Indus Pakistan
BANNED
- Joined
- May 7, 2012
- Messages
- 20,487
- Reaction score
- 182
- Country
- Location
Activities in Pakistan
East-West Road Improvement Project (I) (N-70) (PK-P57)
Background
The road condition of N-70 is poor. In particular, the road section on the hilly terrain suffers from frequent falling of rocks and debris and occasional land slide from the mountain side. Its narrow road width, coupled with small curve radius and relatively steep slope, prevents two opposite traffic passing at the same time, and keeps away articulated lorries or trailers from using the route, forcing them to take alternative route via N-65 to Quetta.
Objective
To facilitate mobility of both people and goods between East and West of the country, by improving the road section between Punjab and Balochistan on the National Highway No.70 (N-70), thereby contributing to socio-economic development of the Islamic Republic of Pakistan.
Exchange of Notes signed on May 3, 2008
Term 9 years, beginning October 24, 2008
Total Amount of Aid 15,492 million Yen
Project Location Punjab Province
Executing Agency National Highway Authority (NHA), Ministry of Communications
Project Summary
The National Highway N-70 forms a part of an inter-regional trunk road that runs from east to west across the centre of Pakistan linking Punjab and Balochistan province. N-70 starts at Multan, which is one of the major cities in Southern Punjab, crosses over a high plateau called the Sulaiman Range ranging form 800m to 2,000m in elevation, ends at Qila Saifullah, and further connects via N-50 to Quetta which is the provincial capital of Balochistan.
Project Highlights
Construction of the steel "land bridge" is proposed to improve the narrow road on steep slope.
PAGE TOP
The Japanese construction company Taisei Corporation won the contract to build the actual bridges.
Taisei Corporation
Building construction company
East-West Road Improvement Project (I) (N-70) (PK-P57)
Background
The road condition of N-70 is poor. In particular, the road section on the hilly terrain suffers from frequent falling of rocks and debris and occasional land slide from the mountain side. Its narrow road width, coupled with small curve radius and relatively steep slope, prevents two opposite traffic passing at the same time, and keeps away articulated lorries or trailers from using the route, forcing them to take alternative route via N-65 to Quetta.
Objective
To facilitate mobility of both people and goods between East and West of the country, by improving the road section between Punjab and Balochistan on the National Highway No.70 (N-70), thereby contributing to socio-economic development of the Islamic Republic of Pakistan.
Exchange of Notes signed on May 3, 2008
Term 9 years, beginning October 24, 2008
Total Amount of Aid 15,492 million Yen
Project Location Punjab Province
Executing Agency National Highway Authority (NHA), Ministry of Communications
Project Summary
The National Highway N-70 forms a part of an inter-regional trunk road that runs from east to west across the centre of Pakistan linking Punjab and Balochistan province. N-70 starts at Multan, which is one of the major cities in Southern Punjab, crosses over a high plateau called the Sulaiman Range ranging form 800m to 2,000m in elevation, ends at Qila Saifullah, and further connects via N-50 to Quetta which is the provincial capital of Balochistan.
Project Highlights
Construction of the steel "land bridge" is proposed to improve the narrow road on steep slope.
PAGE TOP
- Asia
- Southeast Asia
- Cambodia
- Indonesia
- Laos
- Malaysia
- Myanmar
- Philippines
- Thailand
- Timor-Leste
- Viet Nam
- East Asia
- China
- Mongolia
- Central Asia and the Caucasus
- Armenia
- Azerbaijan
- Georgia
- Kyrgyz Republic
- Tajikistan
- Uzbekistan
- South Asia
- Afghanistan
- Bangladesh
- Bhutan
- India
- Maldives
- Nepal
- Pakistan
- Sri Lanka
- Oceania
- Latin America
- Africa
- Middle East
- Europe
- Asia
The Japanese construction company Taisei Corporation won the contract to build the actual bridges.
Taisei Corporation
Building construction company