Devil Soul
ELITE MEMBER
- Joined
- Jun 28, 2010
- Messages
- 22,931
- Reaction score
- 45
- Country
- Location
The COAS inspected a part of road network being constructed by the FWO as part of the CPEC.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
I am anxiously waiting for M4 to be operaitonal , it is pain in the *** to travel on the bloody highway from Multan to Faisalabad . Could you tell when this would be operational ?Sir g M1 is completed it's been quiet time now.... M1 Peshawar to Islamabad (completed and Running) M-2 Islamabad to Lahore (Completed Running) M-3 Islamabad to Faisalabad and Lahore to Faisalabad there's an Interchange on M-2 from where M-3 Starts M-4 Faisalabad to Multan It's under construction But operational till Gojra Gohra Shorkot major work has been done on it.... Multan-Khanewal section is 70-75 done with carpeting in process.... M-8 Hyderabad to Karachi under Rehabilitation process .....
The only work which is now being done on M1 is to connect it with E-35
I am anxiously waiting for M4 to be operaitonal , it is pain in the *** to travel on the bloody highway from Multan to Faisalabad . Could you tell when this would be operational ?
LOLZ. It seems as if an invasion plan is being discussed but in reality, it is only a freaking road. LOLZ.
LOLZ. It seems as if an invasion plan is being discussed but in reality, it is only a freaking road. LOLZ.
Look at their faces. They are pretending as if they planning to invade Russia or something.View attachment 242333 ???
he is getting Briefed that all who's talking about invasion? how would one get briefed if it's not like this can you tell me
Look at their faces. They are pretending as if they planning to invade Russia or something.
What can be said about our country where civilians cannot build a road and the military can only build a road instead of defending the country.
isnt it quite slow ?Well Construction of M-4 From Faisalabad till Gojra is Completed and Operational... Construction of Gojra To Shorkot part will start this year and till Multan it'll be completed till 2018 Insha Allah
isnt it quite slow ?