sancho
ELITE MEMBER
- Joined
- Feb 5, 2009
- Messages
- 13,011
- Reaction score
- 27
- Country
- Location
How does he know the result of the second sub line winner??. This only says they will puch for Brahmos instalation on second line. We all know that the second line will have land attack capability and Brahmos will be installed there.
I agree and we have to keep in mind that there were reports from DCNS officials, that said Brahmos VLCs can only be added instead of the AIP propulsion, because the Scorpene can add only 1 more modul. By the fact that the first (AFAIK 3) Scorpenes won't have AIP, I doubt IN will make the same mistake again. Either they get a sub that can have both AIP and Brahmos, or AIP only, because that is more important.
Yes..very possible..Or, this may be the reason they will give regarding the huge delays we are facing..
I still hope for a different propulsion, but if they faced delayes because of Brahmos into the first Scorpenes, it would make it worth it again. But if they will just normal diesel - electric subs with without Brahmos, they can't justify this deal.