What's new

CV-18 Fujian - Type 003 Aircraft Carrier News & Discussions

. . . . .
Steel cutting for the 003 began on June 29, 2017. There is no way they could've started dock assembly at this stage.
I believe Professor Ma Weiming gave a presentation and told his audience that the 003 construction was postponed personally by Xi due to the then on-going catapult competition. So the construction of individual modules should have started already ... maybe not assembly but shouldn’t be too long either
 
.
I believe Professor Ma Weiming gave a presentation and told his audience that the 003 construction was postponed personally by Xi due to the then on-going catapult competition. So the construction of individual modules should have started already ... maybe not assembly but shouldn’t be too long either

The individual modules would have to be designed around the catapult, so either that the existing modules had to be scrapped or that they never started in the first place. Unless there is zero discrepancy in configuration between electromagnetic vs steam cats, I highly doubt that steel cutting started earlier than the mentioned date.
 
.
The individual modules would have to be designed around the catapult, so either that the existing modules had to be scrapped or that they never started in the first place. Unless there is zero discrepancy in configuration between electromagnetic vs steam cats, I highly doubt that steel cutting started earlier than the mentioned date.

To admit I'm not a specialist in shipbuilding but I'm not sure if or how much the construction of the lower deck modules will differ between a EM- or Steam-Cat-carrier?

Can anyone explain?

Deino
 
. .
The construction has never begun until this year.

Can you explain this?


211415tlunomv78zv78zur.png
 
. . . .
Interesting that you brought up J-15S & KJ-600.

Hasn't the J-15S been canceled, and when is the J-15B finally going to debut?
not canceled, too much changes, caused technological difficulties and hence delay```the AWACs is roughly the size of E-2C``````and the 5th gen AC based stealth fight program is about to freeze the technology prospect, therefore will soon entre the second phase of "chucking" out prototypes `````````but I still don not know how it looks`````````could be a hybrid, or could be just like her mon```:lol:
 
.
The construction has never begun until this year.

Ok ... any specific date given when it started?

... but back to my question: How much would the construction of the lower deck modules differ between a EM- or Steam-Cat-carrier?

Deino
 
.

Latest posts

Back
Top Bottom