GSLV Mk III-D1/GSAT-19 Mission
GSLV Mk III-D1
GSLV-Mk III is capable launching 4 ton class of satellites to Geosynchronous Transfer orbit (GTO). It is a three-stage vehicle with two solid motor strap-ons (S200), a liquid propellant core stage (L110) and a cryogenic stage (C25).
GSLV-Mk III-D1 is the first developmental flight, carrying 3136 kg GSAT-19 satellite to a Geosynchronous Transfer Orbit (GTO). The vehicle is configured with a 5 m ogive payload fairing and slanted strap-on nose cone to provide aerodynamic robustness.
GSLV Mk III-D1/GSAT-19 Mission is scheduled to be launched on June 05, 2017 at 17:28 Hrs (IST) from the Second Launch Pad at SDSC SHAR, Sriharikota