light Combat Aircraft or "Tejas") jet fighter into production, the government has quietly delayed that for at least two more years. Production was supposed to begin at the end of 2012, but the number of technical problems with the LCA was too great to clear up in time for production to start then. Many essential electronic items are not functioning properly or reliably. The prototypes that are flying are maintenance nightmares, and after each test flight it takes several days to get the aircraft in shape to fly again. The managers of this government financed project tried to keep the problems quiet while they were quickly and quietly fixed but failed at both these tasks.

This was not the first major failure for the LCA. Earlier this year India admitted defeat and dropped plans to use the locally developed Kaveri engine in the LCA. After 24 years and over $600 million the Kaveri was unable to achieve the necessary performance or reliability goals required. The government plans to see if the Kaveri can be used in a combat UAV that is being developed locally but that aircraft is not expected to fly for another five years or more.

The LCA developers saw this coming and several years ago ordered 99 American F414 jet engines for $8.1 million each. These were to be used for the first LCAs being mass produced. At that point it was still believed that eventually most of the LCAs were to be powered by the Kaveri engine, which has been in development hell for over two decades. The F414s were to substitute only until the Kaveri was ready.

The failure of the Kaveri project is just one of many examples of how the Indian defense procurement bureaucracy misfires. Efforts to fix the mess even led to calling in foreign experts (from the U.S., Israel, and other Western nations). For example, three years ago India made arrangements with French engine manufacturer Snecma to provide technical assistance for the Kaveri design and manufacturing problems. Critics in the Indian air force asserted that help from Snecma would not save the ill-fated Kaveri program. But the government apparently believed that it was necessary for India to acquire the ability to design and build world class jet engines, whatever the cost. Only a few nations can do this and India wants to be one of them, soon, no matter what obstacles are encountered. Despite decades of effort, the Kaveri never quite made it to mass production. Now the government will continue funding development of jet engine design and manufacturing capability, but with some unspecified changes.

There is much to be learned from the Kaveri debacle. When work began on the Kaveri, in the mid-1980s, it was believed that the LCA would be ready for flight testing by 1990. A long list of technical delays put off that first flight until 2001. Corners had to be cut to make this happen, for the LCA was originally designed to use the Indian built Kaveri engine and the engine was never ready.

For all this, India only plans to buy 200-300 LCAs, mainly to replace its aging MiG-21s, plus more if the navy finds the LCA works on carriers. Export prospects are dim, given all the competition out there (especially for cheap, second-hand F-16s). The delays have led the air force to look around for a hundred or so new aircraft (or even used F-16s) to fill the gap between elderly MiG-21s falling apart and the arrival of the new LCAs. However, two decades down the road the replacement for the LCA will probably be a more competitive and timely aircraft.
(The Kaveri Engine)
View attachment 40414


Source?!

Guys, dont discuss this until we know who has written it.
 

Latest posts

Pakistan Affairs Latest Posts

Back
Top Bottom