China Pakistan Economic Corridor (CPEC) | Power Plants

.
1598283209626.png
 
. . .
CPEC Phase 4 should be to rebuild key cities using modern planning and technology. A complete modernisation of Karachi, Lahore and Pindi should be undertaken , Old houses knocked done and replace with modern and energy efficient housing to last the next century embedded with proper services such as health centers/hospitals, schools, colleges, universities , parks, community centers, industrial estates, bus and train stations etc. Knock it all down and rebuild.
 
.
XCMG excavators, loaders, road machinery and concrete products. They will be working on the site of Diamer Basha Dam - the "biggest dam in Pakistan's history."


1598661972607.png
 
.
Suki Kinari Hydropower Project in KPK Construction Sites in Pakistan 2020



 
. . . . .
Under Construction #KarotHydropowerProject
- 720MW on #Jhelum river under #CPEC
- Asphalt Core Rock fill dam
- Surface Powerhouse equipped with 4 x 180 MW Francis-type units
- Expected completion date: 2021-22
Civil works 90% completed

#Hydropower #Dam #Pakistan #China 🇵🇰🇨🇳

20200908_155138.jpg
20200908_155142.jpg
20200908_155145.jpg
20200908_155147.jpg
20200908_155107.jpg
20200908_155105.jpg
 
. .
Sugar robot will accelerate construction of Matiari-Lahore transmission line under CPEC.

China is ready to bring the first Artificial Intelligence (AI) technology for infrastructure projects under CPEC. Use to inspect the Matiari-Lahore power transmission project developed under Intelligent Inspection Robots CPEC Gay. Along with the debugging process, approximately 20 Intelligent Inspection Robots were completed and will be used in the Matiari-Lahore power transmission project.


1599922147751.png
 
.
720 MW Karot_Hydropower_Project – Another milestone achieved

Highway bridge in the control section of the Spillway has been completed and ready for traffic.

The highway beam of the spillway control section successfully passed the static and dynamic load test, marking that the top of the spillway control section is open to traffic. It will provide large-scale transportation and lay a solid foundation for the safe and on schedule goal for closing the gate and impounding water.