shree835
BANNED
- Joined
- Jun 26, 2010
- Messages
- 3,005
- Reaction score
- -19
- Country
- Location
Latest French offer to revive India’s nearly dead Indigenous Kaveri gas turbine engine has reignited intense debate among Indian military planners but the final call on offer is likely will be take up by Indian MOD, while many Defence analyst are not sure if Kaveri engine can be production ready before Tejas MK-1A enters production sometime in 2020.
French have offered to invest 1 Billion Euros in Kaveri combat engine project to meet offset obligation of Rafale fighter deal which India and France are currently negotiating . Proposed upgraded Kaveri engine will be a 90kN thrust class engine which will be marginally more powerful than GE supplied F404-GE-IN20 engine which is currently generating 84kN thrust .
French officials believe that Kaveri engine is nearly 70-75 % complete and within 18-24 months it can be made into a full-fledged military grade certified combat engine ready for flight tests , but many Defence Analyst speaking to idrw.org informed us that GE’s F404 engines have served LCA-Tejas program well for last 15 years , reliability of engines have ensured nearly 3000 sorties accident free which actually saved whole LCA-Tejas from being closed down due to constant delays which plagued the program .
Indian Air Force to is quite happy with GE’s F404 engines and in past praised perfect integration with Indigenous combat jet and its test Pilots too have praised its fuel management but Kaveri engine will take the time to built reliability and confidence said another Defence Analyst .
Kaveri engine has been able to generate the thrust of only 65 KN and is still overweight by around 150 kilogrammes . French have identified problems in its core which is not letting it develop sufficient thrust to power Combat jets like LCA-Tejas and GTRE too has been working independently to fix Core problem areas but it might take nearly a 5-7 years to fix problems locally feels another Defence Analyst and French offer might only help speed up the project and instead of Kaveri powering Tejas MK-1A aircraft has second engine change at a later stage, we have bright chance to power it from the first aircraft feels another Defence Analyst.
http://idrw.org/indias-kaveri-engine-beat-reliable-f404-ge-in20-engine-power-tejas-mk-1a/
French have offered to invest 1 Billion Euros in Kaveri combat engine project to meet offset obligation of Rafale fighter deal which India and France are currently negotiating . Proposed upgraded Kaveri engine will be a 90kN thrust class engine which will be marginally more powerful than GE supplied F404-GE-IN20 engine which is currently generating 84kN thrust .
French officials believe that Kaveri engine is nearly 70-75 % complete and within 18-24 months it can be made into a full-fledged military grade certified combat engine ready for flight tests , but many Defence Analyst speaking to idrw.org informed us that GE’s F404 engines have served LCA-Tejas program well for last 15 years , reliability of engines have ensured nearly 3000 sorties accident free which actually saved whole LCA-Tejas from being closed down due to constant delays which plagued the program .
Indian Air Force to is quite happy with GE’s F404 engines and in past praised perfect integration with Indigenous combat jet and its test Pilots too have praised its fuel management but Kaveri engine will take the time to built reliability and confidence said another Defence Analyst .
Kaveri engine has been able to generate the thrust of only 65 KN and is still overweight by around 150 kilogrammes . French have identified problems in its core which is not letting it develop sufficient thrust to power Combat jets like LCA-Tejas and GTRE too has been working independently to fix Core problem areas but it might take nearly a 5-7 years to fix problems locally feels another Defence Analyst and French offer might only help speed up the project and instead of Kaveri powering Tejas MK-1A aircraft has second engine change at a later stage, we have bright chance to power it from the first aircraft feels another Defence Analyst.
http://idrw.org/indias-kaveri-engine-beat-reliable-f404-ge-in20-engine-power-tejas-mk-1a/