What's new

Britain's Fighter Jets 'Grounded By Spares Shortages'

Lankan Ranger

ELITE MEMBER
Joined
Aug 9, 2009
Messages
12,550
Reaction score
0
Britain's Fighter Jets 'Grounded By Spares Shortages'

Britain's Eurofighter Typhoon jets, which carried out their first Libya bombing missions this week, were grounded last year due to shortages of spare parts, lawmakers said April 15.

The parliamentary report said five Typhoon pilots had to be grounded temporarily because there were insufficient fully operational aircraft for them to log the required flying time.

It noted that the shortages had also affected pilots' training last year, with only eight of the Royal Air Force's 48 Typhoon pilots qualified for ground attack operations - the role the plane is currently being used for in Libya.

The bombing of two tanks near the city of Misrata this week was the first time the Typhoon has fired its weapons in anger in a ground attack role since entering service with the RAF.

Defence Secretary Liam Fox insisted on April 14 that the Eurofighter project was "finally under control and on track".

But the RAF is currently having to 'cannibalize' aircraft for spare parts in a bid to keep the maximum number of Typhoons operational on any given day.

The Commons Public Accounts Committee scrutiny body said the Ministry of Defence had warned the problems were likely to continue until 2015 when it expects the supply of spares finally to have reached a "steady state".

"The department (MoD) relies on a small group of key industrial suppliers who have the technical and design capability to build, upgrade and support Typhoon," the committee said.

"Problems with the availability of spare parts have meant that Typhoons are not flying as many hours as the department requires."

It said the supply chain for Typhoon spares was "complex and stretches across Europe".

However, the department admitted that the supplies process "had not been managed well enough or delivered all the required parts when needed."

The cost of the Typhoon project has soared since its inception due to bad planning and over-optimistic targets, Britain's public sector spending watchdog said last month.

Britain's Fighter Jets 'Grounded By Spares Shortages' - Defense News
 
.
Britain's Fighter Jets 'Grounded By Spares Shortages'

Britain's Eurofighter Typhoon jets, which carried out their first Libya bombing missions this week, were grounded last year due to shortages of spare parts, lawmakers said April 15.

The parliamentary report said five Typhoon pilots had to be grounded temporarily because there were insufficient fully operational aircraft for them to log the required flying time.

It noted that the shortages had also affected pilots' training last year, with only eight of the Royal Air Force's 48 Typhoon pilots qualified for ground attack operations - the role the plane is currently being used for in Libya.

The bombing of two tanks near the city of Misrata this week was the first time the Typhoon has fired its weapons in anger in a ground attack role since entering service with the RAF.

Defence Secretary Liam Fox insisted on April 14 that the Eurofighter project was "finally under control and on track".

But the RAF is currently having to 'cannibalize' aircraft for spare parts in a bid to keep the maximum number of Typhoons operational on any given day.

The Commons Public Accounts Committee scrutiny body said the Ministry of Defence had warned the problems were likely to continue until 2015 when it expects the supply of spares finally to have reached a "steady state".

"The department (MoD) relies on a small group of key industrial suppliers who have the technical and design capability to build, upgrade and support Typhoon," the committee said.

"Problems with the availability of spare parts have meant that Typhoons are not flying as many hours as the department requires."

It said the supply chain for Typhoon spares was "complex and stretches across Europe".

However, the department admitted that the supplies process "had not been managed well enough or delivered all the required parts when needed."

The cost of the Typhoon project has soared since its inception due to bad planning and over-optimistic targets, Britain's public sector spending watchdog said last month.

Britain's Fighter Jets 'Grounded By Spares Shortages' - Defense News
Yep we are Lions led by Donkeys. Thus has it always been.
 
. .
Talk about buying F-35s and building super carriers.

Spending $60b yet can't get spares either there is deep & huge corruption or the real spending is lower.
 
.
Britain's Fighter Jets 'Grounded By Spares Shortages'

Britain's Eurofighter Typhoon jets, which carried out their first Libya bombing missions this week, were grounded last year due to shortages of spare parts, lawmakers said April 15.

The parliamentary report said five Typhoon pilots had to be grounded temporarily because there were insufficient fully operational aircraft for them to log the required flying time.

It noted that the shortages had also affected pilots' training last year, with only eight of the Royal Air Force's 48 Typhoon pilots qualified for ground attack operations - the role the plane is currently being used for in Libya.

The bombing of two tanks near the city of Misrata this week was the first time the Typhoon has fired its weapons in anger in a ground attack role since entering service with the RAF.

Defence Secretary Liam Fox insisted on April 14 that the Eurofighter project was "finally under control and on track".

But the RAF is currently having to 'cannibalize' aircraft for spare parts in a bid to keep the maximum number of Typhoons operational on any given day.

The Commons Public Accounts Committee scrutiny body said the Ministry of Defence had warned the problems were likely to continue until 2015 when it expects the supply of spares finally to have reached a "steady state".

"The department (MoD) relies on a small group of key industrial suppliers who have the technical and design capability to build, upgrade and support Typhoon," the committee said.

"Problems with the availability of spare parts have meant that Typhoons are not flying as many hours as the department requires."

It said the supply chain for Typhoon spares was "complex and stretches across Europe".

However, the department admitted that the supplies process "had not been managed well enough or delivered all the required parts when needed."

The cost of the Typhoon project has soared since its inception due to bad planning and over-optimistic targets, Britain's public sector spending watchdog said last month.

Britain's Fighter Jets 'Grounded By Spares Shortages' - Defense News
Austerity has hit the military hard.
 
.
Irrversibkle decline of the British Armed forces has started. This one will bleed them. The next time they'll try to be 'rational' and try to have limited expectations from their systems and so on till one day their force levels and capabilities will match, say, the norwegiaNS...:D
 
.

Latest posts

Back
Top Bottom