W.11
BANNED
- Joined
- Jan 20, 2011
- Messages
- 15,032
- Reaction score
- -32
- Country
- Location
that plan was scarped..a simple googel search will tell you this
the reason being that some of the land isnt available
lmao, plan was never implemented, the study was already done and it was even approved, JICA proposed it in 2005, BRT lines are the proof that JICA plan was still being implemented, here it is from WP
- 08 August 2012: Karachi Metropolitan Corporation Administrator, Muhammad Hussain Syed, stated the study report for restoration of the KCR had completed and that construction would resume by September 2013.[16] JICA agreed to a ₨260 billion (US$1.6 billion) loan to the Karachi Urban Transport Corporation, which would oversee the rebuilding and refurbishment of KCR.[17] The plans called for upgrades and rebuilding of the 50 kilometer long circular loop line which would operate 24 trains facilitating 700,000 commuters, making 3-minute stops at 23 stations.[18] However, this plan never materialized.
The every penny goes to Punjab and lahore, if that is not the case, please see the last KMC budget and tell me how did it reduce? from 2019 to 2020? is karahci paying less taxes?
regards