What's new

Dasu Hydropower Project: China links resumption of work to payment of compensation?

Tomcats

SENIOR MEMBER
Joined
Jan 24, 2020
Messages
2,268
Reaction score
1
Country
Pakistan
Location
Pakistan
ISLAMABAD: China has reportedly sought compensation of $38 million (Rs 6.5 billion) from Pakistan for the dead and injured Chinese engineers working on Dasu Hydropower Project, prior to resuming work on the stalled project, well informed sources told Business Recorder.

On July 14, 2021, thirteen people, including nine Chinese engineers, two locals and two personnel of the Frontier Constabulary (FC) died and over two dozen other people sustained injuries when a bus carrying the team working on the project fell into a ravine after it was hit by a car laden with explosives.

Pakistani authorities say that Indian Spy Agency, RAW, was directly involved in the attack on the Chinese team working on construction of tunnel site of 4,300MW Dasu project.

According to Secretary Water Resources, Dr Shahzeb Khan Bangash, the civil work in the project has been stalled since the attack on Chinese engineers in July.

The sources said the issue of compensation to the Chinese nationals is being discussed at a high level. Ministry of Foreign Affairs, Ministry of Finance, Ministry of Interior, Ministry of Water Resources and Chinese embassy were working closely on the compensation package, as well as, resumption of work on the project.

According to sources, the Steering Committee, comprising Secretaries of concerned Ministries had constituted another Committee which deliberated on the issues linked to Dasu project, especially volume of compensation being demanded by the Chinese government.

Govt tells NA body: Work on Dasu Dam remains stalled since attack on Chinese

The Committee has constituted a Subcommittee, comprising all the relevant Ministries to discuss compensation package by taking the Chinese embassy on board as the proposed package is being termed as “irrational”.

The sources said, the Subcommittee of all Ministries will deliberate on the compensation package demanded by the Chinese government and will share its working with the main committee, which will give its approval. “The Subcommittee will develop a benchmark for compensation considering that if the demand of Chinese government is met as it is it will create issues for the government in future,” the sources maintained. Secretary Water Resources, the sources said, is hopeful that compensation issue will be sorted out within a couple of weeks, after which civil work on the site will resume.

National Electric Power Regulatory Authority (Nepra) which had allowed one per cent of capital cost as security to be built in the consumers’ end tariff, has not yet inquired from the Water and Power Development Authority (Wapda) as to the reasons for the insufficient security to those who are working on power projects.

The Chinese firm, China Gezhouba Group Corp, which suspended work on the Dasu project after the bus incident, had announced negation of its decision to resume work and terminate Pakistani workers, on the request of the Pakistani government. However, the company has not yet resumed work and is saying that it will not proceed ahead until compensation package and more security of Chinese nationals is provided.

Recently, Chairman Water and Power Development Authority, Lt. Gen. Muzammal Hussain (retired) who has secured another term met Prime Minister Imran Khan and briefed him about hydropower projects including the Dasu project.

“We are in close contact with the Chinese embassy in Islamabad, as well as, China Gezhouba Group Corp so that work resumes on the project within the next 15 days,” said an official on condition of anonymity.
 
Last edited:
. .
9 Chinese were killed so each one will be 4.2mn$ /head its not expensive ? :D

Chinese engineers are killed in the 1000s on construction projects in China and government does nothing

no need to make this a big deal

as usual China has a rather inflated view of itself
 
. . . . . .
Did the Chinese engineers beat 200 million Pakistani's to the Dasu project? Or did Pakistan need them?

so we should sell Pakistan to China for money ?

How much you are paid for trolling pro- China propaganda
 
.
This is extremely unfair

imagine such conditions were imposed during the construction of Korakaram Highway (KKH) when several hundred Chinese and 1000+ Pakistani workers and engineers died due to extreme weather conditions and dangerous environment with little technology compared to modern standards

It’s giving the notion of China of 80s and 90s was a great friend and China of 2021 is a businessman
 
.
Friends always find resolution to problems. Only a matter of time before Chinese friends get back to work.
ISLAMABAD: China has reportedly sought compensation of $38 million (Rs 6.5 billion) from Pakistan for the dead and injured Chinese engineers working on Dasu Hydropower Project, prior to resuming work on the stalled project, well informed sources told Business Recorder.

On July 14, 2021, thirteen people, including nine Chinese engineers, two locals and two personnel of the Frontier Constabulary (FC) died and over two dozen other people sustained injuries when a bus carrying the team working on the project fell into a ravine after it was hit by a car laden with explosives.

Pakistani authorities say that Indian Spy Agency, RAW, was directly involved in the attack on the Chinese team working on construction of tunnel site of 4,300MW Dasu project.

According to Secretary Water Resources, Dr Shahzeb Khan Bangash, the civil work in the project has been stalled since the attack on Chinese engineers in July.

The sources said the issue of compensation to the Chinese nationals is being discussed at a high level. Ministry of Foreign Affairs, Ministry of Finance, Ministry of Interior, Ministry of Water Resources and Chinese embassy were working closely on the compensation package, as well as, resumption of work on the project.

According to sources, the Steering Committee, comprising Secretaries of concerned Ministries had constituted another Committee which deliberated on the issues linked to Dasu project, especially volume of compensation being demanded by the Chinese government.

Govt tells NA body: Work on Dasu Dam remains stalled since attack on Chinese

The Committee has constituted a Subcommittee, comprising all the relevant Ministries to discuss compensation package by taking the Chinese embassy on board as the proposed package is being termed as “irrational”.

The sources said, the Subcommittee of all Ministries will deliberate on the compensation package demanded by the Chinese government and will share its working with the main committee, which will give its approval. “The Subcommittee will develop a benchmark for compensation considering that if the demand of Chinese government is met as it is it will create issues for the government in future,” the sources maintained. Secretary Water Resources, the sources said, is hopeful that compensation issue will be sorted out within a couple of weeks, after which civil work on the site will resume.

National Electric Power Regulatory Authority (Nepra) which had allowed one per cent of capital cost as security to be built in the consumers’ end tariff, has not yet inquired from the Water and Power Development Authority (Wapda) as to the reasons for the insufficient security to those who are working on power projects.

The Chinese firm, China Gezhouba Group Corp, which suspended work on the Dasu project after the bus incident, had announced negation of its decision to resume work and terminate Pakistani workers, on the request of the Pakistani government. However, the company has not yet resumed work and is saying that it will not proceed ahead until compensation package and more security of Chinese nationals is provided.

Recently, Chairman Water and Power Development Authority, Lt. Gen. Muzammal Hussain (retired) who has secured another term met Prime Minister Imran Khan and briefed him about hydropower projects including the Dasu project.

“We are in close contact with the Chinese embassy in Islamabad, as well as, China Gezhouba Group Corp so that work resumes on the project within the next 15 days,” said an official on condition of anonymity.

Don't worry. America won't be able to benefit in any way or form.
 
. . . .
Only Indian media reported so far

Interesting. May be it is not true. Could be a propaganda news.
while a pakistan gets 5 lakhs!---------

we should ask china another 30 million $$$ loan to pay china again

If the news is true (this is the big question), then I am sure there would be room for negotiation. Pakistan and China may agree to the amount what China pays to people who get injured or killed in China.

Can some Chinese confirm what is the compensation in China in such cases?

@MH.Yang @Beidou2020 @lonelyman @Dungeness @Beast @kankan326 @Pangu @ChineseTiger1986 @chinasun
 
Last edited:
.

Pakistan Affairs Latest Posts

Back
Top Bottom