ni8mare
SENIOR MEMBER
- Joined
- Apr 19, 2013
- Messages
- 2,607
- Reaction score
- -5
- Country
- Location
Sanction for the development of LUH was accorded by GoI in Feb 09. The time frame for development is 6 years.
The helicopter in 3 Ton Weight class with Glass Cockpit with MFDs will be deployed for Reconnaissance and Surveillance role. It will be powered by a single engine. The helicopter will be capable of flying at 220 Kmph; service ceiling of 6.5 Km and a range of 350 Km with 500 kg payload.
Source: LUH
Powerplant: 1 × HAL/Turbomeca Shakti 1U turboshaft engine, 1,272 kW (1,706hp) SOURCE: HAL selects the Turbomeca Shakti engine over the LHTEC CTS-800
The helicopter in 3 Ton Weight class with Glass Cockpit with MFDs will be deployed for Reconnaissance and Surveillance role. It will be powered by a single engine. The helicopter will be capable of flying at 220 Kmph; service ceiling of 6.5 Km and a range of 350 Km with 500 kg payload.
Source: LUH
Powerplant: 1 × HAL/Turbomeca Shakti 1U turboshaft engine, 1,272 kW (1,706hp) SOURCE: HAL selects the Turbomeca Shakti engine over the LHTEC CTS-800
Last edited: