UserUnknown2025
FULL MEMBER
- Joined
- Mar 9, 2018
- Messages
- 475
- Reaction score
- -7
- Country
- Location
We are witnessing history
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
He can be trusted.And how reliable is he?
He can be trusted.
Time will tell the true.Just to clarify, am I right in assuming that some module assembly work, has begun on 003 inside one of the large sheds, and once the 055 Cruiser, and the other ship to the side of it, have had their work finished in the dry dock, then when they move out, then the 003 construction will be moved outside?? btw:- how does anyone know 003 is actually being constructed, as being inside a hallway, its hidden from view.......unless you work in the shipyard?
Most of the big shrimps have some kind of connections with the shipyards and the military or military related institutions, and their leaks are usually tolerated by the authorities as long as they are within certain limits.Just to clarify, am I right in assuming that some module assembly work, has begun on 003 inside one of the large sheds, and once the 055 Cruiser, and the other ship to the side of it, have had their work finished in the dry dock, then when they move out, then the 003 construction will be moved outside?? btw:- how does anyone know 003 is actually being constructed, as being inside a hallway, its hidden from view.......unless you work in the shipyard?
fzgfzy release a series of photos allegedly showing current 003 progress at JNCX, and mentioned right now it's in sub assembly production, and we are a long way from seeing any major modules that can be recognized as carrier part. Mainly due to changes in design (I'd imagine that's related to switching to EM Launch) and subsequent upgrades in the new JNCX facility.
From the look of it the pictures shows JNCX's brand new carrier fabrication building which became operational last November.
不要太想当然,我当时就说了,一旦要改就快不了,电蒸pk也是我先发的,之后改图纸可改死人了。到船厂还要按生产再深化一次图纸,我一小姐姐当时负责算某大补的绝缘,就用了一个月,更别说复杂几十倍的航母。至于新厂,盖了建,建又改(加东西),加了又加。厂还没整利索呢(见图),有些东西堆傍边,还不是03的。某地里面应该是有些号好的料了,小的组立可能也有,大分段就扯了,一旦展开是不能脱节的,前面的东西没有一定的量,是不可能进入下一步的。
From CJDBY.Just found at the CDF posted by "hmmwv" (http://www.china-defense.com/smf/index.php?topic=6622.msg321805#msg321805)
View attachment 479063 View attachment 479064 View attachment 479065
From CJDBY.
https://lt.cjdby.net/forum.php?mod=...5&extra=page=2&filter=author&orderby=datelineRegrettably I only found it at the CDF ... do you have the link? Thanks in advance.
Deino you might like to qualify what you mean by started? Because there can be a number of different "start" dates. Do you mean first steel cut? First modules started? Not to be a pedant but you could be a number of different dates.
Agreed ... Sorry for being misleading: I meant "first steel cut"!