Tibet Railway Construction

Tibet Railway has been constructed in different time periods separately. The section from Xining to Golmud has been completed in 1979 and put into use in 1984. The section from Golmud to Lhasa has gone into service on July 1st, 2006. One of its three branches, Lhasa- Shigatse Railway has been put into operation on August 15th, 2014; it is planned that by 2020, this branch will be extended for another 336 miles (540 kilometers) from Shigatse to Gyirong port, the border of China and Nepal. The other two branches, Lhasa- Nyingchi and Shigatse-Yadong Railways are also scheduled to be opened by 2020.
Construction Challenges

As the railroad traverses through world’s highest plateau (Qinghai-Tibet Plateau) and many other complicated landforms, lots of challenges and difficulties have been encountered during its construction work, including three major ones: permafrost, a fragile ecological environment, and lack of oxygen.

Permafrost - a mixture of soil and ice under 32 F (0C) - expands in winter and contracts in summer. As the railroad is built upon this kind of soil, the bed sinks very easily. Different measures have been taken to overcome this in differing sections accordingly- permafrost areas has been avoided if possible, bridges built to replace the railroad bed descending and ascending valley contours, and some new materials like heat transfer prevention planks have been used to guarantee the stability of the railroad bed on the perennial frozen soil.

As the Qinghai-Tibet Plateau is the cradle of many rivers and home to lots of rare wild animals, protection of local fragile ecological environment is the second challenge during the construction work. In order to lessen the damage to the greatest extent within Hoh Xil and other nature reserves, the railroad circumvents these areas where possible, with the Flora and Fauna protected as much as possible. To guarantee the daily living and migration of the rare wild animals, 33 migration routes have been built: routes over tunnels for animals living in mountainous areas, and underground passages for animals on the flatlands. To decrease disturb to the local environment, bridges have been built above the lakes instead of on the shoreline; the number of train stations has been greatly restricted to decrease the effect to the environment, effective sewage treatment measures have been adopted in both stations and trains along the way.

The third challenge- lack of oxygen – has been a threatening to constructors’ lives. To solve this problem, 17 oxygen-making stations and many clinics have been built along the way. To ensure the safety of passengers, oxygen outlets are also equipped inside each cabin to Tibet.

Famous Projects


Reputed as “Heavenly Road”, a number of featured architectures have been built along the way for animals to live as usual and trains to run smoothly and safely. Many of them even broke the Guinness World Records. Below is a list of major ones.

Nanshankou Framing Base: Famous for advanced technologies and high framing speed, the highest framing speed it has achieved was 7,191 yards (6,575 meters) a day, roughly the same as on flatlands.

Fenghuo Mountain Tunnel:

Located in the hinterland of Tibet Plateau, 16,093 feet (4,905 meters) above sea level, it is world’s highest rail tunnel. In addition, the whole tunnel, measuring 1,463 yards (1,338 meters) long, goes through permafrost area. It took over 300 engineers and workers about one year to complete it.

Tangula Railway Station: With an altitude of 16,627 feet (5,068 meters), this is the world’s highest train station. To make the permafrost under the station stable, the tracks have been built on the unique rubble ventilation embankment.

Kunlun Mountain Tunnel: Measuring 1,844 yards (1,686 meters) long, this is world’s longest tunnel through plateau permafrost areas. The procedures of building it are one time more than on plains, due to the low temperature and thin oxygen.

Qingshui River Bridge: Traveling through the depopulated Hoh Xil, the bridge was built to replace railroad bed, so animals can migrate as before via bridge openings. There are over 1,300 openings under this 11.7-kilometer-long (7.3 miles) bridge.

Sanchahe Bridge: Passing above a deep valley, the bridge is as high as 177.5 feet (54.1 meters). It is supported by 20 piers and 17 of them are hollow and round, with the top only 11.8 inches (30 centimeters) thick. It has been a grand site along the way.

Yangtze River Origin Bridge: It is built in Tuotuo River basin, the talik area of permafrost and the origin of the Yangtze River. To protect local environment, the drilling mud has been sank into the river bed again rather than threw into the river directly; the building rubbish were moved to designated site to be disposed.

Lhasa River Bridge: This is the final large bridge built for the railroad. Its main piers resemble yak legs and side piers snow lotuses, representative animal and plant of Tibet respectively. The three large arches are like three giant white Hada (a piece of silk used to welcome guests by Tibetan and Mongolian people), welcoming passengers. This bridge has nowadays been one of the landmarks in Lhasa and many tourists to the city will come and visit it.

Tibet Railway Construction: Challenges, Major Projects





The Qinghai-Tibet Railway: An Engineering Miracle

p978_d20140512163404.jpg


cbfc173db1217304e597d6fd540301e3_large.jpeg


railway.jpg


1-12101F95643463.jpg

1-12110511130Db.jpg


6.jpg


P200911241559103150032748.jpg


4aa3cf97jw1esy52w1cguj20xc0m0dp0.jpg



When railway construction workers first came to the Qinghai-Tibet Plateau, they were amazed at the majesty of its snowfield scenery. Cut off from the outside world, everything on the plateau -- its snow-capped mountains, grassland, lamas, prayer banners, the Potala Palace, and the Tibetan people living 4,000 meters or more above sea level, has an aura of mystery.

Beautiful it may be, but Tibet lags behind other areas of China. Inadequate transportation facilities restrict its economic development, as it is only accessible by highway or air transportation. This is, to a certain extent, attributable to the harsh climate and geographical environment on the plateau, but it is obvious that if Tibet is to develop and catch up with other areas of China, it must have a railway.

With this in mind, the Ministry of Railways invited experts from the Chinese Academy of Sciences, the State Seismological Bureau, the Ministry of Communications, and the Chinese Academy of Geology, to discuss the feasibility of constructing the Qinghai-Tibet Railway.

In 2000, a report on constructing the Qinghai-Tibet Railway was passed to President Jiang Zemin by the Minister of Railways, Fu Zhenhuan.

President Jiang Zemin responded with three full pages of written instructions. He pointed out that construction of the Qinghai-Tibet Railway would benefit the development of Tibet's communications and tourism, and promote economic and cultural exchanges between Tibet and the interior. He said that this decision must be taken and expedited as China enters the new century.

On June 29, 2001, construction of the Qinghai-Tibet Railway started at Golmud, Qinghai Province. The railway will traverse the Hoh Xil "no-man's land," cross the Kunlun Mountain Pass (4,767 meters above sea level), to enter the Northern Tibet Plateau, and then go on to Lhasa, capital of Tibet Autonomous Region. Out of the 1,142 kilometers of railway, 960 kilometers are more than 4,000 meters above sea level and 550 kilometers are in areas of frozen earth. Thirty railway stations are to be built, among them Tangula Mountain station, which will be the highest-altitude railway station in the world. When the railway is complete, it will be possible to travel from Lhasa to Beijing in just 48 hours.

Construction of the Qinghai-Tibet Railway will take six years, at a total investment of 26.2 billion yuan (US$3.17 billion). There are unparalleled difficulties to address regarding terrain and environmental protection in this project. Its construction has consequently attracted worldwide attention, and been compared in magnitude to that of the Great Wall.

Building the highest-altitude ever railway to traverse the frozen earth zone is a first in the history of railway construction. It is testimony to the development of science and technology in China, and constitutes a scientific record of Chinese exploration on the Qinghai-Tibet Plateau.

Overcoming the Hidden Perils of Frozen Earth

Scientists originally planned four possible railways to Tibet: the Qinghai-Tibet Railway, the Sichuan-Tibet Railway, the Yunnan-Tibet Railway, and the Xinjiang-Tibet Railway. They settled on the Qinghai-Tibet Railway because, apart from the frozen earth aspect, it is much the best choice of the four as regards avoiding avalanches, desert, and marshland. It is nevertheless a project hitherto unequaled in engineering cost, project duration, and transportation capacity.

Building a railway over areas of frozen earth is a feat seldom attempted. A century ago, Russia built a railway on the frozen earth zone in Siberia, near the North Pole. Later, Canada, the United States and China's Northeast built railways of a total length of 20,000 kilometers over similarly frozen territory. These railways are, however, in high-latitude zones, where the frozen earth is stable. The Qinghai-Tibet Railway traverses a low-latitude zone, where the frozen earth is unstable owing to strong sunshine and a relatively high earth temperature. The railway presents, therefore, an engineering and ecological challenge of proportions no other country has ever had to face.

Zhang Luxin, aged 55, is leader of a group of experts from the Qinghai-Tibet Railway Construction General Headquarters, and doctorate supervisor at the Cold and Arid Area Environment and Engineering Research Institute of the Chinese Academy of Sciences (CAS). He began working at the CAS Institute of Glaciology and Cryopedology, famous for its research on the frozen earth along the Qinghai-Tibet Railway, in his early 20s. As from 1974, Zhang Luxin spent four years trekking the 560-kilometer-long frozen earth zone on the Qinghai-Tibet Plateau, gathering first-hand data.

According to Zhang Luxin, frozen earth penetrates three to five meters below the earth's surface, where it is even harder than the surface earth. Beneath the frozen earth is permafrost, and on top of it is a seasonally thawing layer. These three layers form a kind of sandwich, with frozen earth as the filling. The frozen earth closest to the seasonally thawing layer is largely ice. In certain areas it is exclusively ice, and therefore sensitive to temperature changes in the seasonally thawing layer. It is thus clear that the seasonally thawing layer is of vital importance to preservation of the frozen earth on which the Qinghai-Tibet Railway is to be built.

"The seasonally thawing layer is like a quilt over the frozen earth," said Zhang Luxin. "It stops hot air from the earth's surface filtering down to the frozen earth layer, preventing it from thawing and subsiding. The core of the problem is maintaining frozen earth heat stability. Protecting the seasonally thawing layer is, in a sense, a means of conserving the frozen earth."

Reducing the amount of heat descending from the earth's surface, thereby increasing reserves of frozen earth, is the ultimate aim of Zhang Luxin and his fellow scientists. In order to adapt to various frozen earth characteristics, different forms of roadbed have been adopted, such as the slab-stone ventilation roadbed, pipe ventilation roadbed, a sun-shaded roadbed, and a bridge-style road. The method most widely applied on the Qinghai-Tibet Railway is the slab-stone ventilation roadbed, Zhang Luxin's own invention.

One summer during the 1990s, Zhang Luxin and five doctorate students went out on the Qinghai-Tibet Plateau to collect slab-stones. They transported the stones to a 15-meter-long experimental roadbed, and piled them up to form a one-meter-deep slab-stone layer. On top of this they laid earth, sleepers, and rails, and thermometers were inserted in the crevices between the slab-stones, to test their effect and influence on the frozen earth.

Why use slab-stones rather than gravel? According to Zhang Luxin, slab-stones are better than gravel at diffusing heat, and a one-meter-thick slab-stone layer keeps the rail a safe distance from the frozen earth. In warm seasons, the heat that descends and passes through crevices between the slab-stones dissipates more readily. In cold seasons, the crevices accelerate the flow of cold air down, thus preserving the frozen earth. This invention constitutes a major contribution by a Chinese scientist to cryopedological research.

Building a roadbed is most difficult across unstable frozen earth zone -- a problem that has long perplexed scientists. Conditions in this zone inspired Zhang Luxin to invent his bridge-style railroad. This is a concept arising from the perspective of global warming in the coming decades that will make the frozen earth zone even more unstable. Zhang Luxin said, "Trains can travel over this 'bridge' as the pile foundation rests directly on permafrost, making it much easier to build a reliable roadbed." Beams used for the bridge, made by the No. 12 China Railway Engineering Bureau's Beam Factory, cost 200 million yuan (US$24.19 billion). "It is incredible," said Zhang Luxin, "that just a few decades ago, it would have been impossible for a country lacking economic strength to undertake such a mammoth project."

In order to accomplish the experimental task of constructing the Qinghai-Tibet Railway more effectively, in 1997 the No. 1 Prospecting and Designing Institute under the Ministry of Railways, the Northwest China Academy of Sciences, the Beifang Communications University, the Shijiazhuang Railway Institute, and the Lanzhou Railway Institute chose Qingshuihe, which has frozen earth with a high ice content, as the experimental site for the roadbed, bridge and culvert. Experts experimented with different forms of roadbed along this 400-meter-long experimental site, and tested temperature changes on the various layers beneath the roadbeds.

The materials used in construction also aroused public interest. The PVC pipe used for pipe ventilation is a new application, and as PVC is a familiar, widely used material, its use avoids the cost of formulating new materials.

Protecting Plateau Wildlife

Unique flora and endangered fauna, such as the Tibetan antelope, have their habitat within the harsh Qinghai-Tibet Plateau environment. Construction of the railway will inevitably affect their living environment, but scientists have tried their best to keep this impact to a minimum.

Ran Li, chief engineer of the No. 1 Prospecting and Designing Institute of the Ministry of Railways, also in charge of prospecting and designing the project, participated in compiling and editing the environmental impact evaluation report, a prerequisite for construction of the Qinghai-Tibet Railway. According to Ran Li, hundreds of millions of yuan are to be invested in environmental protection when laying the railway -- a precedent in the history of Chinese railway construction.

The Qinghai-Tibet Railway traverses Hoh Xil, known as "no-man's land" and a wildlife paradise. Each year, animals migrate here to mate, and with this in mind, engineers designed a bridge-like safety channel at the Wudaoliang Basin, spreading animal dung over it to encourage wild animals to pass through. Trains crossing this zone are prohibited from blowing their whistles.

Railway construction at the source of the three rivers (the Yangtze, Yellow and Lancang rivers) will use drilling machines without slurry to avoid polluting the river source.

There are 20,000 builders on the construction site along the railway who generate 5 tons of garbage daily. After six years, this garbage will amount to 7,000 tons. Each type must be dealt with separately. Degradable garbage that does not pollute water is buried on the spot, while daily sewage is sprinkled about to let it evaporate.

There will, however, be pollution problems of this kind to be faced after the railway opens. One train can carry over 1,000 passengers, and the handling of daily-life garbage along the line is a problem that must be resolved.

According to experts, the new train carriages will be enclosed, and opening their doors and windows will be prohibited, as will throwing out garbage along the railway line. Water-polluting garbage will be transported to Golmud or Lhasa for treatment.

Environmental protection requirements during construction of the Qinghai-Tibet Railway are of the highest level ever in the Chinese history of railway construction. In Premier Zhu Rongji's words, the time limit may be extended, but expansion of the construction site is not permitted. Every inch of green area must be protected.

Regarding Tibet's ecology, another salient point of view has been aired. According to certain experts, construction of the Qinghai-Tibet Railway will not, in the long-term, damage the environment, but rather promote its protection. This is because, as Tibet is short of coal resources, averaging 6 kilograms per capita, the cost of transporting coal on the Qinghai-Tibet Highway is enormous. The high price of coal causes an irrational structure of energy consumption. The main fuels used for daily life in agricultural and pastoral areas are wood and animal dung, but in Northern Tibet, local inhabitants cut down pine trees that grow on the plateau slopes, and that need decades to mature, for fuel. Cutting down trees further damages the already fragile ecological environment. On completion of the Qinghai-Tibet Railway, coal and petroleum can be transported into Tibet by train. This will favorably alter Tibet's structure of energy consumption, stop tree-felling, and thus protect the ecology.

Benefits Brought by the Railway

The Tibetan people have shown great enthusiasm for the Qinghai-Tibet Railway, and will benefit greatly from it. Losang Gyaincain, mayor of Lhasa City, said, "The Qinghai-Tibet Highway put an end to Tibet's complete isolation, and construction of the Qinghai-Tibet Railway will bring Tibet into modern civilization, enabling its development to be realized in leaps and bounds. The old adage, 'It is easier to go abroad than enter Tibet' will soon be a myth."

Zhang Wansheng, director of the Tourism Administration of Tibet Autonomous Region, was visibly excited when talking about construction of the Qinghai-Tibet Railway. He said that the railway opens another new route for tours of Tibet, which is now one of the most popular tourist destinations in the world. At present, the main means of transportation to and from Tibet is by air, which is of limited capacity and high cost. The Qinghai-Tibet Railway will provide a much cheaper means of transportation, and passengers can enjoy the scenery along the way, as they gradually adapt to the plateau climate and altitude. It is certain that construction of the railway will bring considerable benefits to Tibet's tourism industry.

Experts point out that the railway has epoch-making significance in promoting economic development in Tibet. It will accelerate the blending of Tibet's plateau economy with that of the interior, and promote Tibet's products on the national and world markets. Tibet's mining, green drinks, medicine, agricultural and livestock products and ethnic handicrafts will all benefit from the Qinghai-Tibet Railway.

The railway will also enhance development of the Qaidam Basin in Qinghai Province. It has already prompted the construction and development of large and medium-sized projects, such as the Qinghai Potash Fertilizer Plant, the Xitieshan Lead-Zinc Mine, the Qinghai Aluminum Plant, the Qinghai Oilfield, the Golmud Refinery, the Mangya Asbestos Mine, the Longyangxia Hydropower Station, and the Lijiaxia Hydropower Station. More than 85 percent of materials going to Tibet needs to be transported via Golmud, so the Qinghai-Tibet Railway will greatly improve both Qinghai's and Tibet's comprehensive transport capability, upgrading their overall transportation facilities and investment environment.

(China Today November Issue)
 
Last edited:
.
Tibet Railway Construction

Tibet Railway has been constructed in different time periods separately. The section from Xining to Golmud has been completed in 1979 and put into use in 1984. The section from Golmud to Lhasa has gone into service on July 1st, 2006. One of its three branches, Lhasa- Shigatse Railway has been put into operation on August 15th, 2014; it is planned that by 2020, this branch will be extended for another 336 miles (540 kilometers) from Shigatse to Gyirong port, the border of China and Nepal. The other two branches, Lhasa- Nyingchi and Shigatse-Yadong Railways are also scheduled to be opened by 2020.

icon-title.png
Construction Challenges


As the railroad traverses through world’s highest plateau (Qinghai-Tibet Plateau) and many other complicated landforms, lots of challenges and difficulties have been encountered during its construction work, including three major ones: permafrost, a fragile ecological environment, and lack of oxygen.

Permafrost - a mixture of soil and ice under 32 F (0C) - expands in winter and contracts in summer. As the railroad is built upon this kind of soil, the bed sinks very easily. Different measures have been taken to overcome this in differing sections accordingly- permafrost areas has been avoided if possible, bridges built to replace the railroad bed descending and ascending valley contours, and some new materials like heat transfer prevention planks have been used to guarantee the stability of the railroad bed on the perennial frozen soil.

As the Qinghai-Tibet Plateau is the cradle of many rivers and home to lots of rare wild animals, protection of local fragile ecological environment is the second challenge during the construction work. In order to lessen the damage to the greatest extent within Hoh Xil and other nature reserves, the railroad circumvents these areas where possible, with the Flora and Fauna protected as much as possible. To guarantee the daily living and migration of the rare wild animals, 33 migration routes have been built: routes over tunnels for animals living in mountainous areas, and underground passages for animals on the flatlands. To decrease disturb to the local environment, bridges have been built above the lakes instead of on the shoreline; the number of train stations has been greatly restricted to decrease the effect to the environment, effective sewage treatment measures have been adopted in both stations and trains along the way.

The third challenge- lack of oxygen – has been a threatening to constructors’ lives. To solve this problem, 17 oxygen-making stations and many clinics have been built along the way. To ensure the safety of passengers, oxygen outlets are also equipped inside each cabin to Tibet.

Famous Projects


Reputed as “Heavenly Road”, a number of featured architectures have been built along the way for animals to live as usual and trains to run smoothly and safely. Many of them even broke the Guinness World Records. Below is a list of major ones.

Nanshankou Framing Base: Famous for advanced technologies and high framing speed, the highest framing speed it has achieved was 7,191 yards (6,575 meters) a day, roughly the same as on flatlands.

Fenghuo Mountain Tunnel:

Located in the hinterland of Tibet Plateau, 16,093 feet (4,905 meters) above sea level, it is world’s highest rail tunnel. In addition, the whole tunnel, measuring 1,463 yards (1,338 meters) long, goes through permafrost area. It took over 300 engineers and workers about one year to complete it.

tibet-railway-project.jpg

Fenghuo Mountain

Tangula Railway Station: With an altitude of 16,627 feet (5,068 meters), this is the world’s highest train station. To make the permafrost under the station stable, the tracks have been built on the unique rubble ventilation embankment.

Kunlun Mountain Tunnel: Measuring 1,844 yards (1,686 meters) long, this is world’s longest tunnel through plateau permafrost areas. The procedures of building it are one time more than on plains, due to the low temperature and thin oxygen.

Qingshui River Bridge: Traveling through the depopulated Hoh Xil, the bridge was built to replace railroad bed, so animals can migrate as before via bridge openings. There are over 1,300 openings under this 11.7-kilometer-long (7.3 miles) bridge.

Sanchahe Bridge: Passing above a deep valley, the bridge is as high as 177.5 feet (54.1 meters). It is supported by 20 piers and 17 of them are hollow and round, with the top only 11.8 inches (30 centimeters) thick. It has been a grand site along the way.

Yangtze River Origin Bridge: It is built in Tuotuo River basin, the talik area of permafrost and the origin of the Yangtze River. To protect local environment, the drilling mud has been sank into the river bed again rather than threw into the river directly; the building rubbish were moved to designated site to be disposed.

10017310tm.jpg

Yangtze River Origin Bridge

Lhasa River Bridge: This is the final large bridge built for the railroad. Its main piers resemble yak legs and side piers snow lotuses, representative animal and plant of Tibet respectively. The three large arches are like three giant white Hada (a piece of silk used to welcome guests by Tibetan and Mongolian people), welcoming passengers. This bridge has nowadays been one of the landmarks in Lhasa and many tourists to the city will come and visit it.

Tibet Railway Construction: Challenges, Major Projects





The Qinghai-Tibet Railway: An Engineering Miracle

cbfc173db1217304e597d6fd540301e3_large.jpeg


railway.jpg


1-12101F95643463.jpg


20071191936251717690594.JPG


1-12110511130Db.jpg


When railway construction workers first came to the Qinghai-Tibet Plateau, they were amazed at the majesty of its snowfield scenery. Cut off from the outside world, everything on the plateau -- its snow-capped mountains, grassland, lamas, prayer banners, the Potala Palace, and the Tibetan people living 4,000 meters or more above sea level, has an aura of mystery.

Beautiful it may be, but Tibet lags behind other areas of China. Inadequate transportation facilities restrict its economic development, as it is only accessible by highway or air transportation. This is, to a certain extent, attributable to the harsh climate and geographical environment on the plateau, but it is obvious that if Tibet is to develop and catch up with other areas of China, it must have a railway.

With this in mind, the Ministry of Railways invited experts from the Chinese Academy of Sciences, the State Seismological Bureau, the Ministry of Communications, and the Chinese Academy of Geology, to discuss the feasibility of constructing the Qinghai-Tibet Railway.

In 2000, a report on constructing the Qinghai-Tibet Railway was passed to President Jiang Zemin by the Minister of Railways, Fu Zhenhuan.

President Jiang Zemin responded with three full pages of written instructions. He pointed out that construction of the Qinghai-Tibet Railway would benefit the development of Tibet's communications and tourism, and promote economic and cultural exchanges between Tibet and the interior. He said that this decision must be taken and expedited as China enters the new century.

On June 29, 2001, construction of the Qinghai-Tibet Railway started at Golmud, Qinghai Province. The railway will traverse the Hoh Xil "no-man's land," cross the Kunlun Mountain Pass (4,767 meters above sea level), to enter the Northern Tibet Plateau, and then go on to Lhasa, capital of Tibet Autonomous Region. Out of the 1,142 kilometers of railway, 960 kilometers are more than 4,000 meters above sea level and 550 kilometers are in areas of frozen earth. Thirty railway stations are to be built, among them Tangula Mountain station, which will be the highest-altitude railway station in the world. When the railway is complete, it will be possible to travel from Lhasa to Beijing in just 48 hours.

Construction of the Qinghai-Tibet Railway will take six years, at a total investment of 26.2 billion yuan (US$3.17 billion). There are unparalleled difficulties to address regarding terrain and environmental protection in this project. Its construction has consequently attracted worldwide attention, and been compared in magnitude to that of the Great Wall.

Building the highest-altitude ever railway to traverse the frozen earth zone is a first in the history of railway construction. It is testimony to the development of science and technology in China, and constitutes a scientific record of Chinese exploration on the Qinghai-Tibet Plateau.

Overcoming the Hidden Perils of Frozen Earth

Scientists originally planned four possible railways to Tibet: the Qinghai-Tibet Railway, the Sichuan-Tibet Railway, the Yunnan-Tibet Railway, and the Xinjiang-Tibet Railway. They settled on the Qinghai-Tibet Railway because, apart from the frozen earth aspect, it is much the best choice of the four as regards avoiding avalanches, desert, and marshland. It is nevertheless a project hitherto unequaled in engineering cost, project duration, and transportation capacity.

Building a railway over areas of frozen earth is a feat seldom attempted. A century ago, Russia built a railway on the frozen earth zone in Siberia, near the North Pole. Later, Canada, the United States and China's Northeast built railways of a total length of 20,000 kilometers over similarly frozen territory. These railways are, however, in high-latitude zones, where the frozen earth is stable. The Qinghai-Tibet Railway traverses a low-latitude zone, where the frozen earth is unstable owing to strong sunshine and a relatively high earth temperature. The railway presents, therefore, an engineering and ecological challenge of proportions no other country has ever had to face.

Zhang Luxin, aged 55, is leader of a group of experts from the Qinghai-Tibet Railway Construction General Headquarters, and doctorate supervisor at the Cold and Arid Area Environment and Engineering Research Institute of the Chinese Academy of Sciences (CAS). He began working at the CAS Institute of Glaciology and Cryopedology, famous for its research on the frozen earth along the Qinghai-Tibet Railway, in his early 20s. As from 1974, Zhang Luxin spent four years trekking the 560-kilometer-long frozen earth zone on the Qinghai-Tibet Plateau, gathering first-hand data.

According to Zhang Luxin, frozen earth penetrates three to five meters below the earth's surface, where it is even harder than the surface earth. Beneath the frozen earth is permafrost, and on top of it is a seasonally thawing layer. These three layers form a kind of sandwich, with frozen earth as the filling. The frozen earth closest to the seasonally thawing layer is largely ice. In certain areas it is exclusively ice, and therefore sensitive to temperature changes in the seasonally thawing layer. It is thus clear that the seasonally thawing layer is of vital importance to preservation of the frozen earth on which the Qinghai-Tibet Railway is to be built.

"The seasonally thawing layer is like a quilt over the frozen earth," said Zhang Luxin. "It stops hot air from the earth's surface filtering down to the frozen earth layer, preventing it from thawing and subsiding. The core of the problem is maintaining frozen earth heat stability. Protecting the seasonally thawing layer is, in a sense, a means of conserving the frozen earth."

Reducing the amount of heat descending from the earth's surface, thereby increasing reserves of frozen earth, is the ultimate aim of Zhang Luxin and his fellow scientists. In order to adapt to various frozen earth characteristics, different forms of roadbed have been adopted, such as the slab-stone ventilation roadbed, pipe ventilation roadbed, a sun-shaded roadbed, and a bridge-style road. The method most widely applied on the Qinghai-Tibet Railway is the slab-stone ventilation roadbed, Zhang Luxin's own invention.

One summer during the 1990s, Zhang Luxin and five doctorate students went out on the Qinghai-Tibet Plateau to collect slab-stones. They transported the stones to a 15-meter-long experimental roadbed, and piled them up to form a one-meter-deep slab-stone layer. On top of this they laid earth, sleepers, and rails, and thermometers were inserted in the crevices between the slab-stones, to test their effect and influence on the frozen earth.

Why use slab-stones rather than gravel? According to Zhang Luxin, slab-stones are better than gravel at diffusing heat, and a one-meter-thick slab-stone layer keeps the rail a safe distance from the frozen earth. In warm seasons, the heat that descends and passes through crevices between the slab-stones dissipates more readily. In cold seasons, the crevices accelerate the flow of cold air down, thus preserving the frozen earth. This invention constitutes a major contribution by a Chinese scientist to cryopedological research.

Building a roadbed is most difficult across unstable frozen earth zone -- a problem that has long perplexed scientists. Conditions in this zone inspired Zhang Luxin to invent his bridge-style railroad. This is a concept arising from the perspective of global warming in the coming decades that will make the frozen earth zone even more unstable. Zhang Luxin said, "Trains can travel over this 'bridge' as the pile foundation rests directly on permafrost, making it much easier to build a reliable roadbed." Beams used for the bridge, made by the No. 12 China Railway Engineering Bureau's Beam Factory, cost 200 million yuan (US$24.19 billion). "It is incredible," said Zhang Luxin, "that just a few decades ago, it would have been impossible for a country lacking economic strength to undertake such a mammoth project."

In order to accomplish the experimental task of constructing the Qinghai-Tibet Railway more effectively, in 1997 the No. 1 Prospecting and Designing Institute under the Ministry of Railways, the Northwest China Academy of Sciences, the Beifang Communications University, the Shijiazhuang Railway Institute, and the Lanzhou Railway Institute chose Qingshuihe, which has frozen earth with a high ice content, as the experimental site for the roadbed, bridge and culvert. Experts experimented with different forms of roadbed along this 400-meter-long experimental site, and tested temperature changes on the various layers beneath the roadbeds.

The materials used in construction also aroused public interest. The PVC pipe used for pipe ventilation is a new application, and as PVC is a familiar, widely used material, its use avoids the cost of formulating new materials.

Protecting Plateau Wildlife

Unique flora and endangered fauna, such as the Tibetan antelope, have their habitat within the harsh Qinghai-Tibet Plateau environment. Construction of the railway will inevitably affect their living environment, but scientists have tried their best to keep this impact to a minimum.

Ran Li, chief engineer of the No. 1 Prospecting and Designing Institute of the Ministry of Railways, also in charge of prospecting and designing the project, participated in compiling and editing the environmental impact evaluation report, a prerequisite for construction of the Qinghai-Tibet Railway. According to Ran Li, hundreds of millions of yuan are to be invested in environmental protection when laying the railway -- a precedent in the history of Chinese railway construction.

The Qinghai-Tibet Railway traverses Hoh Xil, known as "no-man's land" and a wildlife paradise. Each year, animals migrate here to mate, and with this in mind, engineers designed a bridge-like safety channel at the Wudaoliang Basin, spreading animal dung over it to encourage wild animals to pass through. Trains crossing this zone are prohibited from blowing their whistles.

Railway construction at the source of the three rivers (the Yangtze, Yellow and Lancang rivers) will use drilling machines without slurry to avoid polluting the river source.

There are 20,000 builders on the construction site along the railway who generate 5 tons of garbage daily. After six years, this garbage will amount to 7,000 tons. Each type must be dealt with separately. Degradable garbage that does not pollute water is buried on the spot, while daily sewage is sprinkled about to let it evaporate.

There will, however, be pollution problems of this kind to be faced after the railway opens. One train can carry over 1,000 passengers, and the handling of daily-life garbage along the line is a problem that must be resolved.

According to experts, the new train carriages will be enclosed, and opening their doors and windows will be prohibited, as will throwing out garbage along the railway line. Water-polluting garbage will be transported to Golmud or Lhasa for treatment.

Environmental protection requirements during construction of the Qinghai-Tibet Railway are of the highest level ever in the Chinese history of railway construction. In Premier Zhu Rongji's words, the time limit may be extended, but expansion of the construction site is not permitted. Every inch of green area must be protected.

Regarding Tibet's ecology, another salient point of view has been aired. According to certain experts, construction of the Qinghai-Tibet Railway will not, in the long-term, damage the environment, but rather promote its protection. This is because, as Tibet is short of coal resources, averaging 6 kilograms per capita, the cost of transporting coal on the Qinghai-Tibet Highway is enormous. The high price of coal causes an irrational structure of energy consumption. The main fuels used for daily life in agricultural and pastoral areas are wood and animal dung, but in Northern Tibet, local inhabitants cut down pine trees that grow on the plateau slopes, and that need decades to mature, for fuel. Cutting down trees further damages the already fragile ecological environment. On completion of the Qinghai-Tibet Railway, coal and petroleum can be transported into Tibet by train. This will favorably alter Tibet's structure of energy consumption, stop tree-felling, and thus protect the ecology.

Benefits Brought by the Railway

The Tibetan people have shown great enthusiasm for the Qinghai-Tibet Railway, and will benefit greatly from it. Losang Gyaincain, mayor of Lhasa City, said, "The Qinghai-Tibet Highway put an end to Tibet's complete isolation, and construction of the Qinghai-Tibet Railway will bring Tibet into modern civilization, enabling its development to be realized in leaps and bounds. The old adage, 'It is easier to go abroad than enter Tibet' will soon be a myth."

Zhang Wansheng, director of the Tourism Administration of Tibet Autonomous Region, was visibly excited when talking about construction of the Qinghai-Tibet Railway. He said that the railway opens another new route for tours of Tibet, which is now one of the most popular tourist destinations in the world. At present, the main means of transportation to and from Tibet is by air, which is of limited capacity and high cost. The Qinghai-Tibet Railway will provide a much cheaper means of transportation, and passengers can enjoy the scenery along the way, as they gradually adapt to the plateau climate and altitude. It is certain that construction of the railway will bring considerable benefits to Tibet's tourism industry.

Experts point out that the railway has epoch-making significance in promoting economic development in Tibet. It will accelerate the blending of Tibet's plateau economy with that of the interior, and promote Tibet's products on the national and world markets. Tibet's mining, green drinks, medicine, agricultural and livestock products and ethnic handicrafts will all benefit from the Qinghai-Tibet Railway.

The railway will also enhance development of the Qaidam Basin in Qinghai Province. It has already prompted the construction and development of large and medium-sized projects, such as the Qinghai Potash Fertilizer Plant, the Xitieshan Lead-Zinc Mine, the Qinghai Aluminum Plant, the Qinghai Oilfield, the Golmud Refinery, the Mangya Asbestos Mine, the Longyangxia Hydropower Station, and the Lijiaxia Hydropower Station. More than 85 percent of materials going to Tibet needs to be transported via Golmud, so the Qinghai-Tibet Railway will greatly improve both Qinghai's and Tibet's comprehensive transport capability, upgrading their overall transportation facilities and investment environment.

(China Today November Issue)
https://defence.pk/threads/chinese-hsr-news-and-information:original-translations.363685/page-44
Sichuan-Tibet Railway starts exploration on 28th June
20150630073944566.jpg
20150630074105519.jpg
20150630074008106.jpg
20150630073910491.jpg
20150630074024676.jpg
 
. .

Another 900,000 Tibetans have clean water since 2011

LHASA, Sept. 13 (Xinhua) -- New water conservation projects in Tibet have made clean water available to over 900,000 local people since 2011 thanks to surging investment into the southwest China region.


The Ministry of Water Resources said on Sunday the government intensified effort during 2011 to 2015 to solve water shortage in Tibet, with around 750,000 rural dwellers and 150,000 urban residents benefited and fresh water channeled to more than 1,400 temples.

The results are attributable to the central government's investment on water conservation, which is expected to reach 22.8 billion yuan (around 3.5 billion U.S. dollars) at the end of the year, over triple the amount during 2006 to 2010.

Besides water supply, the projects generate electricity for local residents, control water and soil loss and help protect the environment.

The ministry promised more efforts to guarantee fresh water, protect natural resources and improve people's livelihood in the next five years.

Another 900,000 Tibetans have clean water since 2011
- Xinhua | English.news.cn
 
. . .
Why is Tibet much richer than India?

in 2013:

India GDP per capita 1499 USD

Tibet: 4630 USD

From Income in India which has an easier to read picture List of Indian states by GDP

according to the data, the richest state in India is Delhi and its GDP per capita is around $3000.

For Indian Himalayan states which are near Tibet, the GDP per capita are just hundreds of dollar.

***

"Tibet is the among the poorest province in China in terms of GPD per capita. But even that figure has been uphold artificially through external effort. Majority of Tibet's 3 million residents (0.2% of China's population) are devoted buddhist, who spend majority of their time praying and pilgrimage and generate little economic output. To mitigate this problem, the CPC has ordered all other province to spend 0.1% of their GDP to assist Tibet every year. This amounts to huge amount of money flowing into Tibet every year. Those money are mostly spent on infrastructure and education.

In Tibet, the education is free from kinder-garden all the way to the University level. On average each resident in Tibet receive additional subsidy of 6000 US dollar per year from the national budget. The average salaries in Tibet is one of the highest in all of Chinese provinces. With China getting richer day by day, huge amount of investment and wealth are pouring into the area. So the gap between Tibet and India is only going to become wider in the near future."
 
.
india spend too much on their military hoping to achieve domination of her neighbours with guns. They should spend more on refining their democracy, nourishing their children, providing basic healthcare for the Dalits.

Spending on military and space exploration is useless for them because there isn't anything new that they bring to science.
 
.
Why is Tibet much richer than India?

in 2013:

India GDP per capita 1499 USD

Tibet: 4630 USD

From Income in India which has an easier to read picture List of Indian states by GDP

according to the data, the richest state in India is Delhi and its GDP per capita is around $3000.

For Indian Himalayan states which are near Tibet, the GDP per capita are just hundreds of dollar.

***

"Tibet is the among the poorest province in China in terms of GPD per capita. But even that figure has been uphold artificially through external effort. Majority of Tibet's 3 million residents (0.2% of China's population) are devoted buddhist, who spend majority of their time praying and pilgrimage and generate little economic output. To mitigate this problem, the CPC has ordered all other province to spend 0.1% of their GDP to assist Tibet every year. This amounts to huge amount of money flowing into Tibet every year. Those money are mostly spent on infrastructure and education.

In Tibet, the education is free from kinder-garden all the way to the University level. On average each resident in Tibet receive additional subsidy of 6000 US dollar per year from the national budget. The average salaries in Tibet is one of the highest in all of Chinese provinces. With China getting richer day by day, huge amount of investment and wealth are pouring into the area. So the gap between Tibet and India is only going to become wider in the near future."
Special aid from central GOV,one yuan invetsment 9jiao from central gov.The investment is deficit now, But profitful for long blue plan.
 
. .
With new investment and infrastructure development, China's Tibet is poised to further outpace India as a whole.

Now it is time to look forward, rather than watching the rear mirror.
 
.
Why is Tibet much richer than India?

in 2013:

India GDP per capita 1499 USD

Tibet: 4630 USD

From Income in India which has an easier to read picture List of Indian states by GDP

according to the data, the richest state in India is Delhi and its GDP per capita is around $3000.

For Indian Himalayan states which are near Tibet, the GDP per capita are just hundreds of dollar.

***

"Tibet is the among the poorest province in China in terms of GPD per capita. But even that figure has been uphold artificially through external effort. Majority of Tibet's 3 million residents (0.2% of China's population) are devoted buddhist, who spend majority of their time praying and pilgrimage and generate little economic output. To mitigate this problem, the CPC has ordered all other province to spend 0.1% of their GDP to assist Tibet every year. This amounts to huge amount of money flowing into Tibet every year. Those money are mostly spent on infrastructure and education.

In Tibet, the education is free from kinder-garden all the way to the University level. On average each resident in Tibet receive additional subsidy of 6000 US dollar per year from the national budget. The average salaries in Tibet is one of the highest in all of Chinese provinces. With China getting richer day by day, huge amount of investment and wealth are pouring into the area. So the gap between Tibet and India is only going to become wider in the near future."

I'm confident the money spent on Tibetans will pay off in the future. Those monks should really try to contribute to the economy somehow. What's the point in praying all day. Buddha also said that "A lazy person cannot contribute to society and will not produce good karma for the next life."
 
.
I'm confident the money spent on Tibetans will pay off in the future. Those monks should really try to contribute to the economy somehow. What's the point in praying all day. Buddha also said that "A lazy person cannot contribute to society and will not produce good karma for the next life."

Old traditions are hard to change, or even slightly alter.

But, with the opening up to (China's) West, and especially increased domestic mobility thanks to advanced and affordable transportation and facilities, the local culture will slowly change and embrace the competitive and success-oriented spirit of the nation's mainstream.
 
.
I noticed that the per Capita list has India controlled Southern Tibet as one of the poorest provinces next to Bihar. indian government most likely keeping that province poor because the people there do not look anything like the brown negroids.
India gov need to consider the millitery about the geography for the north state.To against china potential invase,India dont want to develop the infrastracture.I dont think its a good idea,and its a short views.
 
.

Latest posts

Country Latest Posts

Back
Top Bottom