What's new

Dhaka opens power corridor to New Delhi

Whats new in it. Its awami bastards we are talking about. There is nothing left to loose actually. Awami bastards have sold out everything. Progress on giving chanakyans self-destructive 'Transit' has been going on unabated. We should not allow any deals to begin with no matter whether they agree to LBA or teesta, both of which Btw are our inalienable right under intl law while they only have unfathomable outrageous wish list very determinant to our long term interest.
 
Whats new in it. Its awami bastards we are talking about. There is nothing left to loose actually. Awami bastards have sold out everything. Progress on giving chanakyans self-destructive 'Transit' has been going on unabated. We should not allow any deals to begin with no matter whether they agree to LBA or teesta, both of which Btw are our inalienable right under intl law while they only have unfathomable outrageous wish list very determinant to our long term interest.

Whether we will give transit to India or not is our wish as an independent nation {so called}, but we must not reciprocate Transit issue with other deals like LBA or Teesta which is our legitimate demand. Only Indian Awami Dalals think that we owe to India and should reciprocate.
 
Until LBA and Teesta issue is resolved we should go into a non-cooperation mode.
 
bro you did not get it :P we gave you transit to transfer your equipments for power plant in return we are suppose to get some electricity.

You are talking about power from Tripura. We are supposed to get 100 mW from there in exchange for giving transit for heavy machines. Tripura CM Manik Sarkar is willing, but he was complaining against the Delhi Govt. that it is trying to backtrack from its promise. AL govt was supposed to put things in agreement, but these amatures in Dhaka did not do so.
 
it was suppose to supply electricity from the beginning this month but it is not approved finally by GOI and lots of work need to finish to give electricity to bangladesh, no progress
But baba, the hydroelectric plants in Arunachal Pradesh are not ready and producing electricity as yet. So is the gas plant in Tripura which developed a fault.
 
read my post again, we kept promise (you got transit) but you did not keep it

It will start from October Electricity Import from India | Dhaka Tribune


it was suppose to supply electricity from the beginning this month but it is not approved finally by GOI and lots of work need to finish to give electricity to bangladesh, no progress

There is delay in the project. When it starts generating, BD will also get its share. ONGC dilly-dally delays Tripura gas power project
 
Dhaka's "POWER CORRIDOR" was always opened for New Delhi.......Whats new in That???
 
Awami ghaddars will fall within couple of month Inshallah. Get ready to take some steam out by giving dulaai to these bastards.
 

Latest posts

Pakistan Affairs Latest Posts

Back
Top Bottom