The A-5
BANNED
- Joined
- Aug 2, 2012
- Messages
- 521
- Reaction score
- 0
- Country
- Location
November 1996: Contract inked for 40 x Su-30MKI for delivery by IRKUT Corp
December 1998: Contract inked for 10 x Su-30MKI for delivery by IRKUT Corp
December 2000: Contract inked for 140 x Su-30MKI for licenced-manufacturing by HAL
2007: Contract was signed for 40 x Su-30MKI for licenced-manufacturing by HAL
December 16, 2011: Contract inked for licenced-manufacturing of 42 x Su-30MKI by HAL
December 24, 2012: Contract signed for 42 x Su-30MKIs for delivery in semi-knocked-down condition (also known as Delivery of 42 technological kits for Su-30MKI licenced-production) from IRKUT Corp
The MoD-issued press release on December 24, 2012 very clearly states: Contract for Delivery of 42 technological kits for Su-30MKI aircraft licenced-production. The Protocol-II on licenced-manufacturing of additional 42 SU-30MKI aircraft units was signed during Annual Summit 2011. The current contract is a FOLLOW-UP (& not in context) to this Protocol. One must also distinguish between licenced-production (i.e. aircraft rolling out after final assembly of kits supplied by IRKUT Corp) & licenced-manufacture (i.e. aircraft rolling out after a substantial portion of its airframe, engine & accessories were manufactured by HAL from the raw materials-stage onwards).
TOTAL Ordered So Far: 314
TOTAL Delivered So Far: 50 + 119 = 169.
TOTAL IN-SERVICE TODAY: 146, due to 3 peacetime attrition losses & since the first 20 Su-30MKIs are now grounded for undergoing their mandatory 1,000-hour depot-level inspection.
Source: TRISHUL: Nirbhay Cruise Missile Family Finally Revealed!
(comments section)
Is he right or wrong