What's new

Chashma III Nuclear Power Plant

. .
Three are many areas in karachi where no load shedding is performed. One of K-electric employee revealed that those areas where recovery of electric bills is close to 100% there is no load shedding in these areas. like Gulshan, Hassan Square, Defence and others.
 
.
Last edited:
.
Seriously....? As far as my memory goes, I can't recall any power cuts during 1998-2007.
In another words you are trying to say that your nearest memory starts from 2007 onward...

Back in 90s there was famous culture in Pakistan that people used to sit outside their home, near the door and talk to neighbours due to no electricity. It used to happen every evening and children like us used to play hide and seek in the neighbourhoods running pass the families sitting in those narrow streets. The moment you stop, you would start sweating so most of the games involved a lot of running

The availability of water was so scarce that I remember people used to say that the water will be available 1 or 6 hours a day (sometimes 7am in the morning) and if there was no electricity at that time, you are doomed. Pakistan always had load shedding but it just became worse between 2008 to 2014.
 
.
In another words you are trying to say that your nearest memory starts from 2007 onward...

Back in 90s there was famous culture in Pakistan that people used to sit outside their home, near the door and talk to neighbours due to no electricity. It used to happen every evening and children like us used to play hide and seek in the neighbourhoods running pass the families sitting in those narrow streets. The moment you stop, you would start sweating so most of the games involved a lot of running

The availability of water was so scarce that I remember people used to say that the water will be available 1 or 6 hours a day (sometimes 7am in the morning) and if there was no electricity at that time, you are doomed. Pakistan always had load shedding but it just became worse between 2008 to 2014.
No. My nearest memory is 1998. And there might be some shortage but it was never like today's. Even today while there is winter, there is 10-12 hours loadshedding in my hometown in southern Punjab.
 
.
No. My nearest memory is 1998. And there might be some shortage but it was never like today's. Even today while there is winter, there is 10-12 hours loadshedding in my hometown in southern Punjab.
There was no AC back in the days, our total exports were around 2 billion dollars... and now if we are exporting goods worth 25 billion dollars, small but the industrial sector has increased manifold. The average consumption per capita of electricity in household is about 70 units, compare it to industrial sector's per capita of 4800 units...

The point is we started off with 60mw in 1947 and enjoyed surplus in the 1980s due to tarbella and mangla hydropower projects but still you could say that half of Pakistan was deprived of electricity until few years ago.

Even now in 2016 only 67% population is getting electricity... so there was never a time in Pakistan when everyone was able to get electricity
 
.
Chashma Nuclear Power Plant...

15726736_593706344163873_3862975290731953799_n.jpg
15740744_593706217497219_7316244337508121190_n.jpg
15747457_593706384163869_9019786780608802618_n.jpg
15747820_593706294163878_2138325055824330724_n.jpg
 
.
There was no AC back in the days, our total exports were around 2 billiom dollars... and now if we are exporting goods worth 25 billion dollars, small but the industrial sector has increased manifold. The average consumption per capita of electricity in household is about 70 units, compare it to industrial sector's per capita of 4800 units...

The point is we started off with 60mw in 1947 and enjoyed surplus in the 1980s due to tarbella and mangla hydropower projects but still you could say that half of Pakistan was deprived of electricity until few years ago.

Even now in 2016 only 67% population is getting electricity... so there was never a time in Pakistan when everyone was able to get electricity
Sir, I was arguing the fact that "They have just reduced to minimum since past 20 years or so." which haven't as per my experience.
 
.
Sir, I was arguing the fact that "They have just reduced to minimum since past 20 years or so." which haven't as per my experience.
May be in your town... perhaps...

But not for rest of the country..

There are still many areas which lacks electricity as they never received any connection so far... I remember during Musharraf's era there was a lot of criticism that Wapda gave 7.5 million new connections and didn't add any electricity. The point is 7.5 million connections is like 20 million people may have got electricity for the first time in their life even if it means with plenty of loadshedding.. so they are better off with loadshedding than never having a connection
 
.
May be in your town... perhaps...

But not for rest of the country..

There are still many areas which lacks electricity as they never received any connection so far... I remember during Musharraf's era there was a lot of criticism that Wapda gave 7.5 million new connections and didn't add any electricity. The point is 7.5 million connections is like 20 million people may have got electricity for the first time in their life even if it means with plenty of loadshedding.. so they are better off with loadshedding than never having a connection
I live in a metropolitian. So I know the current situation there as well. If you make 2008 the reference point then claim of less load shedding looks justified but suggesting current situation to be better than previous 20 years is......

The situation has to improve eventually with every passing government as new power plants take time. Here are the official figures. Most of the projects coming to life today were started in PPP's tenure including this one.
http://www.ntdc.com.pk/Files/power2015.pdf
1nxNQIM.png
 
Last edited:
.
There is zero loadshedding for industry for past 2 years... and it really does not matter alot if the domestic consumers continue to have few hours per day...

With chashma 4 and all the coal power coming online in 2017 2018...most metropolitans will have next to none loadshedding...

K3 and k4 shud also be coming online 2019 2020 time .. acp 1000 3rd gen reactors are more than gigawatt each...chashma 5 gen 3 2022 onwards... and we need to install atleast 10 more in acp 1000 category from 2020 onwards
 
.
Not really. Even in other areas like FB area, Gulshan, North Nazimabad etc are also not seeing much power outages. These are the most populated areas of Karachi.

Yes, that's what my folks in North Nazimabad told me about this past summer in Karachi. Karachi summers are made much worse by power outages.
 
.
Many thanks to the team, who worked to make it happen. Job well done, hope to see more!
 
.
Work on Chashma 3&4 was started in 2010 during PPP's tenure.
https://en.wikipedia.org/wiki/Chashma_Nuclear_Power_Plant#Unit_3_.26_4


Seriously....? As far as my memory goes, I can't recall any power cuts during 1998-2007.

Exactly. I was in pak till 2006, we may have had a power outage here and there once a month, but never like it is now.
And it's not PPP either, Musharraf was the one who started all this. A project of this magnitude takes years of planning and dealings (im talking about cpec as whole). We all need to thank Musharraf....sadly PML will take all the credit as it's happening during their tenure.
 
.
Back