Is the work on 5th extension also started or to be started soon?
4 is underconstruction and will be completed by 2017. There is plan for 5th as well, but that maybe by 2018-19.
2018-19 for completion of 5th extension?
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
4 is underconstruction and will be completed by 2017. There is plan for 5th as well, but that maybe by 2018-19.
at Gadani 6 will be made by China 2 by Turkey and 2 by U.A.E and read somwhere that Basha Dam will be delayed by 2037
2018-19 for completion of 5th extension?
Is the work on 5th extension also started or to be started soon?
2018-19 for completion of 5th extension?
Lol India adds this much in 3 months every year. Btw is there any company is Pakistan that manufactures transmission lines.Quaid-e-Azam Solar Power Plant (1000 MW) by end of 2016
2 Coal Power Plant at Qasim Port (660 MW Each) by end of 2017
1 Coal Power Plant at Sahiwal (660 MW) by end of 2016
Neelum Jehlum (969 MW) by end of 2016
Thar Coal Power Plant (660 MW)
Gharo Wind Power Project (250 MW) by end of 2016
Nandipur Thermal Power (525 MW) by end of 2014
5264 MW till 2017 and more later....
Should start working on Transmission lines
Lol India adds this much in 3 months every year. Btw is there any company is Pakistan that manufactures transmission lines.
Lol India adds this much in 3 months every year. Btw is there any company is Pakistan that manufactures transmission lines.
Quaid-e-Azam Solar Power Plant (1000 MW) by end of 2016
2 Coal Power Plant at Qasim Port (660 MW Each) by end of 2017
1 Coal Power Plant at Sahiwal (660 MW) by end of 2016
Neelum Jehlum (969 MW) by end of 2016
Thar Coal Power Plant (660 MW)
Gharo Wind Power Project (250 MW) by end of 2016
Nandipur Thermal Power (525 MW) by end of 2014
5264 MW till 2017 and more later....
Should start working on Transmission lines
The problem is not power generation. The problem is CIRCULAR DEBT.
There is no power system that can work when the consumers do not pay for the power they consume in a timely manner.
Any source ???Lol India adds this much in 3 months every year. Btw is there any company is Pakistan that manufactures transmission lines.
Has anybody got a fact sheet for cost for generating Power via
1) Furnace oil
2) Diesel
3) Imported coal
4) Local Coal
5) Gas
6) Solar
7) wind
8) hydel
9) Nuclear
10) and Bagass
Over the weekend we friends had nothing to do... load shedding was at its peak hence we enjoyed a long bath + sports at my Tubewell... doing nothing but building castles after castles in the air on how things can improve for the country and what are the projects which are of utmost importance hence needed to be taken up asap... no one amongst us knew the cost for all 10 above hence would appreciate if someone can provide the details.
Here are some international data about the cost of producing electricity:
ElectricityCosts by VChengPhotos, on Flickr