What's new

Chinese Navy (PLAN) News & Discussions

In one hand, collection of informations related to the construction like 1600t gantry crane in Changxing Jiangnan, specific steels development, R&D documents...etc, in an another hand, PLA Navy videos.

And finally, some "insiders" who indicate that the project of 2 first ships is confirmed.



Q2 2016.

Henri K.

Is that really possible that Carrier 001A will be launched Spring of this year, as some are saying on other military sites, that there is still an awful lot of work to be done yet to get to this point, even though the Chinese are very efficient workers? They havn't even fitted out fully the bow and stern, never mind the getting all the sides fitted upto deck level, and then actually fitting the deck!
 
.
In one hand, collection of informations related to the construction like 1600t gantry crane in Changxing Jiangnan, specific steels development, R&D documents...etc, in an another hand, PLA Navy videos.

And finally, some "insiders" who indicate that the project of 2 first ships is confirmed.



Q2 2016.

Henri K.

So the launch date of the Type 001A gonna most likely be April 23th 2016, because it is the 67th anniversary of the PLAN.

Is that really possible that Carrier 001A will be launched Spring of this year, as some are saying on other military sites, that there is still an awful lot of work to be done yet to get to this point, even though the Chinese are very efficient workers? They havn't even fitted out fully the bow and stern, never mind the getting all the sides fitted upto deck level, and then actually fitting the deck!

DL and JN are two very different shipyards.

DL prefers to prematurely launch the ship; considers the process of building the Type 052D.
 
.
WMMP (Wuhan Marine Machinery Plant Co., LTD) delivered VPP (Variable-pitch propeller) to russian customer.

公司首批出口俄罗斯全回转舵桨全部完成发运

20151214085609763504.jpg


The same company signed a contract to deliver 5 sea replenishment systems to a "Russian 9000 t replenishment oiler project", which should be the Project 23130 "Academician Pashin” of Russian navy.

公司签订综合补给系统出口项目

Henri K.
 
. . . . .
Good news!

So including this, by now total 21 ships of 054A FFG are in service?

View attachment 285191
Yes... But we need more DDG, I think we have enough number of frigates. Type052D is the true multi role for real power projection. They can sail alone or in groups of 2-3 for power projection against small countries like cruise missile attack and aerial restriction(no fly zone) with their HQ-9 LRSAM with limited support.
 
.
Yes... But we need more DDG, I think we have enough number of frigates. Type052D is the true multi role for real power projection. They can sail alone or in groups of 2-3 for power projection against small countries like cruise missile attack and aerial restriction(no fly zone) with their HQ-9 LRSAM with limited support.


Obviously bro. Before 055A is ready, PLAN has to rapidly build 052D to a critical mass. The 054A FFG serves different roles, they are another integral part of overall PLAN capability.

PLAN also has other older assets. The older FFG could be gradually transferred to Coast Guard. The older DDG could be transferred to allied navies, there are 17 ships in 6 older DDG classes:

 
. . . . . . .
Back
Top Bottom