cloud_9
SENIOR MEMBER
- Joined
- Jul 16, 2010
- Messages
- 4,921
- Reaction score
- -2
- Country
- Location
^^^
Ok found some info
During the road travel, Dr. Pallam Raju inspected each activity of road/bridge construction on National Highways NH-13 and NH-15. After the inauguration, he also inspected the portion of trans-Arunachal Highway being constructed by the BRO and visited Paya Production Centre from where all the pavement works material is being produced. The Minister complemented BRO for the excellent work being executed comparable to the international standards despite severe constraints.
Ok found some info
Addressing the Independence Day rally after unfurling the national flag, Khandu said that out of the total length of the 1,559-km two-lane proposed highway from Tawang in the western part of the state to Kanubari in the east, the PWD would construct the 418 km stretch for which detailed project reports (DPRs) were under preparation.
The remaining Tawang-Nechipu and Pasighat-Mahadevpur sections are being developed by the Border Road Organisation.