What's new

China Civil Aviation, AVIC (MA600) & COMAC (ARJ21/C919/C929)

中国商飞
今天 11:59 来自 HUAWEI Mate 10
【天骄航空接收首架ARJ21飞机】2019年2月22日,一架白色素雅涂装的ARJ21飞机从上海起飞,前往内蒙古呼和浩特白塔国际机场,这是中国商飞向天骄航空交付的首架ARJ21飞机。本次交付标志着国产喷气客机开启商业运营新征程,也意味着ARJ21飞机将以呼和浩特为基地,助力完善内蒙古支线运输网络。
COMAC
Today 11:59

[Genghis Khan Airlines receives the first ARJ21 aircraft] On February 22, 2019, a white elegant ARJ21 aircraft took off from Shanghai to the Baita International Airport in Hohhot, Inner Mongolia. This was the first ARJ21 aircraft delivered by China Commercial Aircraft to Genghis Khan Airlines. This delivery marks a new journey for commercial jet aircraft to open commercial operations. It also means that the ARJ21 aircraft will be based in Hohhot to help improve the Inner Mongolia branch-line transportation network.

005Ayu5Ygy1g0f2edi5xnj33dc28wqv8.jpg

005Ayu5Ygy1g0f2cnnfmcj30m80eswfq.jpg

005Ayu5Ygy1g0f2cmr63gj30m80esgmn.jpg
 
. .
Genghis Khan Airlines receives its first ARJ21 aircraft
中国ARJ21飞机已交付12架运送旅客逾27万人次
China COMAC has delivered 12 ARJ21 aircrafts, safely transporting more than 270,000 passengers


中国新闻网 2019-02-22 20:22:23
RIoAnl5HwEb52u

中国商飞公司交付天骄航空的首架ARJ21飞机。 管超 摄
COMAC delivered the first ARJ21 aircraft of Genghis Khan Airlines.
中新网北京2月22日电 (记者 孙自法)中国商用飞机有限责任公司(中国商飞公司)22日发布消息说,向内蒙古天骄航空交付的首架ARJ21飞机,当天从上海顺利飞抵呼和浩特白塔国际机场。至此,ARJ21飞机已交付客户12架,安全运营逾9000小时,运送旅客超过27万人次。

中国商飞公司介绍说,ARJ21飞机具有良好的高温、高寒、高原性能,特别适应中国中西部和北部地区机场起降条件和复杂航路越障要求,已交付客户12架。截至目前,ARJ21飞机安全运营超过9000小时,运送旅客超过27万人次。在平稳运行的基础上,中国商飞公司还将不断围绕客户需求开展ARJ21飞机设计优化工作,朝着“好制造、好维修、好运行”的目标,持续提升ARJ21飞机的市场竞争力。

本次交付天骄航空首架ARJ21飞机,标志着中国国产喷气客机开启了商业运营新征程,也意味着ARJ21飞机将以呼和浩特为基地,助力完善内蒙古支线运输网络。中国商飞公司表示,将全力支持天骄航空运营,同时发挥商用飞机产业龙头引领作用,以航空运输业为核心,打造相关服务产业,携手助推内蒙古地区航空产业发展,推动国产商用飞机制造业与支线航空运输业融合发展,共同探索国产喷气客机市场化、产业化发展新模式。

据了解,ARJ21新支线飞机是中国首次按照国际民航规章自行研制、具有自主知识产权的中短程新型涡扇支线客机,座级78-90座,航程2225-3700公里。ARJ21飞机于2014年底取得中国民航局型号合格证,2017年7月取得中国民航局生产许可证。目前,ARJ21飞机市场运营及销售情况良好。(完)

https://www.toutiao.com/a6660799108455858700/

W020190222601886847043.jpg
W020190222601886890060.jpg
W020190222601887027249.jpg
W020190222601887096608.jpg
W020190222601887160605.jpg
W020190222601887212535.jpg
W020190222601887266400.jpg
http://www.comac.cc/xwzx/mtjj/201902/22/t20190222_6721881.shtml
 
.
Genghis Khan Airlines receives its first ARJ21 aircraft
中国ARJ21飞机已交付12架运送旅客逾27万人次
China COMAC has delivered 12 ARJ21 aircrafts, safely transporting more than 270,000 passengers


中国新闻网 2019-02-22 20:22:23
RIoAnl5HwEb52u

中国商飞公司交付天骄航空的首架ARJ21飞机。 管超 摄
COMAC delivered the first ARJ21 aircraft of Genghis Khan Airlines.
中新网北京2月22日电 (记者 孙自法)中国商用飞机有限责任公司(中国商飞公司)22日发布消息说,向内蒙古天骄航空交付的首架ARJ21飞机,当天从上海顺利飞抵呼和浩特白塔国际机场。至此,ARJ21飞机已交付客户12架,安全运营逾9000小时,运送旅客超过27万人次。

中国商飞公司介绍说,ARJ21飞机具有良好的高温、高寒、高原性能,特别适应中国中西部和北部地区机场起降条件和复杂航路越障要求,已交付客户12架。截至目前,ARJ21飞机安全运营超过9000小时,运送旅客超过27万人次。在平稳运行的基础上,中国商飞公司还将不断围绕客户需求开展ARJ21飞机设计优化工作,朝着“好制造、好维修、好运行”的目标,持续提升ARJ21飞机的市场竞争力。

本次交付天骄航空首架ARJ21飞机,标志着中国国产喷气客机开启了商业运营新征程,也意味着ARJ21飞机将以呼和浩特为基地,助力完善内蒙古支线运输网络。中国商飞公司表示,将全力支持天骄航空运营,同时发挥商用飞机产业龙头引领作用,以航空运输业为核心,打造相关服务产业,携手助推内蒙古地区航空产业发展,推动国产商用飞机制造业与支线航空运输业融合发展,共同探索国产喷气客机市场化、产业化发展新模式。

据了解,ARJ21新支线飞机是中国首次按照国际民航规章自行研制、具有自主知识产权的中短程新型涡扇支线客机,座级78-90座,航程2225-3700公里。ARJ21飞机于2014年底取得中国民航局型号合格证,2017年7月取得中国民航局生产许可证。目前,ARJ21飞机市场运营及销售情况良好。(完)

https://www.toutiao.com/a6660799108455858700/

W020190222601886847043.jpg
W020190222601886890060.jpg
W020190222601887027249.jpg
W020190222601887096608.jpg
W020190222601887160605.jpg
W020190222601887212535.jpg
W020190222601887266400.jpg
http://www.comac.cc/xwzx/mtjj/201902/22/t20190222_6721881.shtml
It needs to hit the million passenger mark soon.
 
. .
看到伊利号就想起深圳超市里的伊利包装牛奶。:china:
Name of the first ARJ21 for Genghis Khan Airline reminds me of the packaged milk in Shenzhen's super market.
 
.
. . . . . .
More C919 prototypes ready for test flight
By Wang Ying | China Daily | Updated: 2019-02-14 07:09
f_art.gif
w_art.gif
in_art.gif
more_art.gif


5c64bc40a3106c65fff9c401.jpeg
Three C919 aircraft at the Shanghai base of Commercial Aircraft Corporation of China. [Photo by Zhang Haifeng/For China Daily]

COMAC says preparations for mass production will also be accelerated

C919 aircraft manufacturer Commercial Aircraft Corporation of China (COMAC) said that a further three prototypes of the aircraft will have their debut flights this year, and preparations for mass production of the nation's first homegrown narrow-body passenger plane will also be accelerated.

According to COMAC, three C919 aircraft are undergoing testing at the C919 assembly workshop in Shanghai's Pudong New Area-the second, third and the fourth prototypes of the C919, China Central Television reported on Wednesday.

The 102 prototype test aircraft completed its first flight in December 2017. It has recently returned to Shanghai from Dongying in Shandong province, and on Friday started two to three months of modification for a future test flight.

The 103, which had its maiden flight on Dec 28, and is undergoing flight test modification for the moment, will fly to Yanliang near Xi'an in Shaanxi province, where the Chinese Flight Test Establishment is located, for further flight tests.

"The 104 aircraft has entered the final assembly stage. The jet is about to make its first flight after rolling off the final assembly line," said Meng Jianxin, deputy director of the C919 division under Shanghai Aircraft Manufacturing Co Ltd, COMAC.

According to Meng, the 105 jet is in the process of part fabrication, and major parts of the 106 model are being manufactured in accordance with the plan.

"All of them will have flight tests by the end of this year," said Meng.

With the participation of another three new prototypes, a total of six C919 aircraft, including the 101, will be assigned different tasks to test the C919's flight performance.

"The year 2019 is key for the C919, and it is hoped that we can further optimize the flight tasks, enhance flight test efficiency, and complete all the tasks safely," said Lai Peijun, a flight test engineer with COMAC.

The aircraft's first flight only mark the beginning of their journey, and every flight made will provide technical support for a more steady flight the next time.

"There are quite a few test flight subjects that need to be accomplished before a commercial aircraft model acquires airworthiness certification, and it is necessary to split the tasks among five or six aircraft," said Lin Zhijie, an aviation industry analyst and columnist at carnoc.com, one of China's biggest civil aviation websites.

Lin said it is also an international convention for five or six aircraft to work together to complete a commercial aircraft model's flight tests. Chinanews.com reported that the C919's flight tests will include 729 items and may take as long as 4,200 hours.

The twin-engine, single-aisle C919, which is comparable with the updated Airbus 320 and Boeing's new generation 737 planes, made its maiden flight on May 5, 2017.

COMAC has received 815 orders from 28 Chinese and overseas companies, which include domestic aviation companies and financial leasing companies, as well as international companies such as GE Capital Aviation Services, the largest commercial airline leasing company in the world, German startup Puren Airlines, and City Airways of Thailand.

Before the delivery of the first C919, two key missions need to be fulfilled, to receive airworthiness certification from the US Federal Aviation Administration and the European Aviation Safety Agency, and to continuously improve its safety, reliability and economy, according to Lin.

"The former will guarantee entry to the US and European markets, and the latter is a guarantee for our homegrown aircraft to have most problems settled before its commercial flights," he said.
"The year 2019 is key for the C919, and it is hoped that we can further optimize the flight tasks, enhance flight test efficiency, and complete all the tasks safely," said Lai Peijun, a flight test engineer with COMAC.

I predict that the date of 2019.9.19, will be a date of some importance for the COMAC C919 Project. By this date, some pivotal progresses may have been achieved, at least looking forward to seeing the completion of the whole SIX testing aircraft No. 101 to 106.

Just keep a note and let's wait for that moment… :enjoy:

Can't help to see this aircraft be deployed in the commercial operations soon in China domestic. As said by @055_destroyer, just produce many and maintain the perfect 100% safety records in domestic use freeing itself from all the foreign certification hurdles for a while. The real-life factuality in plenty will make the C919 much harder to deny by the usual alien sides!
 
.
COMAC to ramp up ARJ21 production, open second assembly line (26 Feb)

COMAC will open a second assembly line for its ARJ21 regional jet this year, as it prepares to ramp up production of the type.

The Chinese manufacturer is targeting to produce 22 regional jets to customers this year, up from 15 in 2018, Wang Xingwei, director of the ARJ21 programme office tells FlightGlobal. In 2017, it built six aircraft.

This year, besides launch customer Chengdu Airlines, it will also deliver the regional jet to two more customers - Genghis Khan Airlines and Urumqi Airlines.

The new assembly line will be located at the COMAC final assembly centre near Shanghai’s Pudong International airport.This is also where assembly of its in-development C919 narrowbody is ongoing, and where assembly of the Sino-Russian CRAIC CR929 widebody will take place.

The ARJ21 regional jet is currently assembled at the Shanghai Aircraft Manufacturing facility in Changzhong Road.

Yuan Wenfang, general manager of production and operations support, says that the Changzhong facility can only accommodate six aircraft at any one point due to its limited space, and has an annual maximum capacity of producing 15 jets.

The new assembly line at the Pudong facility will have the capacity to assemble 30 aircraft a year. The manufacturer is also prepared to open a second line there should there be a requirement to further raise production rates.

COMAC is targeting to deliver 30 ARJ21s next year, and for delivery to stabilise at that level annually thereafter.

The manufacturer has so far garnered 528 order commitments for the type from 24 customers.

https://www.flightglobal.com/news/a...up-arj21-production-open-second-assem-456071/

~~~~~~~~~~~~

ARJ-21 has increased the second major assembly line and plans to produce 22 aircraft within 2019. COMAC made 15 aircraft in 2018.

The ARJ21 is a twin-engine regional jet, with seating capacity will range from 70 to 105 seats, up to configuration and aircraft model.

The aircraft performance parameters meet the diverse and demanding conditions in China, including the hot-and-high altitude conditions in Xinjiang and Qinghai-Tibet Plateau. The aircraft has a powerful take-off and climbing performance to allow the use of basic airports with short runways.

The ARJ21 advanced regional jet was awarded State Council approval in 2002. The final assembly began in March 2007 and the ARJ21-700 aircraft was rolled out in December 2007. The first flight took place in November 2008, and got CAAC Certification in December 2012. The ARJ21 advanced regional passenger plane welcomed its 100,000th passenger in the end of June 2018 after beginning commercial flights two years ago. It began commercial flights on June 28, 2016, with mass production starting September 2017.

ARJ21 variation models: the baseline ARJ21-700 (70~80 seats); the extended ARJ21 900 version (95~105 seats); the dedicated freight carrier ARJ21F; and the business class aircraft ARJ21B. ARJ21F has max payload capacity, 10,150 kgs. ARJ21B business jet model can accommodate 20 passengers.

The airplane has been designed to operate from small airports, the take-off and landing field lengths are 1,700 meters and 1,550 meters. The aircraft will be provided in two versions: standard range (2,225 km) and extended range (3,700 km).

It looks like the COMAC ARJ21 may be exported to Africa countries in near future, in particular when the COMAC production capacity can accommodate such orders. This aircraft should fit well some domestic and regional air transport needs of the African countries for the aircraft supports even the basic airports or airports with short runways unlike the larger aircraft. The ARJ21 is also designed with parameters to meet with the harsh environmental challenges of the China's western regions (with Xinjiang and Tibet in mind), that easily match the environmental challenges faced in Africa.
 
Last edited:
.
Getting FAA worthiness in short future is impossible. C919 shall concentrated on getting CAA and enter Chinese market in large scale first, just like ARJ-21 with a great safety record before thinking further.

Its not about C919 quality problem but more of American politics obstacle.

The market size should serve this product very well.
 
.
Back
Top Bottom