Energy Projects...Updates

Mohmand Dam Hydropower Project - 800 MW
Under Construction since September 2019
Gross Storage 1.2 MAF
Annual Energy Production 2,862 GWh
Completion date: 2025


1635690225441.png




1635690247809.png
 
.
Diamer Basha Dam - 4500MW
Construction works commenced in 2020
8.1MAF water storage and will irrigate 1.2 million acres agricultural land
Annual generation 18,097 GWh
Construction Period: 09 years



1635879828052.png




1635879850956.png




1635879870579.png
 
.
Secretary (Energy & Power Department) visit 11.8 MW Karora_HPP on 1st November, 202,
Also visited the 40.8 MW Koto_HPP along with CEO PEDO on 2nd November 2021.

Project Directors of both the projects briefed about the progress and current status of their respective projects.

Credits: Pakhtunkhwa Energy Development Organization.
 
. . . .

Jagran-II Hydropower Project (JHPP-II)


It is the second time in a year that two tunnels met deep inside the mountain with a tolerance of less than 2.5 centimetres. Previously, it was done on 27 Jan 2021 when two tunnels inside the mountain with a tolerance of less than 10 centimetres.

FWO has excavated 3833 metres of main Headrace Tunnel without even a single casualty in just 485 working days. So far, FWO has excavated 4.7 kilometres long tunnels at this project.
Credits: FWO


1637288906116.png




1637288931712.png
 
.

Historic Moments at first CPEC Hydropower Project – 720MW Karot HPP


The reservoir impounding of First Hydropower Project of CPEC has started today, Nov 20, 2021. Diversion Tunnels were closed and the Project moved one step closer to generate clean, green and cheap energy.


1637442690632.png





1637442712951.png




1637442733506.png
 
. . .

Another Milestone marked at Biggest Hydropower Project of CPEC – 884MW Suki Kinari HPP


The top slab of the double-layer spillway structure has been completed successfully. To celebrate this milestone, a short ceremony was held on 27th November 2021 at the Dam site.
The representative of all stakeholders has participated in the ceremony and appreciated the efforts, acknowledged the technical difficulties and hardwork involved in the successful completion of the spillway.


1638112388649.png




1638112412070.png
 
. .
Diamer BhashaDam project: Wapda signs Rs860m agreement with SCO

Recorder Report
02 Dec 2021


61a7e79521aef.jpg



LAHORE: The Pakistan Water and Power Development Authority (Wapda) has signed Rs 860 million agreement with Special Communication Organization (SCO) to avail uninterrupted and state-of-the-art communication and information technology services for Diamer Bhasha Dam project. The services may also be utilized for other Wapda projects as well.

The contract signing ceremony was held at Wapda House. Wapda General Manager Diamer Basha Dam project Muhammad Yousuf Rao and SCO Director Development Col Muhammad Saadi Manzoor signed the contract on behalf of their organizations. Wapda Member (Water) Jawaid Akhter Latif and other senior officers of Wapda and SCO also attended the ceremony.

Diamer Bhasha Dam project is of immense strategic significance, construction of which requires uninterrupted and state-of-the-art communication and information technology services in the project area in most challenging terrain and weather.

Under the contract, the SCO will provide 4G cellular sites equipment, transmission media comprising 300 Km optic fiber cable from Thakot to Chilas, power arrangements and all required civil works including construction of towers as well as commissioning of 4G sites at various locations of Diamer Basha Dam project.

Copyright Business Recorder, 2021
 
.
Lawi Hydropower Project

A successful breakthrough of Headrace Tunnel from Inlet to Adit No. 1 Upstream.''

The headrace tunnel of Lawi Hydropower Project is 12.1km with 05 Adits out of which 8.4km have been excavated.

Although the tunnel is very close to the Main Karakuram Thrust (A suture zone between Karakuram Block of Eurasian Plate and Kohistan Island Arc) but the most of the rock mass along the tunnel falls in Good to Fair rock.
Credits: Muhammad Tariq Niaz


1638456122999.png




1638456145544.png

.


1638456454283.png
 
Last edited:
.
Diamer Basha Dam 4500MW - Under Construction


The Construction works were commenced in July 2020 on this monumental project. InshAllah, on completion, this dam will reduce water scarcity and also address power woes of the country.


1638538114557.png




1638538134198.png




1638538156878.png
 
.