Secret Service
SENIOR MEMBER
- Joined
- Feb 11, 2011
- Messages
- 3,117
- Reaction score
- -1
- Country
- Location
a must watch..
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
the same video is posted above on the same page do you even look at thread?
Amazing..Karakoram Highway
I have a basic question in which I hope an esteemed knowledgeable member can answer. When a company decides to conduct a pre-feasibility study on a hydro dam project, what type of work do they focus mainly in their report? What is the main difference between a pre-feasibility study and the full feasibility study on a project.
New Recruit
@Muhammad Omar i know this isn't appropriate place to ask but i wanted to show you this,
Auto Policy 2015-18 Pakistan Finally Ready For The Approval - PakWheels Blog
do you've any more details about this? or anything
Iran-Pakistan pipeline project: construction bids
01.10.15
Chinese state firm China Petroleum Pipelines Bureau (CPP) is set to be awarded the contract to build the US$2.5 billion Gwadar liquefied natural gas (LNG) and the Iran-Pakistan gas pipeline in November.
Interstate Gas Systems (ISGS), who opened the technical bid for the construction of projects, announced the news yesterday.
Mubeen Saulat, ISGS Managing Director, said that CPP has submitted technical and commercial bids in accordance with the Public Procurement Regulatory Authority (PPRA) rules.
CPP will build the 700 km long Gwadar to Nawabshah pipeline.
It will also construct the terminal with a capacity to handle 500 million ft3/d of LNG and a floating storage gasification unit.
The long-awaited IP pipeline
The pipeline and terminal will pave the way for executing the Iran-Pakistan (IP) gas pipeline project.
“This is a significant development that shows Pakistan is serious about kicking off work on the IP pipeline, but its implementation hinges on lifting of global sanctions against Iran,” said Saulat.