What's new

First Tejas fighter squadron expected by 2017-18

U don't unedrstand, Problem was never HAL or DRDO (ADA). Problem was with IAF. There are some bad apple in IAF who sabotaged the LCA project by changing requirements.

Defence minister knows how to deal with such criminals... HAL will produce 18 planes in given time.. and Defense minister will force IAF to take the squadron..
So its a forced induction against iaf will.
Iaf is right , they are not compromising on quality.
 
.
Yeh they still flying with 60 era planes and talking about quality
 
.
First four will be handed over to the IAF this year in FOC standard, next year HAL will produce 8 LCA and thereafter 16/year so by mid/late 2017 the first Sqn will be ready, thereafter the second one will be ready in late 2018.


It is simply a matter of attaining FOC now and production will be ramped up from there, no big deal really.
No chance of 4 planes in FOC configuration this year.
Even the FOC by this year is highly doubtful.
How will HAL double the production to 16 jets in 1 abd half yr.
 
.
No chance of 4 planes in FOC configuration this year.
Even the FOC by this year is highly doubtful.
How will HAL double the production to 16 jets in 1 abd half yr.
This financial year is what I meant. FOC this year is all but confirmed, HAL have said they aren't looking to push it beyond the current deadline of Dec 2015 so I see no reason to doubt FOC is going to be achieved this year. As for how production will be ramped up- the facilities are already there, the tooling is in place, the capital (human and machine) has been put in place and calibrated all that is needed is FOC. The IAF was said to be pushing for 16/year from 2016 but I don't see this as happening but it will certainly happen in 2017.
 
. . . .
So its a forced induction against iaf will.
Iaf is right , they are not compromising on quality.


Munna, I am so overwhelmed by your respect to our IAF...

Insha-allah Bilawal become your PM soon... I want good of Pakistan.. :P

Tejas is the 9th miracle of this planet.


Thanks for your opinion my dear chinese brother... Since now Modi jee has talked about ppl to ppl contact.. I want to make contact with you :P
 
.
No chance of 4 planes in FOC configuration this year.
Even the FOC by this year is highly doubtful.
How will HAL double the production to 16 jets in 1 abd half yr.
Just like they manufacturers much complex mki and overhaul multiple fighters at once
 
.
Efforts are underway to enhance the production capability," the official added.

???? my assss .WTF you wr doing till now ? So in 2015 you will think about increasing the production line ? Very strange how PSUs works in India . Need a oil drenched slap on each project managers who kept feeding on this project for decades .Nearly one generation. And blind fan boys plz don't give bull shit excuse of ADA dint completed it so HAL can't prepare itself for mass production . That's bullshit . Am really hurt by DRDO who failed this every single lions of India . There is a sayings Lions are ruled by donkeys in India . Well I can't agree more . And Amen for at least people woke up threw these soul vultures congress .Fuckin make some serious progress or I will turn against my god Modi Ji.

Please visit the LCA threads... the situation is more complex than you think. Still your criticism is absolutely justified.
 
.
U don't unedrstand, Problem was never HAL or DRDO (ADA). Problem was with IAF. There are some bad apple in IAF who sabotaged the LCA project by changing requirements.

Defence minister knows how to deal with such criminals... HAL will produce 18 planes in given time.. and Defense minister will force IAF to take the squadron..
OF COURSE .. how the divine babudom can be at fault! they are beyond time limit and all.

Yeh they still flying with 60 era planes and talking about quality
Thats also IAF fault. right?
 
.
Please visit the LCA threads... the situation is more complex than you think. Still your criticism is absolutely justified.

Exactly and am aware of CAG report. If we get capable LCA by 2017 is also ok to digest . But incomplete fighter with huge time delay is just mindboggling . I like to recall the Americans expression when they visited tejas .They was baffled by the way we worked on this life line project of India soo badly and unprofessionally.
 
. .
Dayem, 17 years. Got to be some new kind of record.

They are still not sure......is it 2017 or 2018?

First four will be handed over to the IAF this year in FOC standard, next year HAL will produce 8 LCA and thereafter 16/year so by mid/late 2017 the first Sqn will be ready, thereafter the second one will be ready in late 2018.


It is simply a matter of attaining FOC now and production will be ramped up from there, no big deal really.

I like how you've been so accurately optimistic for the past so many decades......
 
.
When is SP-2 ready? Let's say next year. If so, by 2016 2 planes SP-1 and SP-2. To form the first squadron needs 18 planes. 2017 IMO not possible.
 
.
Back
Top Bottom