Both deals are apparently still on the table..
Egypt wants a big Scorpene deal with major ToT and local production..and for that it is in the process of building a submarine production facility that will need a very advanced production line and machinery..It takes time..so we might hear some good news when all that is finalized..Egypt want around 12 Scorpene submarines in the long run..It is a smart move sine it is open architecture and will be upgraded with the latest technologies continuously through the production process on 20 or 30 years..
The Eurofighter come in the Italian package..so far we've seen the 2 first Berghamini frigates delivered and 2 others contracted..
https://www.globaldefensecorp.com/2021/04/29/italy-egypt-to-sign-mega-defense-deal/
* These are expensive and comprehensive deals that will take time to finalize..mostly because both involve ToT.. so we need some patience..