What's new

Beijing Preps 10-Story Oil Drilling Platform for South China Sea despite Wary Vietnam

. . . .
We have own drilling platforms. There are even a surplus. So PV Drilling recently leases one to Brunei.



41932_drilling.jpg

PV Drilling will provide Heavy Tender Assist Semi-Submersible Drilling Unit “PV DRILLING V” for Brunei Shell Petroleum Company Sdn Bhd. — Photo courtesy of PVN

Read more at http://vietnamnews.vn/economy/53627...-rig-for-brunei-firm.html#zi6EzZ63ccUOTc7T.99

I thought Vietnam is strong? Vietnam shall start anti China protest, burn Chinese factories in vietnam and attack Chinese. I am waiting for it cos our oil rig will start drilling soon. :enjoy:

China start the drilling during trade war is smart move. Many factories start shift to Vietnam but if Vietnam burn Chinese factories, it will send a wrong message to investor. But then they have to tolerate Chinese oil drilling in Spratly island. :lol:

US will not do anything but watch good show only.
I told you previously. It’s harder to beat chinese now. They dress like locals, eat like locals, behave like local Vietnamese. Not easy for rioters to recognize chinese from the crowd.
 
.
We have own drilling platforms. There are even a surplus. So PV Drilling recently leases one to Brunei.



41932_drilling.jpg

PV Drilling will provide Heavy Tender Assist Semi-Submersible Drilling Unit “PV DRILLING V” for Brunei Shell Petroleum Company Sdn Bhd. — Photo courtesy of PVN

Read more at http://vietnamnews.vn/economy/53627...-rig-for-brunei-firm.html#zi6EzZ63ccUOTc7T.99


I told you previously. It’s harder to beat chinese now. They dress like locals, eat like locals, behave like local Vietnamese. Not easy for rioters to recognize chinese from the crowd.
Vietnam bought PV Drilling V from Singapore or rent?
http://www.pvdrilling.com.vn/en-US/The-Fleet/Semi-Submersible-Rig/PV-DRILLING-V-TAD/pvd.htm

Rig Name/ Type

PV Drilling V/ Semi-Submersible Self – Erecting Tender Assist Drilling Rig

Design

KFELS SSDT 3600E, 6 COLUMN STABILIZED DRILLING RIG

Builder/ Year Build

KFELS SINGAPORE/ 2011


Classification

ABS +A1, COLUMN STABILIZED DRILLING TENDER

IMO Certification

IMO MODU Code 1989

Unit Flag

Vietnam

Overall Length

367 ft

Main deck dimension

308ft (L) × 118ft (W) × 67ft (H)

Water depth

Between 32ft and 800ft with conventional mooring

Up to 6,500 ft with pre-laid mooring

Gross Tonnage

15,839 T

Max Drill Depth

30,000 ft below mud line

Main Columns

Two (02) × Center columns ( 40ft L × 30ft W × 42ft H)

Four (04) × AFT/FWD columns ( 42ft 10inch L × 30ft W × 42ft H)

Pontoons

Two (02) each 308ft (93.87m) Length x 41ft (12.49m) Breadth x 20ft (6.09m) Depth

Breadth outside pontoons: 154ft 4inch

Draft and Displacement



Draft

Displacement

Field Transit/ Survival

26ft

15677MT @ 26ft

Operating

40ft

18566MT @ 40ft



50ft

20759MT @ 50ft

Helideck

83.2ft diameter, Octagon shape

Maximum allowable weight 13 MT

Design for fully loaded S-61N, S-92, Super Puma L2, MI-17

Helicopter Refueling facilities

CAP 437, classification Society ABS rules IMO MODU code, SOLAS

Accommodation

160 persons

Operating Conditions

Max wave Height 29.85 ft (9.1m)

The variable deck & column load: 3,600 MT

Survival conditions

Max wind: 100 Knots

Max wave height 31ft

Max current at surface: 2.92 Knots, at bottom: 1.5 Knots

The variable deck & column load: 3,000 MT
 
.
Vietnam bought PV Drilling V from Singapore or rent?
http://www.pvdrilling.com.vn/en-US/The-Fleet/Semi-Submersible-Rig/PV-DRILLING-V-TAD/pvd.htm

Rig Name/ Type

PV Drilling V/ Semi-Submersible Self – Erecting Tender Assist Drilling Rig

Design

KFELS SSDT 3600E, 6 COLUMN STABILIZED DRILLING RIG

Builder/ Year Build

KFELS SINGAPORE/ 2011


Classification

ABS +A1, COLUMN STABILIZED DRILLING TENDER

IMO Certification

IMO MODU Code 1989

Unit Flag

Vietnam

Overall Length

367 ft

Main deck dimension

308ft (L) × 118ft (W) × 67ft (H)

Water depth

Between 32ft and 800ft with conventional mooring

Up to 6,500 ft with pre-laid mooring

Gross Tonnage

15,839 T

Max Drill Depth

30,000 ft below mud line

Main Columns

Two (02) × Center columns ( 40ft L × 30ft W × 42ft H)

Four (04) × AFT/FWD columns ( 42ft 10inch L × 30ft W × 42ft H)

Pontoons

Two (02) each 308ft (93.87m) Length x 41ft (12.49m) Breadth x 20ft (6.09m) Depth

Breadth outside pontoons: 154ft 4inch

Draft and Displacement



Draft

Displacement

Field Transit/ Survival

26ft

15677MT @ 26ft

Operating

40ft

18566MT @ 40ft



50ft

20759MT @ 50ft

Helideck

83.2ft diameter, Octagon shape

Maximum allowable weight 13 MT

Design for fully loaded S-61N, S-92, Super Puma L2, MI-17

Helicopter Refueling facilities

CAP 437, classification Society ABS rules IMO MODU code, SOLAS

Accommodation

160 persons

Operating Conditions

Max wave Height 29.85 ft (9.1m)

The variable deck & column load: 3,600 MT

Survival conditions

Max wind: 100 Knots

Max wave height 31ft

Max current at surface: 2.92 Knots, at bottom: 1.5 Knots

The variable deck & column load: 3,000 MT
I don’t know if bought or leased
Whatever the case, the rig belongs to PV Drilling.
Japan has at least one rig in SC Sea too operating on Vietnam‘s behalf.

@Suika

3629cbd4-af56-11e9-a61f-bc570b50c4e7_image_hires_163711.jpg


I think we should place hundreds of rigs like chess pieces on a chess board.
 
. . . .
This time around, my country will not take any viet refugees. China, please send them to the bottom of the ocean if you can. Thank you in advance. :wub:

This picture is for you. go back to China and joint to sea pirate bandit of CPC :enjoy:

2d4d033191b7319604ea466e388362cd50c274c4-16x9-x0y48w1600h900.png
 
Last edited:
.
Cochine better explain to us why he is still here amongst the living after being kia based on the picture of SEASI
 
.
Cochine better explain to us why he is still here amongst the living after being kia based on the picture of SEASI

There is Mig 21 from time of Vietnam war, for training only. I had dropped this jet to get new one, Mig 30 MKI is much more better... :dance3:
 
.
Last edited:
.
Are the Vietnamese not going to send its navy? I thought Vietnamese are going to fight and not just talk.

Missiles were not needed in 2014 so first thing is to see if enough pressure can be mounted to convince China to move the bully rig out of Vietnam's EEZ.

I thought Vietnam is strong? Vietnam shall start anti China protest, burn Chinese factories in vietnam and attack Chinese. I am waiting for it cos our oil rig will start drilling soon. :enjoy:

China start the drilling during trade war is smart move. Many factories start shift to Vietnam but if Vietnam burn Chinese factories, it will send a wrong message to investor. But then they have to tolerate Chinese oil drilling in Spratly island. :lol:

US will not do anything but watch good show only.

Bully China.

Japan nationalized the Senkaku islands yet Xi wants to visit next year.

Fake tough show can make china yield.

coast guard? no submarines? no corvettes? just coast guard? Was hoping Vietnamese launching missiles at the Chinese.

Coast Guard is the natural first step. Same with Japan. JCG goes first, if they need back up, the JMSDF steps in.
 
.
Back
Top Bottom