Green Signal for Faster Development: India’s New Freight Corridor

. . .
. .
Work on freight corridor is going on in full speed in my region....I can see it while travelling to/from Mumbai
@jbgt90 @ranjeet @4GTejasBVR @The_Showstopper @guest11


Bro even I can see . I am Mumbai kar too

This project is bigger then any project in Asia currently around 90 billions of dollars even almost double then CPEC


Friends This project is actually struck all thanks to Kongress regime bring land law, farmers not agree to give land 15 % land still need to be acquired.
 
.
Friends This project is actually struck all thanks to Kongress regime bring land law, farmers not agree to give land 15 % land still need to be acquired.
This is a pet project of congress Don't be psychotic about 15% land is not big deal
This project is running full steam ahead

http://m.timesofindia.com/city/ahme...y-2019-Suresh-Prabhu/articleshow/52640421.cms

Freight corridor to be completed by 2019: Suresh Prabhu
Jun 7, 2016, 08.08PM IST [ Himanshu Kaushik ]

AHMEDABAD: Railway minister Suresh Prabhu on Tuesday offered all help to the state to start a lion safari express on the lines Tiger Express aimed at spreading awareness on conversation of the big cats. He also promised that the much awaited Dedicated Freight Corridor between Mumbai-Delhi will be commissioned by 2019. While the minister that that the country's first bullet train will roll between Ahmedabad and Mumbai by 2023.


Prabhu was in Mehsana on Tuesday where he laid foundation for several projects including gauge conversion and electrification between Ahmedabad and Mehsana, laying a third line between Ahmedabad-Vatva and a double track between Viramgam and Rajkot.
Prabhu said, "Nearly 90 per cent of the tenders pertaining to DFC projects have been awarded, while the remaining will be awarded in two months' time." Nearly 38 per cent of the 1,504 km long west DFC corridor passes through Gujarat. This corridor connects Jawahar Lal Nehru Port Trust, Mumbai to Dadri in Uttar Pradesh via Vadodara, Sanand and Palanpur.

Railways to seek cabinet approval for funds for three new dedicated freight corridor

NEW DELHI: Firming up plans for expansion of the dedicated freight corridor (DFC) network, railways will seek cabinet approval for arranging fund and acquiring land for the new three dedicated corridors.

Railway Budget 2016-17 has proposed the total 5769 km long track comprising three more dedicated freight corridors in the country to ensure faster movement of goods.

RITES has undertaken the preliminary engineering and traffic system study of the proposed three new routes to ascertain the traffic projection and the report has been submitted to railways, DFCC Managing Director Aadesh Sharma said here today.

The proposed new routes are the 2327 km long East - West Corridor connecting Kolkata to Mumbai, the 2328 km long North - South Corridor linking Delhi with Chennai and the 1114 km long East Coast Corridor from Kharagpur to Vijaywada.

Railways will go to cabinet for approval of arranging funds and beginning the process of acquiring land for the new corridors, he said.

The market share of railways is expected to go up to 50 per cent from the current 18 per cent with the operation of DFC.

While railways will earn revenue from freight movement on the dedicated corridors, DFCC will earn access charge which is about 35 per cent to 40 per cent of the revenue earnings.


http://m.economictimes.com/industry...ted-freight-corridor/articleshow/52572605.cms

http://wap.business-standard.com/ar...-freight-corridor-project-116060800197_1.html

GMR Infra advances as consortium bags Eastern dedicated freight corridor project
Capital Market | Jun 08, 2016 09:48 AM IST

GMR Infrastructure rose 3.39% to Rs 11.91 at 09:35 IST on BSE after the company led consortium bagged 221-km of Eastern dedicated freight corridor project.

The announcement was made after market hours yesterday, 7 June 2016.
Meanwhile, the S&P BSE Sensex was up 18.60 points or 0.07% at 27,028.27

On BSE, so far 6.47 lakh shares were traded in the counter as against average daily volume of 13.78 lakh shares in the past one quarter. The stock hit a high of Rs 12 and a low of Rs 11.80 so far during the day. The stock had hit a 52-week high of Rs 18.60 on 3 December 2015. The stock had hit a record low of Rs 9.58 on 4 September 2015.

The mid-cap company has equity capital of Rs 603.59 crore. Face value per share is Re 1.

GMR Infrastructure led consortium has been issued a letter of award for construction of 221-km long Eastern dedicated freight corridor railway project at a cost of Rs 2280.70 crore on EPC (engineering, procurement and construction) basis.

GMR Group is not required to provide significant investment for the project since it is implemented on EPC basis, GMR Infrastructure said. Earlier in April 2016, GMR led consortium emerged as the successful bidder amongst a total of six bidders for the project through an international competitive bidding process, the company said. The scope of work in the recently bagged project involves design and construction of civil, structures and track works for single/double line on design-build lump sum basis, it added.

The project funded by World Bank is divided into two packages. The first package comprises of 175 km single line connecting Sahnewal and Pilkhani that passes through Uttar Pradesh, Haryana and Punjab. The other package is a 46 km double line corridor in Uttar Pradesh connecting Dadri and Khurja.

GMR Infrastructure's consolidated net loss stood at Rs 953.50 crore in Q4 March 2016, higher than consolidated net loss of Rs 891.90 crore in Q4 March 2015. Total income rose 26.3% to Rs 3828.68 crore in Q4 March 2016 over Q4 March 2015.

GMR Group is a leading global infrastructure conglomerate with interests in airports, energy, transportation and urban infrastructure. The group has fifteen power generation projects, nine operating road assets and a double rail track line of eastern dedicated freight corridor under development.
 
.
This is a pet project of congress Don't be psychotic about 15% land is not big deal
This project is running full steam ahead

http://m.timesofindia.com/city/ahme...y-2019-Suresh-Prabhu/articleshow/52640421.cms

Freight corridor to be completed by 2019: Suresh Prabhu
Jun 7, 2016, 08.08PM IST [ Himanshu Kaushik ]

AHMEDABAD: Railway minister Suresh Prabhu on Tuesday offered all help to the state to start a lion safari express on the lines Tiger Express aimed at spreading awareness on conversation of the big cats. He also promised that the much awaited Dedicated Freight Corridor between Mumbai-Delhi will be commissioned by 2019. While the minister that that the country's first bullet train will roll between Ahmedabad and Mumbai by 2023.


Prabhu was in Mehsana on Tuesday where he laid foundation for several projects including gauge conversion and electrification between Ahmedabad and Mehsana, laying a third line between Ahmedabad-Vatva and a double track between Viramgam and Rajkot.
Prabhu said, "Nearly 90 per cent of the tenders pertaining to DFC projects have been awarded, while the remaining will be awarded in two months' time." Nearly 38 per cent of the 1,504 km long west DFC corridor passes through Gujarat. This corridor connects Jawahar Lal Nehru Port Trust, Mumbai to Dadri in Uttar Pradesh via Vadodara, Sanand and Palanpur.

Railways to seek cabinet approval for funds for three new dedicated freight corridor

NEW DELHI: Firming up plans for expansion of the dedicated freight corridor (DFC) network, railways will seek cabinet approval for arranging fund and acquiring land for the new three dedicated corridors.

Railway Budget 2016-17 has proposed the total 5769 km long track comprising three more dedicated freight corridors in the country to ensure faster movement of goods.

RITES has undertaken the preliminary engineering and traffic system study of the proposed three new routes to ascertain the traffic projection and the report has been submitted to railways, DFCC Managing Director Aadesh Sharma said here today.

The proposed new routes are the 2327 km long East - West Corridor connecting Kolkata to Mumbai, the 2328 km long North - South Corridor linking Delhi with Chennai and the 1114 km long East Coast Corridor from Kharagpur to Vijaywada.

Railways will go to cabinet for approval of arranging funds and beginning the process of acquiring land for the new corridors, he said.

The market share of railways is expected to go up to 50 per cent from the current 18 per cent with the operation of DFC.

While railways will earn revenue from freight movement on the dedicated corridors, DFCC will earn access charge which is about 35 per cent to 40 per cent of the revenue earnings.


http://m.economictimes.com/industry...ted-freight-corridor/articleshow/52572605.cms

http://wap.business-standard.com/ar...-freight-corridor-project-116060800197_1.html

GMR Infra advances as consortium bags Eastern dedicated freight corridor project
Capital Market | Jun 08, 2016 09:48 AM IST

GMR Infrastructure rose 3.39% to Rs 11.91 at 09:35 IST on BSE after the company led consortium bagged 221-km of Eastern dedicated freight corridor project.

The announcement was made after market hours yesterday, 7 June 2016.
Meanwhile, the S&P BSE Sensex was up 18.60 points or 0.07% at 27,028.27

On BSE, so far 6.47 lakh shares were traded in the counter as against average daily volume of 13.78 lakh shares in the past one quarter. The stock hit a high of Rs 12 and a low of Rs 11.80 so far during the day. The stock had hit a 52-week high of Rs 18.60 on 3 December 2015. The stock had hit a record low of Rs 9.58 on 4 September 2015.

The mid-cap company has equity capital of Rs 603.59 crore. Face value per share is Re 1.

GMR Infrastructure led consortium has been issued a letter of award for construction of 221-km long Eastern dedicated freight corridor railway project at a cost of Rs 2280.70 crore on EPC (engineering, procurement and construction) basis.

GMR Group is not required to provide significant investment for the project since it is implemented on EPC basis, GMR Infrastructure said. Earlier in April 2016, GMR led consortium emerged as the successful bidder amongst a total of six bidders for the project through an international competitive bidding process, the company said. The scope of work in the recently bagged project involves design and construction of civil, structures and track works for single/double line on design-build lump sum basis, it added.

The project funded by World Bank is divided into two packages. The first package comprises of 175 km single line connecting Sahnewal and Pilkhani that passes through Uttar Pradesh, Haryana and Punjab. The other package is a 46 km double line corridor in Uttar Pradesh connecting Dadri and Khurja.

GMR Infrastructure's consolidated net loss stood at Rs 953.50 crore in Q4 March 2016, higher than consolidated net loss of Rs 891.90 crore in Q4 March 2015. Total income rose 26.3% to Rs 3828.68 crore in Q4 March 2016 over Q4 March 2015.

GMR Group is a leading global infrastructure conglomerate with interests in airports, energy, transportation and urban infrastructure. The group has fifteen power generation projects, nine operating road assets and a double rail track line of eastern dedicated freight corridor under development.
Previous Congress govts had too many pet projects...with zero executions!
 
.
http://www.indiainfoline.com/articl...en-toubro-stock-price-now-116060600108_1.html
Larsen & Toubro wins construction orders worth Rs.2,161 crore
India Infoline News Service | Mumbai | June 06, 2016 10:30 IST
The order involves electrification works for 417 km section of the Eastern DFC (Dedicated Freight Corridor) from Mughalsarai to New Bhaupur in the state of Uttar Pradesh.

A+ a- 0
The construction arm of L&T has won orders worth Rs.2,161 crores across various business segments.

Transportation Infrastructure Business

The Business has won a major design a build order worth ' 847 Crores from Dedicated Freight Corridor Corporation of India Limited (DFCCIL). This prestigious order has been secured by the consortium of LaT and lnstalaciones lnabensa, S.A., Spain.

The order involves electrification works for 417 km section of the Eastern DFC (Dedicated Freight Corridor) from Mughalsarai to New Bhaupur in the state of Uttar Pradesh.

The scope of works includes construction of 7 Traction Sub Stations (TSS), 18 Switching Stations (SWS), 881 track km of Overhead Equipment (OHE), SCADA and electrical and mechanical works along with supply of all associated equipment. This section will be designed for 2x25 kV traction power system with overhead equipment (OHE) suitable for dedicated freight transport.

LaT Construction is already executing the electrification works for two similar packages of the Western DFC covering 1337 route km with over 3000 track km. With another 417 km of the Eastern corridor project, LaT continues to lead the Railway Electrification segment in India.

The project is planned to be executed using mechanized means of overhead equipment installation using the
latest technology in railway construction. This would be a one-of-its-kind energy efficient system to be implemented in India's rail sector.

This project is funded by World Bank and is part of the 1856 km Eastern DFC proposed between Sahnewal (Ludhiana) and Dankuni (Near Kolkata) via Mughalsarai.

Water & Effluent Treatment Business

The Business has won EPC orders worth Rs.709 crores.

An order has been bagged from Gujarat Water Infrastructure Limited, the scope of which involves design and construction of approximately 146 km of mild steel pipelines and 26 km of ductile iron pipelines.

Further, the Business has also secured an order from Rajasthan Urban Drinking Water Sewerage a Infrastructure Corporation Limited (RUDSICO) for the design, construction and commissioning of Sewage Treatment Plants (STPs) and Sewage Pumping Stations (SPS) along with sewer networks in Alwar, Sikar and Bhiwadi towns of Rajasthan. This project is funded under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) Scheme.

Power Transmission ft Distribution Business:

The Business has won EPC orders worth Rs.403 crores.

An order has been received from Power Grid Corporation of India Limited for the construction of a 400 kV double circuit transmission line package from Tumkur to Hiryur in Karnataka.

Another order has been bagged from Karnataka Solar Power Development Corporation Limited for the construction of 2.20/66 kV substations along with associated transmission line network. This project will be instrumental in power evacuation from the proposed 2000 MW Pavagada Solar Park in Tumkur district.

Metallurgical and Material Handling Business:

Additional orders worth Rs.202 crores have been received from various ongoing jobs of this business.

Previous Congress govts had too many pet projects...with zero executions!
I didn't expected from u such a blunt lie but for ur satisfaction go through already uploaded video above on this thread or below link

https://en.m.wikipedia.org/wiki/Dedicated_Freight_Corridor_Corporation_of_India
 
.
Anybody know how far along the other corridors are?
 
. .
Anybody know how far along the other corridors are?
@fsayed if we can continue to build our infrastructure like this for 10-15 years more, at this pace, then we are very much in the race to become a truly middle income country, and to be in the top league of nations.


Anybody know how far along the other corridors are?
Dedicated Freight Corridors Edit

Sanctioned Dedicated Freight Corridors Edit
Western Dedicated Freight Corridor, (Dadri, Uttar Pradesh to Jawaharlal Nehru Port, Mumbai — 1,468 km).[3]
Eastern Dedicated Freight Corridor, (Ludhiana, Punjab to Dankuni, West Bengal — 1,760 km).[3]
Planned Dedicated Freight Corridors Edit
East-West Dedicated Freight Corridor - connecting Kolkata and Mumbai, 2,000 km-long
North-South Dedicated Freight Corridor - connecting Delhi and Chennai, 2,173 km long
East Coast Dedicated Freight Corridor - connecting Kharagpur with Vijayawada, 1,100 km East Coast corridor
South-West Dedicated Freight Corridor - connecting Chennai and Goa, 890 km-long -
This DFC goes through Bangalore-Chennai Industrial Corridor promoted by Japan & India and as a part of Bangalore-Mumbai Economic corridor promoted by UK & India.
Proposed Dedicated Freight Corridors[4] Edit
Bangalore - Chennai Dedicated Freight Corridor
This DFC goes through Bangalore-Chennai Industrial Corridor promoted by Japan & India.(There are proposals to extend this line to Mangalore to connect India's biggest Petrochemical complex, international air-cargo facility(direct flights to gulf and Europe) and major seaport in Mangalore with Whitefield ICD(Inland Container Depot), through a tunnel being constructed with the help of Japan in Western ghats.[5][6] This will result in hazardous petrochemicals currently being transported by road through tankers migrated to the railway cargo, resulting in efficiency improvements in country's energy security and safety to the common people living alongside national highways).
Table Showing Dedicated Freight Corridors in India Edit
Green background for the systems that are under construction. Blue background for the systems that are currently in planning.

Dedicated Freight Corridor Route Track gauge Speed Length (km) Further Extension Status
Start Point Termination Point
Western Dedicated Freight Corridor Dadri JNPT, Nava Sheva Broad Gauge 1483 Approved in Rail Budget 2014-15.[7]
Eastern Dedicated Freight Corridor Ludhiana Dankuni Broad Gauge 1839 Approved in Rail Budget 2014-15.[8] World Bank has sanctioned loan for development of 393 km of double track between Mughalsarai and Bhaupur (near Kanpur and between Kanpur and Etawah).[9]
East-West Dedicated Freight Corridor Kolkata Mumbai Broad Gauge 2000 Planned
North-South Dedicated Freight Corridor Delhi Chennai Broad Gauge 2173 Planned
East Coast Dedicated Freight Corridor Kharagpur Vijayawada Broad Gauge 1100 Planned
South-West Dedicated Freight Corridor Chennai Goa Broad Gauge 890 branching to Mangalore from Bangalore

https://en.m.wikipedia.org/wiki/Dedicated_Freight_Corridor_Corporation_of_India


http://dfccil.gov.in/dfccil_app/Project_status.jsp
 
.
This project is bigger then any project in Asia currently around 90 billions of dollars even almost double then CPEC
So India is going to be a $40TN economy after it is complete, right, right*????!!! :whistle::whistle:

* according to many esteemed members on PDF, $46BN is going to increase Pakistan's GDP by a factor of ten so $90BN will increase India's by a factor of twenty, surly?


Friends This project is actually struck all thanks to Kongress regime bring land law, farmers not agree to give land 15 % land still need to be acquired.
Around 95% of the land for the WDFC has been purchsed (stated by the Railway Minister a few weeks back). The WDFC will be complete/operational fully in late 2018/early 2019. The UPA really lost their way with this project despite it being a very good concept, they did a poor job in its execution.
 
Last edited:
.
So India is going to be a $40TN economy after it is complete, right, right*????!!! :whistle::whistle:

* according to many esteemed members on PDF, $46BN is going to increase Pakistan's GDP by a factor of ten so $90BN will increase India's by a factor of twenty, surly?

Shouldn't the dollars start flowing from Indian drains too?

Not so, because DFC is NO CPEC perhaps?
 
.
upload_2016-6-9_10-31-34.png
upload_2016-6-9_10-32-13.png
upload_2016-6-9_10-32-29.png
upload_2016-6-9_10-32-47.png
upload_2016-6-9_10-33-5.png
upload_2016-6-9_10-34-17.png


upload_2016-6-9_10-36-23.png


upload_2016-6-9_10-36-41.png
 
.