What's new

Ground breaking ceremony of Koto HydroPower Project in KPK Inauguration happened today

mr42O

SENIOR MEMBER
Joined
Aug 15, 2009
Messages
6,178
Reaction score
4
Country
Pakistan
Location
Norway
40.8 MW Koto Hydropower Project, District Dir (Lower)
Koto Hydropower project is located on Panjkora river upstream of Timergara town in Distt: Dir (Lower). Salient features and status of the project is;
• Name of River : Panjkora
• Location : Near Timergara
• Discharge : 126 Cusecs
• Head : 38 Meters
• Capacity : 40.8 MW
• Tunnel Length : 1.76 Km
• Energy : 205 Gwh
• Revised cost of project : Rs: 14.765 Billion
• Approximate revenue per annum : Rs: 1.970 Billion @Rs. 9.62 per unit
• Completion : Dec 2018

11403350_1624554911162583_5642317389028112191_n.jpg


11667436_1624554971162577_8410793967063614084_n.jpg


11659288_1624554947829246_1522425701727019444_n.jpg
 
.
Not bad, but then it cost 140 million USD to build...this is the main drawback of Hydro power?
 
.
40.8 MW Koto Hydropower Project, District Dir (Lower)
Koto Hydropower project is located on Panjkora river upstream of Timergara town in Distt: Dir (Lower). Salient features and status of the project is;
• Name of River : Panjkora
• Location : Near Timergara
• Discharge : 126 Cusecs
• Head : 38 Meters
• Capacity : 40.8 MW
• Tunnel Length : 1.76 Km
• Energy : 205 Gwh
• Revised cost of project : Rs: 14.765 Billion
• Approximate revenue per annum : Rs: 1.970 Billion @Rs. 9.62 per unit
• Completion : Dec 2018

11403350_1624554911162583_5642317389028112191_n.jpg


11667436_1624554971162577_8410793967063614084_n.jpg


11659288_1624554947829246_1522425701727019444_n.jpg
Great going, More such dams needed to be erected. Development is the only way to prosperity.
 
.
Not bad, but then it cost 140 million USD to build...this is the main drawback of Hydro power?

But better than coal , gas , diesel that will cost you much more in form of health. When world is closing down its coal pps we are building new :hitwall:
 
.
But better than coal , gas , diesel that will cost you much more in form of health. When world is closing down its coal pps we are building new :hitwall:

Coal still supplies a lot of electric power needs in the world.
 
.
140 Million USD for 40 MW!!!! damn someone is really getting a kick back it seems
 
.
140 Million USD for 40 MW!!!! damn someone is really getting a kick back it seems
Important thing is storage and irrigation too, will also help prevent any sort of floods, with many other advantages. A good step indeed.
 
.
Important thing is storage and irrigation too, will also help prevent any sort of floods, with many other advantages. A good step indeed.
But if pmln does it, all that is ignored and just based on costs we say "kick backs!"
 
.
But if pmln does it, all that is ignored and just based on costs we say "kick backs!"
Any examples? PMlN involves itself in corruption. Costs of the projects subsequently rises, any reason why they rise. Then there is a debate of giving projects to favored companies. You know how much damage flood does to Pakistan almost every year, such projects are always welcome. What was your point in bringing PMLN in this whole debate? why am i even wasting my time.
 
. . .
Important thing is storage and irrigation too, will also help prevent any sort of floods, with many other advantages. A good step indeed.


These projects are crucial in recharging depleting ground water too
 
.
Any examples? PMlN involves itself in corruption. Costs of the projects subsequently rises, any reason why they rise. Then there is a debate of giving projects to favored companies. You know how much damage flood does to Pakistan almost every year, such projects are always welcome. What was your point in bringing PMLN in this whole debate? why am i even wasting my time.
Last line :D
 
.

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom